For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 18.04.1202 — Improvement Requirements and Timing of Completion

Reno Administrative Code, City of Reno, Nevada (Supp. No. 65, Update 1: codified through Ordinance No. 6740, adopted May 6, 2026) · Reno Annexation and Land Development Code § 18.04.1202

Corpus is an independent public-information project, not the official City of Reno website. Stable reference: corpuslaw.us/code/5a6d4da3-b140-45d1-a946-07109ce5d8ce

18.04.1202 - Improvement Requirements and Timing of Completion

(a) Applicant Responsibility for Improvements (1) The subdivider or developer shall construct, at their own expense, and within a period as determined by the City, all improvements required by the conditions of approval, the improvement drawings of record, and City Code. Any changes to the improvement plans of record, other than those minor in nature, shall be approved by the Administrator prior to construction. All private improvements within each construction phase of a subdivision, except for recreational facilities, shall be constructed in accordance with the improvement drawings of record. (2) An excavation permit is required for excavation within the City's right-of-way. A grading permit and/or building permit shall be obtained prior to any grading. (3) Subdivision improvements inspection, testing verification, and acceptance shall be in accordance with City Code. (b) Improvement Plans Required (1) General Improvement plans shall be to the approval of the Administrator prior to final plat approval or issuance of building permits; and improvements shall be constructed to City standards prior to release of security or issuance of certificates of occupancy. (2) Improvement Plan Submittals a. Prior to the installation of any improvements, the subdivider or developer shall file all appropriate documents as determined by the Administrator. b. All plans and documents submitted shall meet the requirements of NRS Chapter 625, Chapter 18.06 Land Division, and this article. The first sheet of the improvement plans shall contain the statement "These plans, sheets 1 through _______ , have been prepared in accordance with the approved tentative map, conditions of approval, and Reno Municipal Code." c. Within 30 days, the Administrator shall complete its review of the plans and documents and advise the subdivider's engineer or surveyor of any revisions or corrections. (c) Timing of Completion The timing for completion of required improvements shall be according to following standards: (1) Completion of Public Improvements All improvements shown on the plans of record, including primary and secondary or emergency access, shall be constructed and completed within and to serve the subdivision or development prior to the issuance of any certificate of occupancy for the subdivision or development, unless otherwise stated in the terms of an improvement agreement pursuant to Section 18.04.1203, below. For phased subdivision or development projects, please see Section 18.04.1202(c)(4), below. (2) Completion of Private Improvements a. All private improvements within each construction phase of a subdivision or development, with the exception of recreational facilities, shall be constructed in accordance with the improvement drawings of record and shall be verified by the engineer of record prior to the issuance of any certificate of occupancy for each phase. b. Private recreational facilities shall be installed and operational by the time certificates of occupancy have been issued for 75 percent of the dwelling or commercial units within each construction phase of the subdivision. (3) Completion of Off-Site Improvements All required improvements located outside the subdivision, development boundary, or phase that are necessary to support the specific subdivision, whether public or private, shall be installed and/or completed and operational prior to the issuance of any certificate of occupancy for any structure within the subdivision phase. (4) Completion of Improvements in Phased Projects When the subdivision or development is to be constructed in more than one phase, a phasing plan for all improvements within each construction phase is required according to Section 18.04.1202(b), above. Each construction phase as developed, shall stand on its own and meet the requirements of the total subdivision. All improvements shown on the plans of record, including primary and secondary or emergency access, shall be constructed and completed within the designated construction phase prior to the issuance of any certificate of occupancy for that phase.

Ask a question about Reno law

Corpus searches the Reno sections it holds and shows the ones that match, with their citations. Free, no sign-in.