Sec. 74.350. - Baseline monitoring reports.
(a) Within 180 days after the effective date of the adoption of a categorical pretreatment standard, or 180 days after the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing significant industrial users subject to such categorical pretreatment standards and discharging into or scheduled to discharge into the municipal wastewater system shall submit a report to the City. (b) At least 90 days prior to commencement of any discharge, new sources, including industrial users which have changed their operation or processes, shall submit a report to the City. A new source shall also report the method it intends to use to meet applicable pretreatment standards and pretreatment requirements, and give estimates of its anticipated flow and quantity of pollutants to be discharged. (c) Each report submitted under subsections (a) and (b) of this section shall include: (1) Identifying information. The industrial user shall submit the name and address of the facility, including the name of the operator and owners. (2) Permits. The industrial user shall submit a list of any environmental control permits held by or for the facility. (3) Description of operation. The industrial user shall submit a brief description of the nature, average rate of production, and standard industrial classifications of the operation carried out by the user. This description shall include a schematic process diagram which indicates points of discharge into the municipal wastewater system from the regulated processes. (4) Flow measurement. The user shall submit information showing the measured average daily and maximum daily flow in gallons per day into the municipal wastewater system from regulated process streams and other streams, as may be necessary to allow use of the combined waste stream formula set out in 40 CFR 403.6(e). (5) Measurement of pollutants. (A) The industrial user shall identify the categorical pretreatment standards applicable to each regulated process. (B) The industrial user shall submit the results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the pretreatment standards or director of regulated pollutants in the discharge from each regulated process. Both daily maximum and long-term average concentrations, or mass where required, shall be reported. The sample shall be representative of daily operations and shall be performed in accordance with procedures set out in 40 CFR 136. Where the standard requires compliance with Best Management Practices or pollution prevention alternatives, the user shall submit documentation as required by the control authority or the applicable standard to determine compliance with the standard. (C) A minimum of four grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide, and volatile organics. All other pollutants will be measured by composite samples obtained through flow proportional sampling technique. If flow proportional composite sampling is infeasible, samples may be obtained through time proportional sampling techniques or four grab samples if the user proves to the satisfaction of the Director that such a sample will be representative of the discharge. (D) Samples should be taken immediately downstream from pretreatment facilities if such exist, or immediately downstream from the regulated process if no pretreatment exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment, the user should measure the flows and concentrations necessary to allow use of the combined wastestream formula of 40 CFR 403.6(e) in order to evaluate compliance with the pretreatment standards. Where an alternate concentration or mass limit has been calculated in accordance with 40 CFR 403.6(e), this adjusted limit along with supporting data shall be submitted to the control authority. (E) Sampling and analysis shall be performed in accordance with the techniques prescribed in 40 CFR 136, and amendments thereto. Where 40 CFR 136 does not contain sampling or analytical techniques for the pollutant in question, or where the administrator determines that the 40 CFR 136 sampling or analytical techniques are inappropriate for the pollutant in question, sampling and analysis shall be performed by using validated analytical methods or any other applicable sampling and analytical procedures, including procedures suggested by the POTW or other parties, approved by the administrator. (F) The control authority may allow the submission of a baseline report which utilizes only historical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures. (G) The baseline report shall indicate the time, date, and place of sampling, and methods of analysis, and shall certify that such sampling and analysis is representative of normal work cycles and expected pollutant discharges to the POTW. (6) Special certification. A statement, reviewed by an authorized representative of the industrial user and certified by a qualified professional, indicating whether pretreatment standards and pretreatment requirements are being met on a consistent basis and, if not, whether additional operations and maintenance and/or additional pretreatment is required in order to meet the pretreatment standards and pretreatment requirements. (7) Compliance schedule. If additional pretreatment and/or operations and maintenance will be required to meet the pretreatment standards and pretreatment requirements, the user must provide the shortest schedule by which the industrial user will meet such additional pretreatment and/or operations and maintenance. The completion date in this schedule shall not be later than the compliance date established for the applicable pretreatment standard or pretreatment requirement. A compliance schedule pursuant to this section must meet the requirements set out in SRC 74.260(a)(14). (8) All baseline monitoring reports must comply with SRC 74.270. (A) Where the industrial user's categorical pretreatment standard has been modified by a removal allowance (40 CFR 403.7), the combined wastestream formula (40 CFR 403.6(e)), and/or a Fundamentally Different Factors Variance (40 CFR 403.13) at the time the user submits the report required by this section, the information required by subsections (c)(6) and (7) of this section shall pertain to the modified limits. (B) If the categorical pretreatment standard is modified by a removal allowance (40 CFR 403.7), the combined wastestream formula (40 CFR 403.6(e)), and/or a Fundamentally Different Factors Variance after the user submits the report required by this section, any necessary amendments to the information requested by subsections (c)(6) and (7) of this section shall be submitted by the user to the control authority within 60 days after the modified limit is approved.
(Prior Code, § 74.350; Ord. No. 13-96; Ord. No. 65-2002; Ord. No. 22-2003; Ord. No. 25-06)
Ask a question about Salem law
Corpus searches the Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.