§ 18.04.302 — Limits on Grading (Cut and Fill)

Reno Administrative Code, City of Reno, Nevada (Supp. No. 65, Update 1: codified through Ordinance No. 6740, adopted May 6, 2026) · Reno Annexation and Land Development Code § 18.04.302

Corpus is an independent public-information project, not the official City of Reno website. Stable reference: corpuslaw.us/code/5ae33852-da26-4854-9b0b-f86d426e32a0

18.04.302 - Limits on Grading (Cut and Fill)

(a) Authority NRS Section 278.250 and NRS Chapter 445A authorize the adoption of grading regulations. (b) Purpose The purpose of this section is to: (1) Minimize environmental damage associated with grading; (2) Encourage balancing the site and reduce importing and exporting soil; (3) Limit visual scarring; (4) Limit unnecessary site disturbance; and (5) Limit impacts to water quality during grading. (c) Grading Permit Required No person shall excavate, fill, or otherwise alter the existing grade of any property without first obtaining a grading permit according to the procedures and criteria stated in subsection 18.08.606(b). (d) Major Site Plan Review Required An applicant shall obtain a major site plan review permit when engaged in any grading resulting in: (1) Grading resulting in cuts deeper than 20 feet and/or fills greater than ten feet in height; (2) Hillside development meeting the criteria in Section 18.04.402, Applicability; (3) Grading within a major drainageway meeting the criteria in Section 18.04.104(c), Applicability; or (4) Grading within the Parks, Greenways, and Open Space (PGOS) District, except for paths, public recreational amenities, or environmental restoration. a. Findings The following findings shall be made prior to granting a major site plan review (or conditional use permit, if elevated), in addition to the general major site plan review findings: 1. The proposed project mitigates environmental degradation, including slope failure, erosion, sedimentation, and stormwater run-off; 2. The proposed project utilizes grading practices that are appropriate for hillsides and designed to minimize the visibility of unsightly scarring; 3. The proposed project provides open space based on hillside constraints; 4. The proposed project adheres to applicable hillside development design standards and to Master Plan provisions related to development in sloped areas; and 5. The proposed project's site layout and design features adequately mitigate potential visual impacts of development near prominent ridgelines and within other visually prominent areas. (e) General Grading (Cut and Fill) Standards (1) Preservation of Stable Steep Slopes On all projects that include slopes steeper than three to one, existing stable slopes shall be preserved unless the City determines during subdivision or development review that cut and fill slopes are justified and necessary in the overall design of an otherwise acceptable development. (2) Fill Slopes Fill slopes in all zoning districts, including residentially zoned property, adjacent to residentially zoned property shall comply with the standards in Section 18.04.1404, Grading, for all use types. (3) Location of Cut and Fill Slopes a. Wherever feasible, cut and fill slopes adjoining parcel boundaries shall be located within the parcel that the slope is visible from or within a common area. b. Tops and toes of cut and fill slopes steeper than 5:1 at property boundaries shall not encroach into the right-of-way. c. Tops and toes of cut and fill slopes steeper than 5:1 shall be located at least 18 inches behind a sidewalk and at least six feet behind the face of a curb where no sidewalk is provided. d. Cut and fill slopes exceeding 5:1 shall not be located within ten feet of sewer or storm drain access locations. e. The Administrator may approve exceptions to these standards in consultation with the City Engineer for hillside developments and other situations where level areas are not warranted for future sidewalk construction or infrastructure maintenance purposes. (4) Noxious Weed Abatement Applications proposing grading activities on sites with noxious weeds, as defined by the State of Nevada, shall prepare and implement a noxious weed monitoring and management plan. The plan shall address construction and post construction activities to monitor, eradicate, and prevent the spread of noxious weeds. The plan shall be implemented and enforced throughout the life of the project. (5) Re-Vegetation Required After Final Grading a. Temporary stabilization shall be applied in accordance with the Truckee Meadows Construction Site Best Management Practices Handbook and in accordance with the State's General Permit. b. Cut and fill slopes steeper than 3:1 shall have riprap and revegetation. Alternative designs may be approved by the Administrator, subject to an approved geotechnical report. c. Soil tests shall be conducted after final grading operations are complete and prior to planting to determine required soil amendments that may be needed for the site. d. Re-vegetation shall commence the following late fall with approved security and temporary irrigation (if necessary) provided to ensure proper re-establishment of disturbed areas. e. All slopes disturbed by grading, including on site/in-lot slopes that are not necessary for construction staging, shall be reseeded with native shrubs, grasses, etc., consistent with existing on-site native vegetation upon completion of final grading. These areas shall be bonded to ensure proper re-establishment of the vegetation, with temporary irrigation if deemed necessary, based on seed mix, and time of year. f. The re-vegetation plan shall include plans to stockpile existing topsoil and vegetative strippings and reapply the material to all disturbed areas that are not formally landscaped. g. Re-vegetation shall be a uniform perennial vegetative cover with a density of 70 percent of the native background vegetative cover for the unpaved areas and areas not covered by permanent structures. h. Rocks used for riprap and retaining walls shall be of a color consistent with the site, or landscaping shall be installed sufficient to provide 20 percent coverage in three years. i. Establishment of coverage will be judged at the end of the second or third year of installation by Development Services staff in the form of an administrative decision, subject to appeal. j. The Administrator shall monitor the re-vegetated areas to identify problems that could prevent or interfere with successful re-vegetation projects. Monitoring activities should react to problems which include: the establishment of invasive weeds, erosion (rilling) caused by sudden or steady runoff that can damage restored areas, failure or lack of vigor in introduced plants, unfavorable amounts of moisture (too little or too much), and damage resulting from human trespass. (6) No Tracking of Grading Material onto Streets or into Storm Drains Material loosened by grading activity shall not be tracked onto adjacent streets or washed down storm drains. The drive apron onto the street shall be stabilized with pavement, gravel, or other approved covering. (7) Site Design Applicants for a grading permit with a retaining wall, cut slope, or fill slope exceeding four feet in height shall comply with the slope treatment standards for hillside developments in Section 18.04.409, Slope Treatment, to the satisfaction of the Administrator. (8) Tree Protection Applicants for a grading permit shall comply with the tree protection standards in 18.04.105, Tree Protection, as applicable.

(Ord. No. 6692, § 1(Exh. A), 1-8-25)

Ask a question about Reno law

Corpus searches the Reno sections it holds and shows the ones that match, with their citations. Free, no sign-in.