§ 26-135 — Erosion prevention and sediment control requirements
Code of Ordinances, City of Burlington, Vermont (Current through Ord. 8-3-26, passed August 3, 2026) · Burlington Code of Ordinances § 26-135
Corpus is an independent public-information project, not the official City of Burlington website. Stable reference: corpuslaw.us/code/5b65323d-e45b-4d2b-9ba5-c9105431845b
26-135 Erosion prevention and sediment control requirements.
(a) Design requirements. All erosion prevention practices, sediment control practices, waterway and watercourse protection practices and construction site access practices shall meet the design criteria set forth in the Vermont Standards & Specifications for Erosion Prevention & Sediment Control, 2006, and as amended, City of Burlington, Department of Public Works Public Sewer, Stormwater and Erosion Control Specifications, Standards and Management Practices Design Manual, latest version, and the Burlington Comprehensive Development Ordinance, latest version, and shall be adequate to prevent transportation of sediment from the site to the satisfaction of department of public works. In the event of conflicting design criteria within these standards, the stricter shall prevail. (b) General performance criteria for erosion prevention and sediment control. The following are required performance criteria: (1) Prevent erosion and the transport of sediment off lot, onto the public streets and sidewalks, into the municipal stormwater system, and/or waters of the state. Earthen material hauled offsite by way of a dump truck or similar method does not constitute erosion or sedimentation; (2) Prevent parking of any construction or construction related vehicles on city owned green space. Damage to green space shall be immediately addressed; (3) Take any and all steps necessary to abate erosion and to clean up all resulting sediment deposited, discharged or found to exist off lot, on city streets and sidewalks, and/or in the city stormwater system; (4) Maintain project erosion prevention and sediment control devices/measures and perform requisite cleanup of resulting sedimentation. This may include, but is not limited to, daily sweeping of streets and sidewalks and cleaning city stormwater catch basins; (5) Specify appropriate seed and fertilizer applications that are ecologically sound and site specific; (6) Specify an appropriate mulch when and where needed and adequate anchoring measures to prevent mulch from being blown away; (7) Specify an effective grass re-vegetation program. Turf replacement is recommended in areas where re-vegetation of grass proves difficult with seeding and mulch. To reestablish all existing and proposed green space and, where practical, consider porous (pervious) pavers and associated pervious subsurface; (8) Engage the contractor to be proactive in planning and executing construction phase activities with the goal of preventing erosion and controlling sediment; (9) Identify the parties to the EPSC plan and clearly define their respective roles and responsibilities including, but not limited to, the contractor, the onsite erosion coordinator, those responsible for project adherence to the EPSC, and those participating in inspections and acceptance of final site stabilization; and (10) Define the overall strategy for the EPSC plan by: a. Limiting actual disturbance area and time of disturbance; b. Employing proper site stabilization (addressing soil preparation for final seeding and landscaping, seed, pesticide/herbicide use, and mulch); c. Specifying stone and/or grass swale lining where appropriate; d. Specifying when and where necessary to employ erosion control blankets or mats; e. Specifying locations for silt fence and construction barrier fence; and f. Specifying catch basin inlet protection during construction, cleanup and maintenance and post-construction (operational) system operation and maintenance. (11) Prior to and during construction, erosion control measures shall be installed and maintained in accordance with EPSC plan established with this permit approval. At a minimum, the project EPSC plan shall: a. Identify the contractor who is responsible for installing, implementing, and maintaining the EPSC plan and measures; b. Identify the onsite contractor who is responsible for the day-to-day monitoring, oversight, and inspections required in the EPSC plan; c. Assure that any amendments to the project EPSC plan are filed with the department of public works and the department of planning and zoning; d. Provide that the erosion control measures remain in place until vegetation has become established on all disturbed surfaces and clearly identify under what conditions final site stabilization has occurred; and, e. Provide a process whereby the department of public works and/or the department of planning and zoning participate in the final site stabilization program. (c) Major impact, subdivision, and/or planned unit development projects. (1) Each EPSC plan shall address: a. Construction access route. Construction activities and land disturbing activities subject to the provisions of this division shall require the installation of at least one (1) stabilized temporary construction access. Construction site access routes regulated under this division shall be clearly delineated of the project site plans and subject to approval by the department of public works. b. Winter site stabilization. All land disturbance activity where practical shall be scheduled for completion no later than October 15 and temporary site stabilization achieved no later than October 15. By the end of the growing season, perennial cover shall be established (seed and mulch to be applied by October 1) and non-vegetated protection measures shall be installed by October 15 and continuously thereafter if land disturbance activities occur after the growing season. In the event land disturbance activities are planned to occur between the dates of October 15 and April 15, approval for such work may be granted by the department of public works, following the submittal and approval of a winter construction erosion control plan consistent with the Vermont Standards & Specifications for Erosion Prevention & Sediment Control, 2006, and as amended. c. Temporary site stabilization. Soil may be exposed for a maximum of forty-eight (48) hours. All denuded and disturbed areas must receive temporary stabilization in conformance with this section by implementing soil covering BMPs such as, but not limited to; mulching, straw matting, plastic covering, sodding, etc. Construction and land disturbance activities shall be planned and sequenced to limit the amount of exposed area and to avoid occurring during rainy periods. Clearing limits shall be clearly marked onsite and kept as small as possible. d. Protection of adjacent properties. All sediment from land disturbing activities shall be kept on site through the use of cover practice BMPs, structural BMPs and other appropriate construction management measures. Where possible, a vegetative buffer strip shall be preserved and maintained around the site boundary. All soil stock piles on site shall be placed as far as possible from any and all drainage ways including storm drains systems and roadside ditches and swales. All soil stockpiles on site shall be placed within the development envelope and outside of any natural area buffers (wetlands, riparian, etc.) All soil piles on site shall also be covered with mulch, plastic or some other suitable cover practice BMP until the soil is either used or removed from the site. Silt fencing and/or other perimeter controls shall be implemented to inhibit offsite sediment transport. Where possible, a vegetated buffer strip shall be maintained in front of silt fence or its equivalent. e. Maintenance. All construction access routes, cover practice BMPs and structural BMPs shall be inspected weekly, and immediately following each rain event causing runoff to ensure they are functioning properly. Any maintenance that is required to ensure the proper operation and performance of these BMPs shall be completed immediately. f. Landscaping and final stabilization requirements. Any area of land for which the natural vegetative cover has been either partially or wholly cleared or removed by land disturbance activities subject to this division shall be revegetated within twenty-one (21) days from initial disturbance for such clearing and construction. Additionally, the following requirements apply until such time as final site stabilization has been achieved: 1. Reseeding must be done with an annual or perennial cover crop accompanied by placement of straw mulch or its equivalent of sufficient coverage to control erosion until such time as the cover crop is established over ninety (90) percent of the seeded area. 2. Replanting with native woody and herbaceous vegetation must be accompanied by placement of straw mulch or its equivalent of sufficient coverage to control erosion until the plantings are established and are capable of controlling erosion. 3. Any area of revegetation must exhibit survival of a minimum of seventy-five (75) percent of the cover crop throughout the year immediately following revegetation. Revegetation must be repeated in successive years until the minimum seventy-five (75) percent survival for one (1) year is achieved. 4. Any and all accumulated sediments transported off site and deposited onto city streets, and sidewalks shall be routinely and frequently swept up and properly disposed of so as to prevent their discharge into stormwater and/or the city’s public sewer. (2) Plan requirements. The erosion prevention and sediment control plan shall be prepared by or under the direction of a licensed professional engineer, a certified professional in erosion and sediment control (CPESC), or a certified inspector in erosion and sediment control (CIESC) and demonstrate conformance to the erosion and sediment control requirements and criteria contained in subsection (c) of this section. All erosion and sediment control devices must be installed and stabilized before the start of construction. The erosion prevention and sediment control plan shall contain both narrative and map(s) that clearly provide the following information: a. Contact information. The name, address, and telephone number of all persons having a legal interest in the property and the tax reference number and parcel number of the property or properties affected. b. General description. A general description of the project including a map identifying the location of the property and parcel boundaries. c. Natural resources. A map of existing onsite natural resources including soil type (including porosity and erodibility factor (k-factor) if available), types and location of vegetative covering, natural drainage ways, brooks, streams, ponds, wetlands and other surface waters (including intermittent streams) and associated buffer zones, including any surface waters within three hundred (300) feet from the site. d. Grading plan. A grading plan at a minimum scale of one (1) inch = forty (40) feet. The grading plan shall include existing and proposed contours at maximum intervals of five (5) feet. The grading plan shall also include the location of the temporary construction entrance and any soil stockpiles that will be maintained on the site. e. Infrastructure. A map identifying existing infrastructure both on and adjacent to the site, including roads, driveways, culverts, drainage structures, roadside ditches, etc. f. BMPs. A description of each of the best management practices to be used on the site, and a map identifying the locations where each of the best management practices will be installed and maintained. g. Maintenance schedule for each BMP. (d) All other projects, conditions, or activities. The erosion prevention and sedimentation control plan shall consist of a completed small project erosion prevention and sediment control form and shall: (1) Indicate disturbance limits and the protection of existing vegetation that is to be preserved; (2) Depict clearing and grading limits, which shall be kept to the minimum practicable; (3) Address diverting the flow of runoff away from cleared and graded areas; (4) Address temporary and permanent stabilization of the site. (5) Address the protection of any channels or drainage courses that may become enlarged or destabilized from erosion. (6) Address the protection of any stormwater catch basin that may receive stormwater from the site during and after construction, and (7) Indicate the best management practices that shall be implemented consistent with achieving the general performance criteria of subsection (c).
(Ord. of 12-15-08(2), § 26-3-15)