§ 15.92.070 — Permit and Service Fees
Code of Ordinances, City of North Las Vegas, Nevada (Supp. No. 146: codified through legislation passed and adopted on or before August 5, 2026) · North Las Vegas Municipal Code § 15.92.070
Corpus is an independent public-information project, not the official City of North Las Vegas website. Stable reference: corpuslaw.us/code/5c390662-a6ba-4725-91c5-58863535449f
15.92.070 - Permit and Service Fees.
City of North Las Vegas Department of Land Development and Community Services Permit and Service Fee Schedule I. General. Purpose. The permit and service fee schedule establishes fees for permits and the associated inspections required in the 2018 edition of the International Fire Code (IFC) as adopted by the City of North Las Vegas by Ordinance 2906, and to establish fees for services performed by the Division of Building and Fire Safety of the City of North Las Vegas Department of Land Development and Community Services. The permit and service fees are intended to offset costs of regulating conditions hazardous to life or property as specified in the North Las Vegas Fire Code. Definitions. All terms not defined in this schedule have the meanings set forth in the IFC, as adopted by the City Council of the City of North Las Vegas. General Provisions. The fees outlined in this schedule are to be applied independently of each other. Failure to pay fees within the time period specified on the permit application, work order, or invoice from the City of North Las Vegas is sufficient grounds to withhold a permit or inspection, or to void a previously issued permit. Federal, state, and local governmental entities are exempt from the payment of permit and plan check fees. Nonprofit organizations are not exempt from the payment of fees. Where any person conducts an activity or use not specifically mentioned or identified herein, the Building Official or the Fire Code Official shall have the power to require a permit for such activity or use and to classify the activity or use into the permit category it most closely resembles. The determination of permit fees for such activity or use shall be at the sole discretion of the Building Official or the Fire Code Official, based on the fee schedule. Nothing in this section shall be construed to apply to any activity or use specifically covered in any other title of this Code. II. Annual and Temporary Permit, Business License and Associated Inspection Fees. Permits required by the IFC, as amended by the City of North Las Vegas, shall have associated fees as specified below. A. Annual and Temporary Permits and Business License Inspection Fees. (See subsection C. for a list of the most commonly required permits.) 1. Annual permits | $80.00 per category 2. Temporary permits | $100.00 per category 3. Failure to pay for annual permits within sixty (60) days of permit inspection (fee charged in addition to the initial permit fees) | $80.00 per category 4. Failure to obtain a required temporary permit (Fee charged in addition to the required permit fee) | $100.00 per required permit 5. Business license inspection: See permit fees above. If no permits are required, no additional fees are levied. B. Reinspections for Annual and Temporary Permits and Business Licenses. 1. First and second reinspection to verify correction of deficiencies noted during a business license or permit inspection have been corrected | No fee 2. Third and subsequent reinspections to verify correction of deficiencies noted during a business license or permit inspection | $80.00 per inspection C. Permit Categories. The following categories represent the most common activities requiring a permit. Additional information may be found by referring to the referenced subsection of 105.6 of the International Fire Code, 2018 Edition. IFC 105.6 Required Permits Subsection Subsection | Permit | Subsection | Permit 105.6.1 | Aerosol products | 105.6.26 | Liquid- or gas-fueled vehicles or equipment in assembly buildings 105.6.2 | Amusement buildings | 105.6.27 | LP-gas 105.6.3 | Aviation facilities | 105.6.25 | Lumber yards and woodworking plants 105.6.3 | Aircraft repair hangar | 105.6.28 | Magnesium 105.6.49 | Automobile wrecking yard (waste handling) | 105.6.29 | Miscellaneous combustible material storage 105.6.5 | Cellulose nitrate film | 105.6.52 | Monitoring facilities 105.6.6 | Combustible dust-producing operations | 105.6.31 | Motor fuel-dispensing facilities 105.6.7 | Combustible fibers | 105.6.32 | Open burning 105.6.49 | Commercial rubbish-handling operations (waste handling) | 105.6.33 | Open flames and torches 105.6.8 | Compressed gases | 105.6.34 | Open flames and candles 105.6.9 | Covered and open mall buildings | 105.6.35 | Organic coatings 105.6.10 | Cryogenic fluids | 105.6.36 | Outdoor assembly event 105.6.11 | Cutting and welding | 105.6.37 | Places of assembly 105.6.12 | Dry cleaning plants | 105.6.38 | Plant extraction systems 105.6.13 | Exhibits and trade shows | 105.6.39 | Private fire hydrants 105.6.14 | Explosives | 105.6.53 | Proprietary/self-monitoring 105.6.15 | Fire hydrants and valves | 105.6.40 | Pyrotechnical special effects material 105.6.51 | Fire protection systems | 105.6.41 | Pyroxylin plastics 105.6.14 | Fireworks (explosives) | 105.6.42 | Refrigeration equipment 105.6.16 | Flammable or combustible liquids | 105.6.43 | Repair garages 105.6.17 | Floor finishing | 105.6.44 | Rooftop heliports 105.6.18 | Fruit and crop ripening | 105.6.54 | Special activity 105.6.19 | Fumigation and insecticidal fogging | 105.6.45 | Spraying or dipping 105.6.20 | Hazardous materials | 105.6.46 | Storage of scrap tires and tire byproducts 105.6.21 | HPM facilities | 105.6.47 | Temporary membrane structures and tents 105.6.22 | High-piled storage | 105.6.48 | Tire-rebuilding plants 105.6.23 | Hot work operations | 105.6.55 | Tire storage 105.6.24 | Industrial ovens | 105.6.56 | Wood and plastic pallets III. Hazardous Materials Range Fees. Facilities storing or using large quantities of hazardous materials are to have their permit fees augmented by the following range table. The range is based on maximum quantities that are stored and/or used at any given time, rounded to the nearest unit of measurement for the substance (gallons for liquids, pounds for solids and cubic feet at NTP for gases). The fees specified in the range table are in addition to the permit category fees above. Range fees for liquids, solids, and gases are to be independent of each other. Range Calculation Table* Liquids (Gallons) | Solid (Pounds) | Gases (ft. 3 at NTP) | Fee | Range 0 to 55 | 0 to 550 | 1 to 198 | No additional fee | 0 56 to 499 | 551 to 999 | 199 to 1,998 | $80.00 | 1 500 to 945 | 1,000 to 1,999 | 1,999 to 3,599 | $160.00 | 2 946 to 1,835 | 2,000 to 2,999 | 3,600 to 6,799 | $240.00 | 3 1,836 to 4,499 | 3,000 to 3,999 | 6,800 to 16,399 | $320.00 | 4 4,500 to 15,179 | 4,000 to 4,999 | 16,400 to 34,999 | $400.00 | 5 15,180 to 65,580 | 5,000 to 9,999 | 35,000 to 53,999 | $480.00 | 6 65,581 to 69,999 | 10,000 to 10,999 | 54,000 to 73,999 | $560.00 | 7 70,000 to 74,999 | 11,000 to 11,999 | 74,000 to 79,999 | $640.00 | 8 75,000 to 84,999 | 12,000 to 14,999 | 80,000 to 89,999 | $720.00 | 9 85,000 and up | 15,000 and up | 90,000 and up | $800.00 | 10 *Underground storage tanks are to be charged one-half of the fee indicated above. IV. Fees for Other Services. Other services provided by the Division of Building and Fire Safety of the City of North Las Vegas Department of Land Development and Community Services are subject to the fees set forth below. Service | Fee* Plan review fee—Fire protection plans | $100.00 or the fee as determined by the building permit fee in Title 15, whichever is greater** Plan review fee—Building plans reviewed by Division of Building and Fire Safety | $100.00 per permit or any fire specific review fee specified in Title 15, whichever is greater*** Plan review—Corrections, revisions, and as-built | $80.00 per occurrence per permit Initial inspection for permitted construction | No additional fee First and subsequent reinspections to verify correction of deficiencies noted during a construction inspection have been corrected | $80.00 per inspection Second and subsequent inspections due to a partial inspection or partial approval | $80.00 per inspection Same day inspections (requested after 3:00 p.m. on previous business day) | $160.00 per inspection Application for alternate material or method or practical difficulty | $80.00 per application. One request allowed per application. Consultation regarding projects prior to submission for a building permit and for projects not requiring a building permit | $80.00 per hour rounded up to the nearest ½ hour (one hour minimum) Fire watch service | $80.00 per hour per inspector (three hour minimum+) Unauthorized construction fees (installing a fire system without approved plans) | $250.00 or double the permit fee, whichever is greater Inspection(s) outside of normal business hours | $80.00 per hour per inspector per permit (three hour minimum+) Fire flow test | $80.00 per test Technical report reviews (fire and life safety reports, hazardous materials reports, etc.) | $80.00 per hour rounded up to the nearest ½ hour (one hour minimum) File search (excluding file search conducted for response to public records request) | $80.00 per hour rounded up to the nearest ½ hour (one hour minimum) Expedited plan review services | 75 percent the plan review fee as determined by the building permit fee in Title 15 Consultation or testimony by any fire personnel in a civil proceeding | $160.00 per hour requested Emergency apparatus or unit standby | $300.00 per hour, with a four hour minimum Tank removal or abandonment | $80.00 per tank First and second reinspections to verify correction of deficiencies noted during a complaint inspection have been corrected | No fee Third and subsequent reinspections to verify deficiencies noted during a complaint inspection have been corrected | $80.00 per inspection *Fees associated with same-day, after hours, and construction reinspections are to be applied to each inspection associated with a unique permit number. ** $100.00 minimum fee does not apply to sprinkler systems in single family residences or duplex. *** $100.00 fee does not apply to single family residences or duplexes. + Total time is to include one-half hour travel to and one-half hour travel from the site.
(Ord. No. 2906, § 2, 8-15-2018)
Ask a question about North Las Vegas law
Corpus searches the North Las Vegas sections it holds and shows the ones that match, with their citations. Free, no sign-in.
