For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 10-130 — Emergency plans and emergency preparedness measures required for certain buildings

Code of the City of Miami, Florida (Supp. No. 24, Update 1: codified through Ordinance No. 14472, adopted June 11, 2026) · Miami City Code § 10-130

Corpus is an independent public-information project, not the official City of Miami website. Stable reference: corpuslaw.us/code/5cc07031-c823-4902-8bea-64e7e73657ae

Sec. 10-130. - Emergency plans and emergency preparedness measures required for certain buildings.

(a) For purposes of this section, the term "facility" shall mean community residential homes licensed under F.S. ch. 419, assisted living facilities licensed under F.S. ch. 429, and nursing homes licensed under F.S. ch. 440, which caterer to the elderly. (b) Any facilities located in the city shall prepare and annually update a comprehensive emergency management plan ("plan"). At a minimum, the plan must provide for components that address emergency evacuation transportation; adequate shelter arrangements; post-disaster activities, including provisions for emergency power generators with sufficient capacity to power the facility's fixed or portable heating, ventilation and air conditioning ("HVAC") system in order to maintain an ambient temperature of 81 degrees or less in one or more designated rooms for a period of a minimum of 96 hours in the event of the loss of electrical power after the foreseeable disaster passes; fuel to run the generator(s) for a minimum of 72 hours, whether stored entirely on site or provided for by periodic deliveries contracted for in advance of the start of hurricane season each year; bottled or potable water; food when the facility provides food to its residents on a daily basis in the normal course of the facility's operations; staffing; and when the facility provides custodial care, medical, or assisted living services, it shall provide for individual identification of residents, transfer of records, and communication with families (subject to residents' written consent and controlling regulations ((e.g. HIPAA)). The plan is subject to review and approval by the city's emergency manager which shall not be unreasonably withheld. During the review of the plan, the emergency manager will complete his or her review within 60 days and either approve the plan or advise the facility of necessary revisions. (c) Any existing facility shall comply with the provisions of this section within 90 days of the effective date of the ordinance from which this section derives. Commercially reasonable efforts to retrofit existing facilities shall be made. Notwithstanding the foregoing, if it is not practicable or feasible to install the required generator(s) on-site of an existing facility, then the operator may contract with a third-party vendor for a portable generator(s) in the event of a foreseeable disaster. The foregoing provision for the installation and/or placement of the temporary and/or permanent generator(s) are subject to approval by all appropriate governmental agencies and/or departments. (d) After the effective date of this section, any new facility shall not receive a certificate of use or a temporary certificate of use until the provisions of this section have been satisfied. (e) Compliance with these requirements for such facilities shall be mandatory. (f) Facilities shall be equipped with generators that are able to power essential services as set forth in subsection (a), including but not limited to, elevators, lights, emergency alarms, and air conditioning ("A.C.") in one or more designated room(s) within the facility. Designated room(s) means a public, common, or private space which can safely and lawfully house residents in an appropriate fashion pre- and post-foreseeable disaster. (g) Notwithstanding any requirement mentioned herein, facility staff are to be on site within 24 hours of a foreseeable disaster, or as soon as safely possible, unless they are required to remain at the facility. This does not negate the requirement to have staff on site and available to run the required generator(s) and other life safety necessities. (h) If the facility requires additional time to process and submit all the requested information above, the reservation or application must be renewed for an additional 180 days. If the process is not completed within the two 180-day periods provided above, the reservation or application will expire and a new reservation or application cannot be processed on that property for 30 days. (i) Such review costs shall be as stated by the City Code, as amended. (j) A violation of this section may be enforced pursuant to the provisions proscribed in chapter 2, article X of the City Code, and any other remedies as provided by law, including but not limited to, an action for injunctive relief in the circuit court. The use of one remedy shall not preclude the use of another. (1) If the violator is found to have violated this section, the code enforcement board may impose a fines as proscribed in section 2-817 of the City Code and such fines shall continue to accrue so long as the violation continues to exist on the property. (2) The code enforcement board is authorized to make a finding of irreparable/irreversible harm pursuant to chapter 2, article X and assess a one-time fine as allowed by law. (3) A property in violation may also be subject to losing its certificate of use and/or business tax receipt pursuant to sections 2-211, 31-48, 31-49 of the City Code, as amended.

(Ord. No. 14279, § 2, 5-9-24)

Ask a question about Miami law

Corpus searches the Miami sections it holds and shows the ones that match, with their citations. Free, no sign-in.