For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 803.070 — Deferral of construction of certain improvements

Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 803.070

Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/5ccca766-fb21-4351-b726-ca2ddf803c28

Sec. 803.070. - Deferral of construction of certain improvements.

(a) Applicant initiated deferral. An applicant may apply to defer the construction of the following improvements, upon filing an application and paying the application fee: (1) Boundary streets. (A) Construction of boundary streets may be deferred if: (i) The development site abuts a boundary street section, and the existing vertical or horizontal alignment for the street section neither meets nor can be constructed within the limits of the development site frontage in a manner that conforms to the Public Works Design Standards for future final street grades and alignment; (ii) The development site abuts a local street, the development site has less than 150 feet of frontage, and the use will generate 20 or less new vehicle trips per day; (iii) The development site abuts a local street and there is no improved street section or street improvement deferral for the boundary street within 150 feet of the property corners of the development site; or (iv) Unusual or special conditions exist that, in the opinion of the Director, would warrant a deferral of all or a part of the improvement. (2) Sidewalks. (A) Construction of sidewalks may be deferred if: (i) For property within all zones other than industrial and employment zones: (aa) The sidewalk is not on a collector street or arterial street; and (bb) Less than one-half of the required sidewalks on the side of the block where the sidewalk is to be constructed have already been constructed. (ii) For property within industrial and employment zones: (aa) The sidewalk would not be part of a pedestrian route to a school, shopping center, park, church, or other pedestrian traffic generator, or identified in a local safe routes to school plan as a facility in need of improvement; and (bb) The deferral would not pose a threat to public safety and welfare, based upon review of pedestrian/vehicular traffic on the street, the width and condition of the street, and on-street parking. (B) Unless otherwise provided in the deferral agreement, when sidewalk construction has been deferred, the property owner shall: (i) Grade and slope the area to the future sidewalk grade; (ii) Avoid planting trees in the sidewalk area, or building fences, retaining walls, steps, or other impediments to the future sidewalk; and (iii) Note on the plans for the development that a deferment has been granted but that sidewalk construction may be ordered by the City at any time. (b) City required deferral. The Director may require deferral of the construction of part or all of one or more of the improvements identified in subsection (a) of this section at any time. Deferral pursuant to this subsection shall be at no cost to the applicant. (c) Deferral agreement. When a deferral is allowed or required pursuant to this section, the applicant shall enter into a deferral agreement. The deferral agreement shall be in a form approved by the City Attorney, shall be filed in the deed records of the appropriate county, and shall provide that the required improvements will be constructed at such time as the Director determines or at such other time as may be specified by resolution of the Council. (d) Notation on plat. The deferral of any improvements shall be noted on the final plat.

(Prior Code, § 803.070; Ord. No. 31-13)

Ask a question about Salem law

Corpus searches the Salem sections it holds and shows the ones that match, with their citations. Free, no sign-in.