§ 511.60 — Responsibility to keep in good operating condition, written order, citations and civil fines
Minneapolis Code of Ordinances (Supp. No. 73, Update 1: codified through Ordinance No. 2026-020, adopted June 25, 2026) · Minneapolis Code of Ordinances § 511.60
Corpus is an independent public-information project, not the official City of Minneapolis website. Stable reference: corpuslaw.us/code/5ce16efe-209f-4bd2-af45-05604750fe66
511.60. - Responsibility to keep in good operating condition, written order, citations and civil fines.
The entire length and each piece of the lateral, whether or not in active use, shall be maintained and kept in operating condition by the owner adequate to collect and transmit all wastewater that is discharged into the public sanitary sewer system. Any failure to maintain the lateral and keep it in operating condition adequate to collect and transmit all wastewater that is discharged into the public sanitary sewer system may result in the city engineer or city engineer's designee issuing a written order to the owner of the property setting forth the correction or repair required to be done and specifying the date by which such repair is to be completed. The date will be determined by the city engineer or city engineer's designee according to the level of hazard and may vary from fifteen (15) to one hundred eighty (180) calendar days after the date of the notice. The written order will also state any requirements for televising and video recording of the sanitary sewer service lateral by the owner, to determine condition. Any property owner that has received a written order to make sanitary sewer service lateral repairs or corrections and/or submit required televising and video recording or any condition that is potentially non-compliant shall comply with such order by the date specified. An owner failing to comply with such an order by the date specified may be subject to administrative enforcement pursuant to Chapter 2 of this Code. The City, in its discretion, may also take any other appropriate and available enforcement action provided by law or use any available remedy to make the lateral consistent with city standards or to protect the city's system from a non-compliant lateral. These remedies shall include, but not be limited to: (1) Disconnection of the lateral, and (2) The city or its contractor televising and video recording the service lateral to determine its condition and the city or its contractor making the necessary corrections, repairs or replacements and applying all the costs and related expenses of all such work to the property owner's utility bill, and if not paid, assessing all of the cost of the work including reasonable overhead and attorney fees to the property as a special assessment on the tax rolls. If applied as a special assessment, the assessment procedures will be those outlined in this chapter. The city shall obtain any owner permissions or other permissions that are required to enter any particular piece of property where work will be performed. If an owner subject to an order under this section disputes the authority or legal reasonableness of the order issued by the city engineer or city engineer's designee, the owner shall serve a written protest and request for a meeting for review of the order with the city engineer or city engineer's designee. The written protest and request shall state all grounds for the protest and shall be served on the city engineer within ten (10) calendar days of receipt of the order. The city engineer or the city engineer's designee shall conduct a meeting with the appellant regarding the order within fifteen (15) calendar days of receiving the protest and request or before the date specified for performance of the order, whichever occurs first.
(Ord. No. 2018-055, § 9, 10-19-18)
Ask a question about Minneapolis law
Corpus searches the Minneapolis sections it holds and shows the ones that match, with their citations. Free, no sign-in.
