§ 22.805.060 — Minimum requirements for roadway projects
Seattle Municipal Code (Supp. No. 44: codified through Ordinance No. 127459, passed June 30, 2026) · Seattle Mun. Code § 22.805.060
Corpus is an independent public-information project, not the official City of Seattle website. Stable reference: corpuslaw.us/code/5cf2cb0f-1759-4347-86d4-85f61df0c21f
22.805.060 - Minimum requirements for roadway projects
A. Soil amendment. Retain and protect undisturbed soil in areas not being developed, and prior to completion of the project, amend all new, replaced, and disturbed topsoil (including construction lay-down areas) with organic matter to the extent required by and in compliance with the rules promulgated by the Director. B. On-site stormwater management. All roadway projects with 2,000 square feet or more of new plus replaced hard surface or 7,000 square feet or more of land disturbing activity shall meet the requirements for on-site stormwater management contained in Section 22.805.070, to the extent allowed by law, except as provided in subsection 22.805.060.E. C. Flow control. Roadway projects shall meet the minimum requirements for flow control contained in Section 22.805.080, to the extent allowed by law, as prescribed below, except as provided in subsection 22.805.060.E. 1. Discharges to wetlands. Roadway projects discharging into a wetland or to the drainage basin of a wetland, shall: a. Comply with Section 22.805.020 (Minimum requirements for all projects), including, but not limited to subsection 22.805.020.E (Protect wetlands). b. Comply with the minimum requirements for wetland protection contained in subsection 22.805.080.C (Wetland protection standards) if the existing hard surface coverage is less than 35 percent and one or more of the following apply: 1) The total new plus replaced hard surface is 5,000 square feet or more; or 2) The project converts 3/4 acres or more of vegetation to lawn or landscaped areas, and from the project there is a surface discharge into a natural or constructed conveyance system from the site; or 3) The project converts 2.5 acres or more of native vegetation to pasture and from the project there is a surface discharge into a natural or constructed conveyance system from the site. c. Comply with the minimum requirements for wetland protection contained in subsection 22.805.080.C (Wetland protection standards) if the existing hard surface coverage is greater than or equal to 35 percent and one or more of the following apply: 1) The total new plus replaced hard surface is 10,000 square feet or more. If the new plus replaced hard surfaces total 50 percent or more of the existing hard surfaces within the project limits, comply with subsection 22.805.080.C for the flows from the total new plus replaced hard surfaces; if the new plus replaced hard surfaces total less than 50 percent, comply with subsection 22.805.080.C for the flows from the total new hard surfaces. The project limits are defined by the length of the project and the width of the right-of-way; or 2) The project converts 3/4 acres or more of vegetation to lawn or landscaped areas, and from the project there is a surface discharge into a natural or constructed conveyance system from the site; or 3) The project converts 2.5 acres or more of native vegetation to pasture and from the project there is a surface discharge into a natural or constructed conveyance system from the site. 2. Discharges to listed creek basins. Roadway projects discharging into Blue Ridge Creek, Broadview Creek, Discovery Park Creek, Durham Creek, Frink Creek, Golden Gardens Creek, Kiwanis Ravine/Wolfe Creek, Licton Springs Creek, Madrona Park Creek, Mee-Kwa-Mooks Creek, Mount Baker Park Creek, Puget Creek, Riverview Creek, Schmitz Creek, Taylor Creek, or Washington Park Creek, or to the drainage basin of such creek, shall: a. Comply with subsection 22.805.080.D (Pre-developed forested standard) if the existing hard surface coverage is less than 35 percent and one or more of the following apply: 1) The project adds 10,000 square feet or more of new plus replaced hard surface; or 2) The project converts 3/4 acres or more of vegetation to lawn or landscaped areas, and from the project there is a surface discharge into a natural or constructed conveyance system from the site; or 3) The project converts 2.5 acres or more of native vegetation to pasture, and from the project there is a surface discharge into a natural or constructed conveyance system from the site; or 4) The project adds 5,000 square feet or more of new hard surface and, through a combination of effective hard surfaces and converted pervious surfaces, causes a 0.15 cubic feet per second increase in the 100-year recurrence interval flow frequency as estimated using a continuous model approved by the Director. b. Comply with subsection 22.805.080.F (Existing condition standard) if the criteria in subsection 22.805.060.C.2.a do not apply and the total new plus replaced hard surface is 10,000 square feet or more, and: 1) If the new plus replaced hard surfaces total 50 percent or more of the existing hard surfaces within the project limits, comply with subsection 22.805.080.F (Existing condition standard) for the flows from the total new plus replaced hard surfaces. The project limits are defined by the length of the project and the width of the right-of-way; or 2) If the new plus replaced hard surfaces total less than 50 percent of the existing hard surfaces within the project limits, comply with subsection 22.805.080.F (Existing condition standard) for the flows from the total new hard surfaces. The project limits are defined by the length of the project and the width of the right-of-way. 3. Discharges to non-listed creek basins. Roadway projects discharging into a creek not listed in subsection 22.805.060.C.2, or to the drainage basin of such creek, shall: a. Comply with subsection 22.805.080.D (Pre-developed forested standard) if the existing land cover is forested and one or more of the following apply: 1) The project adds 10,000 square feet or more of new plus replaced hard surface; or 2) The project converts 3/4 acres or more of vegetation to lawn or landscaped areas, and from the project there is a surface discharge into a natural or constructed conveyance system from the site; or 3) The project converts 2.5 acres or more of native vegetation to pasture, and from the project there is a surface discharge into a natural or constructed conveyance system from the site; or 4) The project adds 5,000 square feet or more of new hard surface and, through a combination of effective hard surfaces and converted pervious surfaces, causes a 0.15 cubic feet per second increase in the 100-year recurrence interval flow frequency as estimated using a continuous model approved by the Director. b. Comply with subsection 22.805.080.F (Existing condition standard) if the criteria in subsection 22.805.060.C.3.a do not apply and the total new plus replaced hard surface is 10,000 square feet or more, and: 1) If the new plus replaced hard surfaces total 50 percent or more of the existing hard surfaces within the project limits, comply with subsection 22.805.080.F (Existing condition standard) for the flows from the total new plus replaced hard surfaces. The project limits are defined by the length of the project and the width of the right-of-way; or 2) If the new plus replaced hard surfaces total less than 50 percent of the existing hard surfaces within the project limits, comply with subsection 22.805.080.F (Existing condition standard) for the flows from the total new hard surfaces. The project limits are defined by the length of the project and the width of the right-of-way. 4. Discharges to small lake basins. Roadway projects discharging into Bitter Lake, Green Lake, or Haller Lake, or to the drainage basin of such lake, shall comply with subsection 22.805.080.F (Existing condition standard) if the total new plus replaced hard surface is 10,000 square feet or more, and: a. If the new plus replaced hard surfaces total 50 percent or more of the existing hard surfaces within the project limits, comply with subsection 22.805.080.F (Existing condition standard) for the flows from the total new plus replaced hard surfaces. The project limits are defined by the length of the project and the width of the right-of-way; or b. If the new plus replaced hard surfaces total less than 50 percent of the existing hard surfaces within the project limits, comply with subsection 22.805.080.F (Existing condition standard) for the flows from the total new hard surfaces. The project limits are defined by the length of the project and the width of the right-of-way. 5. Discharges to a capacity-constrained system. In addition to applicable minimum requirements for flow control in subsection 22.805.060.C.1 through subsection 22.805.060.C.4, roadway projects discharging into a capacity-constrained system or its basin shall also comply with subsection 22.805.080.F (Existing condition standard) if the total new hard surface is 10,000 square feet or more unless the downstream system only includes ditches or culverts and has been determined to have sufficient capacity as specified in 22.805.020.H (Ensure sufficient capacity). D. Treatment. Roadway projects not discharging to the public combined sewer shall, to the extent allowed by law, except as provided in subsection 22.805.060.E: 1. If the site has less than 35 percent existing hard surface coverage, and the project's total new plus replaced pollution-generating hard surface is 5,000 square feet or more, comply with the minimum requirements for treatment contained in Section 22.805.090 for flows from the total new plus replaced pollution-generating hard surface and new plus replaced pollution-generating pervious surface; and 2. If the site has greater than or equal to 35 percent existing hard surface coverage and the project's total new plus replaced pollution-generating hard surface is 5,000 square feet or more, and a. If the new plus replaced pollution-generating hard surfaces total 50 percent or more of the existing hard surfaces within the project limits, comply with the minimum requirements for treatment contained in Section 22.805.090 for flows from the total new plus replaced pollution-generating hard surface and new plus replaced pollution-generating pervious surface. The project limits are defined by the length of the project and the width of the right-of-way; or b. If the new plus replaced pollution-generating hard surfaces total less than 50 percent of the existing hard surfaces within the project limits, comply with the minimum requirements for treatment contained in Section 22.805.090 for flows from the total new pollution-generating hard surface and new pollution-generating pervious surface. The project limits are defined by the length of the project and the width of the right-of-way; and 3. If the total new plus replaced pollution-generating pervious surfaces is 3/4 acres or more, and from which there is a surface discharge in a natural or constructed conveyance system from the site, comply with the minimum requirements for treatment contained in Section 22.805.090 for flows from the total new plus replaced pollution-generating pervious surface and the new plus replaced pollution-generating hard surface. E. For a roadway project that adds less than 50 percent to the existing hard surface within the project limits on a site having greater than 35 percent existing hard surface coverage, the requirements of subsections 22.805.060.B, 22.805.060.C, and 22.805.060.D to install drainage control facilities are modified based on infeasibility to the degree that (1) complete installation would require that an existing major publicly or privately owned infrastructure or utility element be relocated, or (2) the drainage control facility cannot be built and operated to discharge stormwater from the site under gravity flow conditions while meeting the applicable engineering standards. Compliance with subsections 22.805.060.B, 22.805.060.C, and 22.805.060.D is required to the degree that the project can avoid the infeasibility described in this subsection 22.805.060.E. Standard drainage review and approval shall be required whenever this subsection is used, whether or not Section 22.800.070 applies. The following are considered existing major infrastructure or utility elements: 1. Gravity flow pipe greater than or equal to 24 inches in diameter or gravity flow pipe which cannot be relocated to discharge under gravity flow conditions; 2. High-pressure gas pipe; 3. Pressure gas pipe greater than 8 inches in diameter; 4. Any other pressure pipe greater than 12 inches in diameter (e.g., water or steam); 5. Duct banks, vaults, or handholes, for underground electrical, fiber optic, or telecommunication services; 6. Bridge, building, or tunnel structural foundations; and 7. Foundations for walls greater than 6 feet in height or 15 feet in length.
(Ord. 127444, § 5, 2026; Ord. 126336, § 4, 2021; Ord. 124872, § 39, 2015; Ord. 124758, § 3, 2015; Ord. 123105, § 3, 2009.)
Ask a question about Seattle law
Corpus searches the Seattle sections it holds and shows the ones that match, with their citations. Free, no sign-in.