Inspection, surveillance, and monitoring.
Round Rock Code of Ordinances § 44-89
in effectSec. 44-89. - Inspection, surveillance, and monitoring.
(a) Minimum monitoring requirements.
(1) Significant users shall be required to self-monitor to meet, at a minimum, the requirements of the general pretreatment regulations.
(2) Users that have the potential to routinely discharge nondomestic sewage that contains concentrations of BOD, TSS, and COD higher than those defined for domestic sewage herein shall be independently monitored by the city for flow, BOD, TSS, COD and pH at least once a year. The control authority shall determine which users have this potential.
(3) The city may independently monitor all other users for flow, BOD, TSS, COD, and pH at a frequency in relation to their potential impact on the POTW, as determined by the control authority.
(4) The control authority may increase the frequency and/or add parameters to a user's self-monitoring program or the city's independent monitoring program to ensure compliance with the pretreatment requirements.
(b) Sampling and analysis.
(1) Significant users shall meet the requirements of the general pretreatment regulations for sampling and analysis. Other users shall meet the requirements for sampling and analysis as stated herein or in the user's control document.
(2) For all users, containers, preservation techniques, and holding times for samples shall comply with methods and procedures found at 40 CFR 136.
(3) For all users, sample analysis shall be in accordance with approved test procedures. The control authority, at this discretion, may specify which approved test procedure shall be used.
(4) Type of samples (grab or composite) and flow measurement shall be consistent with the type of discharge and parameters being regulated and shall be specified by the control authority in the permit.
(c) Control point. A user shall provide a control point for the purpose of sampling and flow measurement. The location and design of the control point shall be approved by the control authority. The control point shall be placed so that nondomestic sewage can be sampled and measured prior to any commingling with domestic sewage or nonprocess flows. Written approval of exceptions to this requirement shall be obtained by a user form the control authority. It is recommended that the control point for sampling and flow measurement be at the same location. Flow may be determined by water supply meter measurements if no other flow device is available and no other source of raw water is used. Other methods for estimating wastewater discharge flow must approved by the control authority.
(d) Inspection and entry.
(1) The control authority or his duly authorized representative, federal and state officials, upon presentation of credentials and other documentation as may be required by law, shall be permitted to gain access to such properties as may be necessary for the purpose of inspection, observation, sampling, set up and use of monitoring equipment, and inspection and copying of records having a direct bearing on the discharges of nondomestic sewage. Unreasonable delays in allowing access to the user's premises shall be a violation of this article. The control authority may obtain search warrants to secure access to facilities/property.
(2) Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled shall be promptly removed by the user at the written or verbal request of the control authority and shall not be replaced. The cost of clearing such access shall be borne by the user.
(3) The control authority shall be permitted to randomly sample and analyze the effluent from the users and conduct surveillance activities in order to identify, independent of information supplied by users, occasional and continuing noncompliance with pretreatment standards. Inspect and sample the effluent from each SIU as least once a year except as otherwise specified below:
a. Where the control authority has authorized the user subject to a categorical pretreatment standard, to forego sampling of a pollutant regulated by a categorical pretreatment standard in accordance with 40 CFR 403.12(e)(3), the control authority must sample the waived pollutants at least once during the term of the categorical user's control mechanism. In the event that the control authority subsequently determines that a waived pollutant is present or is expected to be present in the user's wastewater based on changes that occur in the user's operations, the control authority must immediately begin at least annual effluent monitoring of the user's discharge and inspection.
b. Where the control authority has determined that a user meets the criteria for classification as a non-significant user, the control authority must evaluate, at least once per year, whether a user continues to meet the criteria in 40 CFR 403.3(v)(2).
c. In the case of a user subject to reduced reposting requirements under 40 CFR 403.12(e)(3), the control authority must randomly sample and analyze the effluent from users and conduct inspections at least once every two years. If the user no longer meets the conditions for reduced reporting in 40 CFR 403.12(e)(3), the control authority shall immediately begin sampling and inspecting the user at least once a year.
(e) Use of contractors. The control authority may select an independent contractor to conduct the independent monitoring by the city.
(f) Accidental discharge/slug discharge control plans. The control authority shall evaluate whether each SIU needs an accidental discharge/slug discharge control plan or other action to control slug discharges within one year of being designated as a SIU. The control authority shall keep records of the activities associated with slug control evaluation and the results of such activities shall be available to the approval authority upon request. SIUs are required to notify the POTW immediately of any changes at its facility affecting potential for a slug discharge. The control authority may require any user to develop, submit for approval, and implement such plan or take such other action that may be necessary to control slug discharges. Alternatively, the control authority may develop such a plan for any user. The control authority shall approve the plan and will document compliance with such. An accidental discharge/slug discharge control plan shall address, at minimum the following:
(1) Description of the discharge practices, including nonroutine batch discharges;
(2) Description of stored chemicals;
(3) Procedures for immediately notifying the control authority of any accidental or slug discharged as required by this article; and
(4) Procedures to prevent adverse impact from any accidental or slug discharge. Such procedures include, but are not limited to, inspection and maintenance of storage areas, handling and transfer of materials, loading and unloading operations, control of plant site runoff, worker training, building of containment structures or equipment, measures for containing toxic organic pollutants, including solvent, and/or measures and equipment for emergency response.
(Code 1995, § 10.410; Ord. No. O-2020-0222, §§ I, II, 8-13-2020)
Source: City of Round Rock, Texas, Code of Ordinances (Municode Library, library.municode.com)URL: https://library.municode.com/tx/round_rock/codes/code_of_ordinances?nodeId=PTIICOOR_CH44UT_ARTIVPRPR_S44-89INSUMOFetched: 11/16/2026
