Olive Branch Code of Ordinances § 14-26 Building codes adopted; when effective.
Sec. 14-26. - Building codes adopted; when effective.
(a) The 2018 International Residential Code, 2018 International Building Code, 2018 International Plumbing Code, 2018 International Mechanical Code, 2018 International Fuel Gas Code, 2018 International Energy Conservation Code, and the 2017 National Electric Code, 2018 International Swimming Pool and Spa Code, and the 2018 International Existing Building Code, along with specified appendices, amendments, deletions, and special conditions as set forth above, and the Fee Schedule attached hereto as Exhibit "A," are hereby approved and adopted.
(b) The codes and fee schedule adopted herein shall take effect on October 1, 2019, and shall, on the date specified, supersede any previously adopted codes, until further amended.
Building Permit Fee Schedule
Exhibit "A" to Ordinance dated May 7, 2019
Valuation to determine building permit fees are calculated as follows:
A. $1,000.00 to $50,000.00 - $15.00 for the first $1,000.00 plus $5.00 for each additional thousand or fraction thereof
B. $50,001.00 to $100,000.00 - $260.00 for the first $50,000.00 plus $4.00 for each additional thousand or fraction thereof
C. $100,001.00 to $500,000.00 - $460.00 for the first $100,000.00 plus $3.00 for each additional thousand or fraction thereof
D. $500,0001.00 to $1,000,000.00 - $1,660.00 for the first $500,000.00 plus $2.00 for each thousand or fraction thereof
E. $1,000,001.00 to $5,000.000.00 - $2,660.00 for the first $1,000,000.00 plus $1.50 for each thousand or fraction thereof
F. $5,000,001.00 and up - $8,660.00 for the first $5,000,000.00 plus $1.00 for each thousand or fraction thereof
1. Residential Construction:
A. New Construction (Gross square footage under roof) .....$40.00 per sq. ft.
B. Additions (carports, garages, living areas) .....$40.00 per sq. ft.
C. Enclosing (carports, garages, patios, decks, porches) .....$30.00 per sq. ft.
D. Accessory Buildings (storage, covered patio, covered decks, detached garages/shop) .....$30.00 per sq. ft.
E. Renovations and Finishing Expandable Areas .....$20.00 per sq. ft./or *valuation
2. Commercial/Industrial Construction:
A. New Construction (Gross square footage under roof) .....$60.00 per sq. ft.
B. Plan Review .....½ Building permit fee
C. Additions/Enclosures/Accessory Buildings .....$60.00 per sq. ft.
D. Renovations/ Remodel .....$40.00 per sq. ft. or *valuation
*Valuation for the purpose of determining permit fees shall be established by the itemized valuation, including all equipment, material, and labor bid by the contractor, as embodied in the actual contract between the parties.
3. Temporary Trailers:
A. Construction Office - Residential .....$40.00 per sq. ft.
B. Construction Office - Commercial/Industrial .....$60.00 per sq. ft.
C. Real Estate Sales Office - Residential .....$60.00 per sq. ft.
D. Real Estate Sales Office - Commercial/Industrial .....$60.00 per sq. ft.
4. Temporary Tents:
A. Residential .....$60.00 per sq. ft.
B. Commercial/Industrial .....$60.00 per sq. ft.
5. Moving Buildings:
A. Residential (each building) .....$300.00
B. Commercial/Industrial (each building) .....$600.00
6. Demolition of Buildings:
A. Residential (each building) .....$300.00
B. Commercial/Industrial (each building) .....$600.00
7. Signage: (Gross square footage of the sign face) .....$2.00 per sq. ft.
A. Off-Premise Subdivision Directional Signs (each) .....$250.00/year
B. Co-Located Off-Premise Subdivision Directional Signs (each) .....$350.00/year
total for both signs
8. Fences:
A. Agricultural/Residential (flat fee per fence) .....$35.00
B. Commercial/Industrial (including walls, subdivision .....$50.00 fences flat fee)
9. Swimming Pools:
A. Public Pools (each) .....$300.00
B. Private Pools (each) .....$100.00
C. Swimming Pool Heater (each) .....$25.00
D. Swimming Pool Gas Piping (each outlet) .....$4.00
10. Brick Tie Inspection:) (Optional Inspection .....$25.00
11. Re-inspection Fee: (For all Inspection Types) .....
A. First Inspection Failure No Charge .....
B. Second Inspection Failure (of the same type and each succeeding inspection failure of the same type) .....$100.00
C. Brick Tie Inspection .....$25.00/each
D. Gas Pressure Re-Inspection (Outside City Limits) .....$50.00
12. Irrigation Permit: (Landscape Sprinklers) .....$25.00 for the 1st$1,000.00 of value, plus $5.00 for each additional $1,000.00 of value or fraction thereof.*
13. Generators: New/Replacements/Modifications (old equipment with new)
Residential/Commercial/Industrial .....Valuation
14. Solar Panels New/Replacements/Modifications
(old equipment with new)
Residential/Commercial/Industrial .....Valuation
15. Pallet Racking/Conveyor/Sorter Systems
New/Replacements/Relocate
Commercial/Industrial .....Valuation
16. Storage Tanks (all types): New/Replacements/Modifications
(old equipment with new)
Commercial/Industrial .....Valuation
17. Telecommunication (Cell Towers) Broadcast Towers: .....Valuation
New/Replacements/Modifications
(old equipment with new)
18. Plumbing Permit Fees:
A. Water Closet (each) .....$4.00
B. Water Basin (each) .....$4.00
C. Tub (each) .....$4.00
D. Shower (each) .....$4.00
E. Urinal (each) .....$4.00
F. Sink (each) .....$4.00
G. Garbage Disposal (each) .....$4.00
H. Dishwasher (each) .....$4.00
I. Washing Machine (each) .....$4.00
J. Sinks (service/mop) (each) .....$4.00
K. Floor/Hub/Roof Drain (each) .....$4.00
L. Vacuum Breaker (hose bib) (each) .....$4.00
M. Backflow Preventer (each) .....$4.00
N. Residential Water Heater (each) .....$4.00
O. Drinking Fountain (each) .....$4.00
P. Gas Piping (each outlet) .....$4.00
Q. Deep Seal Trap (each) .....$4.00
R. Main Water/ Sewer Service (New or Replacement) .....$15.00
S. Oil/Grease Trap (each) .....$15.00
T. Commercial/Industrial Water Heater (each) .....$10.00
U. Commercial/Industrial washing Machine (each) .....$10.00
V. Minimum Permit Fee .....$30.00
19. Electrical Permit Fees:
A. Residential .....$0.50 per Amp
1. New Service .....
2. Additions/Renovations .....
a. Service Amps Added .....$0.50 per Amp added.
b. Each Additional Circuit .....$10.00 per circuit added.
c. Additions to Existing Circuit(s) .....$25.00 per each circuit added.
3. Minimum Fee .....$30.00
B. Commercial/Industrial .....
1. New Service .....$1.00 per Amp
2. Additions/Renovations .....
a. Service Amps Added .....$1.00 per Amp added.
b. Each Additional Circuit .....$20.00 per circuit added.
c. Additions to Existing Circuit(s) .....$50.00 per circuit added.
3. Minimum Fee .....$30.00
C. Swimming Pools/Spas/Hot Tubs: .....
1. Public Pools/Spas/Hot Tubs (each) .....$150.00
2. Private Pools/Spas/Hot Tubs (each) .....$50.00
20. Mechanical Permit Fees: .....
A. Residential .....
1. Air Conditioning & Heating (New) .....$30.00 plus $4.00 per ton.
2. Replacements (A/C only, Heating only, A-Coil only, both A/C & Heating) .....$35.00 flat fee (each)
B. Commercial/Industrial .....
1. New or Replacements (Fee based on value of work) .....$40.00 for the 1st$1,000.00 of value plus $4.00 for each additional $1,000.00 of value or fraction thereof.*
C. Gas Piping .....$40.00 flat fee
D. Others (boilers, refrigeration, vent hoods, duct work(only), water heaters, all other installations) .....$40.00 for the 1st$1,000.00 of value plus $4.00 for each additional $1,000.00 of value or fraction thereof.*
*Valuation for the purpose of determining permit fees shall be established by the itemized valuation, including all equipment, material, and labor bid by the contractor, as embodied in the actual contract between the parties.
(Ord. of 7-20-04, §§ 1, 2; Ord. of 9-1-09, §§ 1, 2; Ord. of 3-15-11, §§ 1, 2; Ord. of 12-3-13, § 1, 2; Ord. of 5-20-14(1), §§ 1, 2; Ord. of 5-7-2019(2), §§ 1(Exh. A), 2, 3)