Reporting requirements.
Round Rock Code of Ordinances § 44-87
in effectSec. 44-87. - Reporting requirements.
(a) Baseline report. Categorical users shall submit baseline reports in accordance with the general pretreatment regulations.
(1) Within either 180 days after the effective date of the categorical pretreatment standard, or the final administrative decision on a category determination under 40 CFR 403.6(a)(4), whichever is later, existing categorical users currently discharging to or scheduled to discharge to the POTW shall submit to the control authority a report which contains the information listed in subsection (a)(2) of this section. At least 90 days prior to commencement of their discharge, new sources, and sources that become categorical users subsequent to the promulgation of an applicable categorical standard, shall submit to the control authority a report which contains the information listed in subsection (a)(2) of this section. A new source shall report the method of pretreatment it intends to use to meet applicable categorical standards. A new source also shall give estimates of its anticipated flow and quantity of pollutants to be discharged.
(2) Users described above shall submit the following:
a. Identifying information. The name and address of the facility, including the name of the operator and owner.
b. Environmental permits. A list of any environmental control permits held by or for the facility.
c. Descriptions of operations. A brief description of the nature, average rate of production, and standard industrial classifications of the operation(s) carried out by such user. This description should include a schematic process diagram which indicates points of discharge to the POTW from the regulated processes.
d. Flow measurement. Information showing the measured average daily and maximum daily flow, in gallons per day, to the POTW from regulated process streams and other streams, as necessary, to allow use to the combined wastestream formula.
e. Measurement of pollutants. The categorical pretreatment standards applicable to each regulated process. The results of sampling and analysis identifying the nature and concentration, and/or mass, where required by the standard or by the control authority, of regulated pollutants in the discharge from each regulated process. Instantaneous, daily maximum, and long-term average concentrations, or mass, where required, shall be reported. The sample shall be representative of daily operations and shall be collected and analyzed in accordance with procedures set out in 40 CFR 136. Where the standard requires compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required by the control authority or the applicable standards to determine compliance with the standard. The user shall take a minimum of one representative sample to compile the data necessary to comply with the requirements of this paragraph. Samples should be taken immediately downstream from pretreatment facilities if such exist or immediately downstream from the regulated process if no pretreatment exists. If other wastewaters are mixed with the regulated wastewater prior to pretreatment, the user should measure the flows and concentrations necessary to allow use of the combined wastestream formula in 40 CFR 403.6(e) to evaluate compliance with the pretreatment standards. Where an alternate concentration or mass limit has been calculated in accordance with 40 CFR 403.6(e), this adjusted limit along with supporting data shall be submitted by the control authority.
f. Signature and certification. All baseline monitoring reports must be signed and certified in accordance with 40 CFR 403.6(a)(2)(ii). This statement must be reviewed by an authorized representative of the IU and certified by a qualified professional, indicating whether pretreatment standards are being met on a consistent basis.
(3) The control authority may allow the submission of a baseline report which utilizes only historical data so long as the data provides information sufficient to determine the need for industrial pretreatment measures.
(4) The baseline report shall indicate the time, date and place of sampling and methods of analysis, and shall certify that such sampling and analysis is representative of the normal work cycles and expected pollutant discharges to the POTW.
(b) Compliance schedule progress reports.
(1) Should additional pretreatment or operation and maintenance be required to meet pretreatment standards, a compliance schedule will be issued. The schedule shall contain progress increments in the form of dates for the commencement and completion of major events leading to the construction and operation of additional pretreatment facilities required for the user to meet the applicable pretreatment requirements.
(2) No increment shall exceed nine months.
(3) The user shall submit a progress report to the control authority no later than 14 days following each date in the schedule and the final date of compliance. This report shall include as a minimum, whether or not the user complied with the progress increments, reasons for any delays, and steps being taken by the user to return to the established schedule.
(c) Reports on compliance with categorical pretreatment standard deadline. Within 90 days following the date for final compliance with applicable categorical pretreatment standards, or, in the case of a new source following commencement of the introduction of wastewater into the POTW, any user subject to such pretreatment standards and requirements shall submit to the control authority a report containing the information described in subsections (a)(2)d—f of this section. For users subject to equivalent mass or concentration limits established in accordance with 40 CFR 403.6(c), this report shall contain a reasonable measure of the user's long-term production rate. For all other users subject to categorical pretreatment standards expressed in terms of allowable pollutant discharge per unit of production this report shall include the user's actual production during the appropriate sampling period. All compliance reports must be signed and certified in accordance with 40 CFR 403.6(a)(2). Categorical users shall submit reports in accordance with the general pretreatment regulations on compliance schedule progress, compliance with categorical pretreatment standard deadlines, and continued compliance with categorical pretreatment standards.
(d) Periodic reports on continued compliance.
(1) All SIUs shall, at a frequency determined by the control authority but in no case less than twice per year, submit a report indicating the nature and concentration of pollutants and the estimated or measured daily maximum and average flows of the discharges to which pretreatment requirements are applicable for the reporting period. In cases where the pretreatment standard requires compliance with BMPs or pollution preventative alternative, the user must submit documentation required by the control authority or the pretreatment standard necessary to determine the compliance status of the user. All periodic reports must be complete, signed and certified in accordance with 40 CFR 403.6(a)(2)(ii).
(2) The control authority may require all other users and/or persons discharging nondomestic wastewater into the POTW to submit appropriate reports concerning the nature and concentration of pollutants in the discharge.
(3) All wastewater samples must be representative of user's discharge. Wastewater monitoring and flow measurement facilities shall be properly operated, kept clean, and maintained in good working order shall not be grounds for the user to claim that sample results are unrepresentative of its discharge.
(4) Where the standard requires compliance with a BMP or pollution prevention alternative, the user shall submit documentation as required by the control authority or the applicable standards to determine compliance with the standard.
(e) Reports of additional samples taken. If a user subject to pretreatment requirements monitors any pollutant more frequently than required using approved test procedures, the results of this monitoring shall be included in the periodic reports.
(f) Repeat sampling and reporting.
(1) If sampling performed by a user indicates a violation, the user must notify the control authority within 24 hours of becoming aware of the violation. The user shall also repeat the sampling and analysis and submit the results of the repeat analysis to the control authority within 30 days after becoming aware of the violation.
(2) Re-sampling by the IU is not required if the control authority performs sampling at the user's facility at least once a month, or if the control authority performs sampling at the user between the time when the initial sampling was conducted and the time when the user of the control authority receives the results of the sampling, of if the control authority has performed the sampling and analysis in lieu of the IU. If the city performed the sampling and analysis in lieu of the IU, the city well perform the repeat sampling and analysis unless the city notifies the user of the violation and requires the user to perform the repeat sampling and analysis and submit the results within the 30-day time frame.
(g) Sample collection and monitoring requirements. All sampling techniques and pollutant analyses used for compilation of data required to be submitted as part of a wastewater discharge application or report required by any pretreatment requirement shall be performed in accordance with the techniques prescribed in 40 CFR 136 unless otherwise specified in an applicable categorical pretreatment standard.
(h) Additional reports. The control authority has the right to request any additional reports from a user that are necessary to assess and assure compliance with the pretreatment requirements.
(i) Record keeping.
(1) Users and the control authority subject to the reporting requirements of this article shall retain, and make available for inspection and copying, all records of information obtained pursuant to any monitoring activities required by this ordinance and additional records obtained pursuant to monitoring activities undertaken by the user independent of such requirements and documentation associated with BMPs.
(2) Records shall include the date, exact place, method, and time of the sampling and the name of the person(s) taking the sample; dates analyses were performed; who performed the analyses; the analytical techniques or methods used; and the results of the analyses.
(3) Records shall remain available for a period of at least three years. This period shall be automatically extended for the duration of any litigation concerning the user of the control authority, or where the user has been specifically notified of a linger retention period by the control authority.
(j) Reports of changed conditions. Each user must notify the control authority of any significant changes to the user's operations or system which might alter the nature, quality, or volume of its wastewater at least 90 days before the charge.
(1) The control authority may require the user to submit such information as may be deemed necessary to evaluate the changed condition, including the submission of a wastewater discharge permit application under this article.
(2) The control authority may issue an individual wastewater discharge permit under this article in response to changed conditions or anticipated changed conditions.
(k) Reports of a potential problem.
(1) In the case of any discharge, including, but not limited to, accidental discharges, discharges of a nonroutine, episodic nature, a noncustomary batch discharge, a slug discharge or slug load, that might cause potential problems for the POTW, the user shall immediately telephone and notify the control authority of the incident. This notification shall include the location of the discharge, type of waste, concentration and volume, if known, and corrective actions taken by the user.
(2) A notice shall be permanently posted on the user's bulletin board or other prominent place advising employees who to call in the event of a discharge described in subsection (k)(1) above. Employees shall ensure that all employees who could clause such discharge to occur, are advised of the emergency notification procedure.
(3) SIUs are required to notify the control authority immediately of any changes at its facility affecting the potential for slug discharge.
(l) Analytical requirements.
(1) All pollutant analyses, including sampling techniques, to be submitted as part of a wastewater discharge permit application or report shall be performed in accordance with the techniques prescribed in 40 CFR 136 and amendments thereto, unless otherwise specified in applicable categorical pretreatment standards. If 40 CFR 136 does not contain sampling or analytical techniques for the pollutant in question, or where the EPA determines that Part 136 sampling and analytical techniques are inappropriate for the pollutant in question, sampling and analyses shall be performed by using validated analytical methods or any other applicable sampling and analytical procedures, including procedures suggested by the control authority or other parties approved by the EPA.
(2) Non-detectable sample results may only be used as a demonstration that a pollutant is not present if the EPA approved method from 40 CFR 136 with the lowest minimum detection level for that pollutant was used in the analysis.
(m) Sample collection. Samples collected to satisfy reporting requirements must be based on data obtained through appropriate sampling and analysis performed during the period covered by the report, based on data that is representative of conditions during the reporting period.
(1) Except as indicated in subsections (m)(2) and (3) below, the user must collect wastewater samples using 24-hour flow proportional composite sampling techniques, unless time proportional composite sampling or grab sampling is authorized in writing by the control authority. Where time proportional composite sampling or grab sampling is authorized in writing by the control authority, the samples must be representative of the discharge. The user must demonstrate in writing that the time-proportional or grab samples are representative of the discharge before the city may allow the user to submit such samples. The city must document in the users file the decision to allow alternative sampling or site-specific circumstances. Using protocols (including appropriate preservation) specified in 40 CFR 136 and appropriate EPA guidance, multiple grab samples collected during a 24-hour period may be composited prior to analysis as follows: for cyanide, total phenols, and sulfides the samples may be composited in the laboratory or the field; for volatile organics and oil and grease, the samples may be composited in the laboratory. Composite samples for other parameters unaffected by the composting procedures as documented in the approved EPA methodologies may be authorized by the control authority in writing as appropriate. In addition, grab samples may be required to show compliance with instantaneous limits.
(2) Samples for oil and grease, temperature, pH, cyanide, total phenols, sulfides, and volatile organic compounds must be obtained using grab collection techniques.
(3) For sampling required in support of baseline monitoring and 90-day compliance reports required by this article and 40 CFR 403.12(b) and (d), a minimum of four grab samples must be used for pH, cyanide, total phenols, oil and grease, sulfide and volatile organic compounds for facilities for which historical sampling data do not exist; for facilities for which historic sampling data are available, the control authority may authorized a lower minimum. For reports required by this article and 40 CFR 403.12(e) and 403.12(h), the IU is required to collect the number of grab samples necessary to assess and assure compliance by the applicable pretreatment standards and requirements.
(4) Total residual chlorine, pH and temperature samples cannot be "composited" under any circumstances.
(5) When sampling facilities that discharge less than 24 hours per day, the sampling must be representative of the user's wastewater discharge.
(6) During parts of the day when there is no discharge of process wastewater, standing water should not be disproportionately sampled and analyzed as it would not be representative of the discharge from the user.
(7) When there has been a change to existing users, such as the addition of treatment, historic data that does not represent the current discharge would not be able to be used to justify a lower minimum of grab samples.
(8) The city can require more than four grab samples to be taken and separately analyzed to ensure that sampling is representative.
(9) The sampling requirements apply to baseline reports, compliance schedule progress reports, reports on compliance with categorical pretreatment standard deadline, and periodic reports of continued compliance, noncategorical user reports and reports of additional samples taken.
(n) Date of receipt of reports. Written reports will be deemed to have been submitted on the date postmarked. For reports, which are not mailed, postage prepaid, into a mail facility serviced by the United States Postal Service, the date of receipt of the report shall govern.
(o) Certification statements for certification of permit applications and user reports.
(1) The following certification statement is required to be signed and submitted by:
a. Users submitting permit applications in accordance with this article;
b. Users submitting baseline monitoring reports under this article and 40 CFR 403.12(l);
c. Users submitting reports on compliance with categorical pretreatment standard deadlines under this article and 40 CFR 403.12(d); and
d. Users submitting periodic compliance reports required by this article and 40 CFR 403.12(e) and (h).
(2) The following certification statement must be signed by an authorized representative as defined in this article:
"I certify under penalty of law that his document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."
(Code 1995, § 10.408; Ord. No. O-2020-0222, §§ I, II, 8-13-2020)
Source: City of Round Rock, Texas, Code of Ordinances (Municode Library, library.municode.com)URL: https://library.municode.com/tx/round_rock/codes/code_of_ordinances?nodeId=PTIICOOR_CH44UT_ARTIVPRPR_S44-87REREFetched: 11/16/2026
