For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 33.526.250 — Connectivity

Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.526.250

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/5f2c3777-8edb-419f-8d7a-c9ee697e0619

33.526.250 Connectivity

A. Purpose. The connectivity requirement ensures that adequate street and pedestrian/bicycle connections will be provided for local access to development and access for emergency vehicles. This regulation implements the Gateway Master Street Plan and improves vehicular, pedestrian, and bicycle circulation throughout the plan district, while minimizing congestion on the arterial system. Where full street connections are not feasible, pedestrian and bicycle connections provide access for those most sensitive to the lack of direct connections. B. Where these regulations apply. The requirements of this section apply to all sites in the plan district. C. Requirements. 1. The Portland Bureau of Transportation determines the location and widths of rights- of-way and extent and timing of street improvements based on the Gateway Master Street Plan in the Transportation Element of the Comprehensive Plan. 2. Proposed development that may obstruct new street alignments as identified in the Gateway Master Street Plan is regulated by Chapter 17.88.

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.