§ 23-353 — Above-ground facilities installation and placement; undergrounding

Code of Ordinances of the City of Huntsville, Alabama (Supp. No. 30 (codified through Ord. No. 26-196, adopted March 12, 2026) with enacted ordinances through Ord. No. 26-837 (September 24, 2026) applied from official council minutes and ordinance copies) · Huntsville Code of Ordinances § 23-353

Corpus is an independent public-information project, not the official City of Huntsville website. Stable reference: corpuslaw.us/code/5f8a49e8-2101-4bd9-afe3-d84a1f5f78c9

Sec. 23-353. - Above-ground facilities installation and placement; undergrounding.

The city desires to promote the undergrounding of facilities in the rights-of-way, their judicious siting, and the use of the least obtrusive facilities in order to reduce or eliminate their impact or potential impact to the public health, safety, and general welfare or otherwise for rights-of-way management purposes. To this end each of the following shall apply relative to a provider's facilities: (1) A provider shall install its facilities underground without cost to the city: (i) in accordance with the subdivision regulations of the city, (ii) where substantially all of the facilities of the city d.b.a. Huntsville Utilities or other utilities or service providers in a given area are underground, or (iii) where the city adopts an underground plan and substantially all utility facilities or other facilities are placed underground. Except in the case of an emergency, a provider is not authorized to place above ground any of its facilities that have previously been underground without prior approval from the city engineer and subject to the applicable provisions of this division, its franchise with the city, or applicable law. Nothing herein shall be construed to prevent the above-grounding of those types of facilities which, due to technical limitations must be placed above ground, including small cell facilities and support structures, as such terms are defined in division 3, that have been issued a siting permit by the city or that use support structures that the city has permitted to remain above ground after its adoption of an underground plan contemplated by this subsection. (2) In the construction or upgrading of its facilities, a provider shall use the smallest, reasonably available equipment then in use by the provider or any of its affiliates. (3) A provider shall select locations for its above-ground facilities, both outside and in the rights-of-way, which comply with the city's visibility obstruction regulations; which are not within the paved or traveled portions of existing or platted rights-of-way, including the sidewalks, or which do not otherwise block or impede vehicle or pedestrian traffic; which do not block or impede existing public drainage facilities or channels or are otherwise in a designated floodway; or which otherwise raise a reasonable public health, safety, or welfare concern. (4) A provider shall, subject to approval of the city engineer, which shall not be unreasonably withheld, select locations and methods of installation and screening for its above-ground facilities which eliminate or reduce the impact to residential uses including those immediately adjacent to or on the same lot as the proposed facilities.

(Ord. No. 20-270, § 1, 4-9-2020)