Section 15. - Responsibility for Payment of Site Improvement Costs.
A. The subdivider shall furnish all site improvements required for normal neighborhood development within the subdivision including the dedication of all rights-of-way for minor streets and the permanent improvement thereof including curbs and gutters whereby lots front or side such a facility as well as all utilities, water lines, sanitary sewers and appurtenant drainage facilities required to serve the area within the subdivision in accordance with city standards.
B. Any subdivider who shall propose to plat a subdivision within one hundred (100) feet of a proposed major thoroughfare or collector street corridor as indicated on the current Major Street Plan of the Comprehensive Development Plan for Pasadena, Texas, shall participate as follows:
(1) Proposed major thoroughfare and/or collector street designed to serve an area greater than that of the subdivision and either passing totally within the confines, abutting, or adjoining the proposed subdivision development:
a. Right-of-way:
1. The developer shall cause to be dedicated to the city by plat approval, a maximum of fifty (50) feet right-of-way for a major thoroughfare or a maximum of forty (40) feet for a collector street.
2. Such additional right-of-way as may be indicated in the Comprehensive Development Plan, the Major Street Plan and any subsequent amendments thereto, as well as under Article IV, Required Improvements, Section 28, Schedule of Minimum Street Improvements of the Subdivision Ordinance, as hereby amended, shall be reserved for later purchase by the city. Said total right-of-way, however, shall not be less than one hundred (100) feet for a major thoroughfare or eighty (80) feet for a collector street.
3. In such instances whereby the developer does not own the land so required to be dedicated to the city, the developer shall pay to the city an amount equal to the fair market value of the land required based on the findings of an appraiser who shall be selected by the city. In the event the fair market value of the land so required is contested by the developer, both parties shall agree on the selection of a certified MAI-SRPA professionally affiliated appraiser within Harris County. The findings of the second appraisal shall be conclusive on both parties and the cost for such appraisal shall be equally borne by both parties. Said money to be deposited with the city by the developer shall be placed into an account so specifically designated, and the Legal Department shall initiate such procedures as necessary to acquire the property or institute condemnation proceedings.
b. Paving section:
1. The developer shall permanently improve one-half of the roadway surface of the ultimate proposed major thoroughfare or collector street in accordance with city specifications. In those instances whereby lots either back or side the facility, no direct driveway access shall be provided onto such roadways.
2. The paving section to be required for a major thoroughfare shall be one (1) twenty-four-foot, eight-inch crowned concrete section with continuous concrete curb and gutter along both sides, including appurtenant drainage facilities. The paving section to be required for a collector street shall be one (1) twenty-two-foot, seven-inch concrete section (slope drained) with continuous concrete curb and gutter along one (1) side, including appurtenant drainage facilities.
C. The subdivider shall provide for all street lighting within the proposed subdivision. The number, spacing, location, and style of such lighting fixtures shall be as described on that plat or drawing as prepared by the Houston Lighting and Power Company, Engineering Division. Rates shall be established on a per-fixture basis using a typical twenty-six-foot metal ornamental standard with a 9,500 lumen high pressure sodium vapor fixture as the norm, and such rates shall be in accordance with those rate schedules as officially published periodically by the Houston Lighting and Power Company.
D. The subdivider shall totally provide for initial street signing of all intersections within the subdivisions, save and except such traffic regulatory devices placed on said standards by the city through warrants of permanency. Rates for the installation of said street signs shall be in accordance with those current materials costs plus labor and shall be billed by the Department of Traffic and Transportation.
E. Permanent Access Easements. Lots that front on or take access from a permanent access easement must be a part of a unified development scheme where the owners of all lots within the subdivision as a precondition of property purchase, are legally bound together by deed restriction, contract or another constituted and binding homeowners association, corporation, or other organization with, as one of its purposes, the continued care and maintenance of all commonly owned properties within the subdivision, particularly the areas established as permanent access easements, and the authority and means to impose binding assessments upon the lot owners for that purpose. Each subdivision plat that contains a permanent access easement shall contain the following notation on the face of the plat:
"THIS SUBDIVISION CONTAINS ONE OR MORE PERMANENT ACCESS EASEMENTS THAT HAVE NOT BEEN DEDICATED TO OR ACCEPTED BY THE CITY OF PASADENA OR ANY OTHER LOCAL GOVERNMENT AGENCY AS PUBLIC RIGHTS-OF-WAY. THE CITY OF PASADENA HAS NO OBLIGATION, NOR DOES ANY OTHER LOCAL GOVERNMENT AGENCY HAVE ANY OBLIGATION, TO MAINTAIN OR IMPROVE ANY PERMANENT ACCESS EASEMENT WITHIN THE SUBDIVISION, WHICH OBLIGATION SHALL BE THE SOLE RESPONSIBILITY OF THE OWNERS OF PROPERTY IN THIS SUBDIVISION."
F. Restrictions of Access. A subdivision containing one or more permanent access easements may restrict public access unto lots within said subdivision by erecting gates approved by the City across the permanent access easements. Each individual property owner having frontage on a permanent access easement shall have perpetual access to their respective property, and shall not be denied passage through any gate system installed for the benefit of the subdivision. No gates shall be allowed to restrict access to any publicly accepted right-of-way. Said approved gates shall be permitted, constructed and maintained in accordance with all regulations of Section 13-10, Pasadena Code of Ordinances.
(Ord. No. 84-229, § 1, 9-3-85; Ord. No. 00-34, § 2, 3-14-00)