Tyler City Code § 10-510 Easements
Sec. 10-510. Easements
a. The property owner will be required to furnish all easements and rights-of-way required to serve the development. Where reasonable, utilities should be located within streets or alley rights-of-way. Notwithstanding the above, developers may offer easements outside of street and alley rights-of-way. All utility facilities existing and proposed throughout the property must be shown on the preliminary plat.
b. Easements shall be provided for both municipal and private utilities and must be recorded on the final plat or replat. Municipal easements for water, sanitary sewer, and storm sewer not in the public right-of-way shall be as follows:
Depth of Utility Line | Minimum Width of Easement 1
0-10' | 15'
10-15' | 20'
15-20' | 25'
>20' | 30' or greater
Notes: 1. For utility lines greater than 36" diameter, the minimum width of the easement shall be the minimum width as stated above plus the width (OD) of the conduit.
All municipal easements may be wider as determined by Development Services depending on the size of the utility and/or site-specific conditions. Private utility easements must be sized by the utility company. Proper coordination shall be established between the property owner and the applicable utility companies for the establishment of utility easements on adjoining properties. (Ord. No. O-2018-17; 2/14/18)
c. All water and sewer easements must be submitted in an acceptable form to the development services engineer.
