Mispillion River.
33 C.F.R. § 117.241
in effectEffective The draw of the Route 1/Rehoboth Blvd. Bridge, at mile 11.0, at Milford shall open on signal if at least 24 hours notice is given.
Source: eCFRURL: https://www.ecfr.gov/api/versioner/v1/full/2024-07-01/title-33.xmlFetched: 7/26/2026
