Pasadena City Code § 29-101 Materials.
Sec. 29-101. - Materials.
Irrigation piping shall be schedule forty PVC minimum on all main and lateral lines. Piping must be buried twelve (12) inches deep minimum to the top of piping and shall not be installed on any easements or rights-of-way.
(Ord. No. 17-009, § 1(Exh. A), 1-17-17; Ord. No. 25-197, § 1(Exh. A), 10-21-25)
