Sec. 4.21. - Pedestrian and bicyclist passage.

(1) Permit. A Temporary Occupancy Permit shall be obtained for any work that is conducted in or on a sidewalk or bicycle facility, including trails. A description of the purpose for any obstructions shall be provided, including a project schedule that describes duration, dates, and times of day. Any permit issued pursuant to the terms of this section may be revoked by the City Engineer for permit violations. (2) Site plan. A site plan shall be submitted for review. The Plan shall show any and all sidewalks, bicycle facilities, trails, bus stops, and traffic lanes, as well as all trees, lane striping, hydrants and traffic signs which will be affected. (3) Traffic Control Plan. A detailed routing and traffic control plan shall be submitted as part of the permit application where a sidewalk, bicycle facility or trail will be obstructed. The Plan shall demonstrate how pedestrian and bicyclist access will be maintained, and ADA Compliance satisfied. a. At least six (6) feet of space shall be kept clean and clear for the free passage of pedestrians in mixed-use commercial zone districts, as defined in Article 6 of Chapter 61 of the City of Grand Rapids Zoning Ordinance; b. At least four (4) feet of space shall be kept clean and clear in residential zone districts, as defined in Article 5 of Chapter 61 of the City of Grand Rapids Zoning Ordinance; and c. At least five (5) feet of space shall be kept for the passage of bicyclists where bicycle facilities are present. (4) Safety. Sidewalks or paths shall be defined on both sides by fencing, barricades, cones, construction tape or other devices for the purposes of delineating construction zones. If the construction area is prone to falling objects or debris a covered path shall be required which is covered by a hard roof and contains lighting. Sidewalks and paths shall be ADA compliant and kept free of equipment, materials, snow and ice, and debris. (5) Materials. Paths shall be made of dense (hard), non-porous, non-skid material that is resistant to settlement and penetration by narrow wheels, cane/walkers/crutches and small-heeled shoes in all weather conditions. (6) Signs. Detailed drawings of all signs, to include dimensions, intended to be placed for the purposes of directing pedestrian and bicycle traffic shall be submitted as part of the permit application. (7) Administrative Departures. If building operations or construction activities causing the sidewalk, bicycle facility, or trail obstruction would impair the safety of the public or substantially affect the constructability of a project, an Administrative Departure may be requested. A permit application shall be submitted with sufficient detail to indicate the nature and necessity of the request, as well as proposed mitigation measures. The Director may waive some or all of the requirements of this section. In making a departure decision, the Director shall consider: a. Street Type and Mode Emphasis from the Vital Streets Plan. b. Context and surrounding land uses, including topography. c. Vehicular, pedestrian, bicycle, and transit volumes. d. Nature of users (i.e. vulnerable populations, ADA accessibility, etc.). e. Proximity of traffic control devices and other safety elements (i.e. street lighting, sight lines, etc.). f. Availability and practicality of alternative routes (i.e. convenience, distance, level of service, continuity, logical terminus). g. Availability and practicality of alternative safety methods (i.e. flagmen provided by construction contractor, etc.). h. Time of day, time of week, time of year, duration. i. Nature of construction activities and their potential dangers to the public. (8) Approval. Permit approvals shall be limited to the time required for the essential needs of a project to be satisfied whereby occupancy of the sidewalk, bicycle facility or trail can be re-opened, or an alternative access plan can be instituted which more fully complies with this Chapter.

(Ord. No. 87-24, § 1, 3-31-87; Ord. No. 2018-06, § 3, 2-6-18)

Ask a question about Grand Rapids law

Corpus searches the Grand Rapids sections it holds and shows the ones that match, with their citations. Free, no sign-in.