Sec. 42-33. - Control and measurement of admissible industrial wastes.

(a) Submission of basic data. (1) Persons discharging abnormal sewage to a public sewer shall prepare and file with the Director of Public Works a report that shall include pertinent data relating to the quantity and characteristics of their wastes in accordance with Wisconsin DNR Permit No. WI-0020-001, Part II, Section D, Paragraph 7, within 90 days after being so notified by the Director of Public Works. (2) Similarly, each person desiring to make a new connection to the public sewers for the purpose of discharging industrial wastes shall prepare and file with the Director of Public Works a report that shall include actual or predicted data relating to the quantity and characteristics of the waste to be discharged in accordance with Permit No. WI-0020-001. A building permit shall not be issued until such report has been submitted and approved by the Director of Public Works. (b) Control manholes. (1) All monitored users, when directed by the Director of Public Works, shall construct and maintain needed control manholes to facilitate observations, measurement, and sampling of the wastes. Control manholes shall be located and built in a manner approved by the Director of Public Works. If measuring devices are to be permanently installed, they shall be of a type approved by the Director. (2) Control manholes and related equipment shall be installed at the expense of the person discharging the waste, and shall be maintained by said person in safe condition, accessible, and in proper operating condition at all times. (c) Metering of waste. (1) Devices for metering the volume of waste discharged may be required by the Director of Public Works if those volumes cannot otherwise be determined from the metered water consumption records. Metering devices for determining the volume of waste shall be owned and maintained by the person. Following approval and installation, such meters may not be removed without the consent of the Director of Public Works. (2) If installed metering devices malfunction or if metering devices are an impracticality, the person shall provide the Public Works Department with documented and certified material as required by the Director of Public Works so that the City can accurately determine the volume of waste discharged for billing purposes. Devices shall be calibrated yearly or as required. The calibration shall be made by a testing laboratory approved by the Director of Public Works. The City reserves the right to have the devices calibrated and the cost of such calibration billed to the person. (d) Compliance. Within 90 days after receiving notice from the Director of Public Works, each person who discharges industrial wastes into a public sewer shall have complied with this section. (e) Extension of time. When it can be demonstrated that circumstances exist which could create an unreasonable burden on the person to comply with the time schedule imposed, a request for an extension may be presented to the Director of Public Works who may grant an extension. (f) Waste sampling. Industrial wastes discharged into the public sewers shall be subject to periodic sampling and testing to determine character and concentration. All sampling and testing cost is to be at the expense of the person. The determination shall be made as often as deemed necessary by the Director of Public Works. If any testing by the City shall show a changed degree of pollutional load in the sewage or waste discharged, such new test results shall be used in computing the subsequent billings, but no reduction shall be made unless at least a full day of operation of the person's plant has undergone the test. Any person may request the City to make new tests, such tests to be of a minimum of 24 hours' duration. Such test shall be made when the plant is operating under normal conditions, and the burden shall be on the person requesting the testing to establish that such normal conditions prevail. Upon a determination by the Director of Public Works that such test was made when the plant was operating under normal conditions, the results of these tests shall be used in computing the subsequent billing in the manner previously prescribed. (g) Analysis. Laboratory test procedures used in the examination of industrial wastes shall be those set forth in Wis. Admin. Code Ch. NR 219, and shall be made by the City at the cost of the person.

(Code 1984, § 21.01(5); Ord. No. 33-93)