Sec. 16-75. - Alternative materials, design and methods of construction and equipment.
All local, state and federal laws and regulations shall be considered when interpreting provisions of this division and/or the Manual for the Design of Sanitary Sewers, 2026 Edition. In each instance, the more restrictive requirement shall govern unless sound engineering judgment can determine and prove that the more restrictive requirement would be otherwise unnecessary. In most instances, laws and regulations that are phrased more explicitly shall apply over those items that are not phrased as precisely. The provisions of the Manual for the Design of Sanitary Sewers, 2026 Edition, are not intended to prevent the installation of any material or to prohibit any design or method of construction not specifically prescribed by the manual, provided that any such alternative has been approved by the city engineer. An alternative material, design or method of construction may be approved where the city engineer finds that the proposed design is satisfactory and complies with the intent of the provisions of the Manual for the Design of Sanitary Sewers, 2026 Edition, and that the material, method or work offered is, for the purpose intended, at least the equivalent of that prescribed in the Code in quality, strength, effectiveness, fire resistance, durability and safety. All requests for alternative materials, designs or methods pursuant to this section must be submitted in writing to the office of the city engineer at the time the sanitary sewer permit application is submitted. If written approval from the city engineer is not received by the developer or his engineer within fifteen (15) days from the date of the submission of the request, then the request is automatically denied.
(Ord. No. 7522, § 1, 4-27-10; Ord. No. 9790, § 2, 7-14-26)