§ 51.10 — User charge system for use of public sewerage system
Code of Ordinances, City of Springfield, Illinois (Supp. No. 82: codified through Ordinance No. 146-04-26, enacted April 7, 2026) · Springfield, Ill., City Code § 51.10
Corpus is an independent public-information project, not the official City of Springfield website. Stable reference: corpuslaw.us/code/630a6f29-78db-41c1-ba23-1af1a6b8ee9d
§ 51.10. - User charge system for use of public sewerage system.
A user charge system is established for the use and service of the waste water system of each lot, building or premises having any connection to the waste water system, or which may otherwise discharge sewage or industrial wastes into the public waste water system or any part thereof. The monthly service charge shall recover operation and maintenance fixed costs, the office of public utilities billing costs, debt service costs and other costs the sewer system may incur. The service charge is based on the size of the user's water meter, using the five-eighths-inch meter as the base, and prorating the larger meters on their rated maximum capacity in gallons per minute (gpm), except that the service charge for any meter greater than six inches will be equal to the service charge for a six-inch meter. The monthly consumption charge, based on the quantity of water by the water meter or meters serving each lot, building or premises, shall recover the remaining operation and maintenance costs, equipment replacement costs, emergency sewer system repair costs, sewer system rehabilitation and reconstruction costs and other costs that the sewer system may incur. The accounting system established by the office of budget and management for all expenditures shall be in accordance with sewer revenue bond covenants. The sewer user charge shall be billed by the office of public utilities on a monthly basis in accordance with the following formula: UC = (CC1 × BU) + (CC2 × SU) + SC Where: UC = The monthly billed sewer user charge CC1 = Consumption charge of $0.57 per unit (1 unit = 100 cubic feet) applicable to customers in the city. CC2 = The consumption charge of $1.22 per unit (1 unit = 100 cubic feet) applicable to customers in the city. BU = Base unit is units 1 through 3 as measured by the meter, applicable to customers in the city. SU = Secondary unit is units 4 and above as measured by the meter, applicable to customers in the city. SC = The service charge applicable to customers in the city and based on meter size, in inches, as follows: Meter Size (In Inches) | Service Charge ⅝ | $ 5.05 ¾ | 7.57 1 | 12.62 1¼ | 20.20 1½ | 25.25 2 | 40.40 3 | 75.74 4 | 126.24 6 | 252.48 8 | 252.48 10 | 252.48 Effective March 1, 2024 the rates specified in this section as CC1, CC2 and SC shall increase by 32%. Effective March 1, 2025, rates shall then increase an additional 32%. Effective March 1, 2026 and every March 1 thereafter, the CC1, CC2 and SC rates shall then increase by the change in the annual Consumer Price Index (CPI) for the Water, Sewer, and Trash CPI-U (CUSROOOOSEHG) rounded to the nearest tenth of one percent. The CPI factor to be applied shall not be less than zero. The additional revenues generated from the new rates shall be designated solely for capital improvements and maintenance associated with sanitary sewers and combined sewers, and shall be deposited into the sewer fund for those purposes. This sewer user charge reflects only the city's portion of sewer user fees. Sewer system customers are also subject to charges levied independently by the Springfield Metro Sanitary District. Sewer service customers shall be notified annually in conjunction with a regular monthly bill, of the rate structure and that portion of the sewer user charge that is attributable to the cost of operation, maintenance and replacement. The adequacy of the user charge system shall be reviewed annually by certified public accountants in their annual audit report of the sewer revenue fund, and the user charge shall be revised periodically to reflect changes in operation and maintenance, equipment replacement, emergency sewer system repairs and sewer system rehabilitation and reconstruction. The Illinois Environmental Protection Agency, or its authorized representative, shall have access to any books, documents, papers and records of the City of Springfield which are applicable to the user charge system for the purpose of making audit, examination, excerpts and transcriptions thereof to insure compliance with the terms of the water pollution control revolving loan fund agreement.
(Ord. No. 307-4-96, § 1, 4-25-96; Ord. No. 141-4-13, § 1(Exh. A), 4-16-13; Ord. No. 060-02-24, § 1(Exh. A), 2-20-24)
Ask a question about Springfield law
Corpus searches the Springfield sections it holds and shows the ones that match, with their citations. Free, no sign-in.
