§ 91.2 — Building permit approval required
Code of Ordinances of the City of Huntsville, Alabama (Supp. No. 30 (codified through Ord. No. 26-196, adopted March 12, 2026) with enacted ordinances through Ord. No. 26-837 (September 24, 2026) applied from official council minutes and ordinance copies) · Huntsville Code of Ordinances, App. A, art. 91, § 91.2
Corpus is an independent public-information project, not the official City of Huntsville website. Stable reference: corpuslaw.us/code/6333ec76-b45b-48fc-8f77-175fb84d6c0e
91.2. - Building permit approval required.
A building permit shall not be issued until such time as the zoning administrator has determined that the proposed activity for which a building permit is required conforms to the provisions of this ordinance. To this end, the zoning administrator is authorized to require that every application for a building permit for excavation, construction, use of land, moving, alteration, or such other regulated activity be accompanied by a plan or plat drawn to scale and showing the following in sufficient detail to enable the zoning administrator to ascertain whether or not the proposed excavation, construction, use of land, moving, alteration, or such other regulated activity is in conformance with this ordinance: (1) The actual shape, proportion, and dimensions of the lot to be built upon. (2) The shape, size, and locations of all buildings or other structures to be erected, altered, or moved and of any buildings or other structures already on the lot. (3) The existing and intended use of all such buildings or other structures. (4) The setback and side lines of buildings on adjoining lots and such other information concerning the lot or adjoining lots as may be essential for determining whether or not the provisions of this ordinance are being observed. If the proposed excavation, construction, use of land, moving, alteration, or such other regulated activity as set forth in the application is in conformity with the provisions of this ordinance, the zoning administrator shall give his approval for the issuance of a building permit accordingly. If the zoning administrator does not approve the issuance of a building permit, he shall state in writing the cause for such disapproval. It shall be a violation of this ordinance to conduct any activity for which a building permit is required unless and until the Zoning Administrator has given his approval therefor.
(Ord. No. 07-460, § 10, 6-28-2007)
Ask a question about Huntsville law
Corpus searches the Huntsville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
