§ 77.120 — Bonds or other written evidence to be filed; final acceptance

Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 77.120

Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/6373c30c-4c1b-457d-a12d-20204f87bb4d

Sec. 77.120. - Bonds or other written evidence to be filed; final acceptance.

(a) No permit shall be issued pursuant to SRC 77.100 unless there is filed with the application a performance guarantee in the form specified in SRC 110.100, sufficient to satisfy the Director that the work shall be done in accordance with City standards and specifications. (b) The Director shall require an applicant to file satisfactory evidence of insurance protecting and saving harmless the City, its officers, agents, and employees from all claims for damages or injury to other persons by reason of such alteration work prior to acceptance and for a period of one year thereafter. Such insurance shall be in not less than the amounts specified in ORS 30.272, and the evidence thereof shall be in a form approved by the City Attorney. (c) Prior to final acceptance and start of one-year warranty period, the private engineer for the project must submit the following: (1) As-built drawings, consistent with Public Works Design Standards, prepared and certified by a registered professional engineer licensed by the State; (2) All additional easements required due to construction changes, accompanied by a drawing showing area covered by said legal description; (3) A maintenance bond or other written evidence in a form approved by the City Attorney guaranteeing the work performed for a period of one year after completion of the project and written acceptance by the Director. The maintenance bond may be incorporated in and made a part of the construction bond; (4) Such other information as the Director shall deem necessary for final acceptance. (d) Prior to final acceptance and start of the one-year warranty period for a sanitary sewer project, the project engineer shall notify the Director that the system is complete and ready for final inspection. The Director shall cause inspection of the system by means of a closed circuit TV camera to ensure that there are no cracks in the pipe, that all joints are tight, that deflection is within acceptable tolerances, and that there are no conditions apparent which would permit the infiltration of groundwater into the system. (e) Prior to final acceptance and start of the one-year warranty period for a project other than a sanitary sewer project, the Director shall cause such inspection of the project as the Director may consider necessary.

(Prior Code, § 77.120; Ord. No. 103-76; Ord. No. 132-79; Ord. No. 74-81; Ord. No. 93-84; Ord. No. 79-85; Ord. No. 31-13)