Houston Code of Ordinances § 19-32 General standards.
Sec. 19-32. - General standards.
(a) All new construction in the Houston special flood hazard areas, or substantial improvement of any existing structure in special flood hazard areas, shall be performed to keep the structure reasonably safe from flooding and in accordance with the following standards:
(1) Improvements shall be designed or modified to adequately anchor them to prevent flotation, collapse, or lateral movement of the structure in the presence of floodwaters;
(2) Improvements shall be constructed by methods and practices to minimize flood damage;
(3) Improvements shall be constructed with materials and equipment resistant to flood damage;
(4) Electrical, heating, ventilation, plumbing, and air conditioning equipment and other service facilities shall be designed and located above minimum flood protection elevation to prevent water from entering or accumulating within the components during conditions of flooding;
(5) Water supply systems shall be designed to prevent or eliminate infiltration of floodwaters into the system;
(6) Sanitary sewer systems shall be designed to prevent or eliminate infiltration of floodwaters into the structure's systems and discharge of sewage into floodwaters;
(7) On-site disposal systems, including but not limited to sewage treatment plants and septic tank systems located on the site of the structure, shall be located to prevent impairment of the function of those systems in the presence of floodwaters and to prevent contamination of floodwaters from those systems during flooding; and
(8) Fully enclosed areas below the lowest floor that are used solely for parking, building access or storage in an area other than a basement and that are subject to flooding shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters. Designs for meeting this requirement must either be certified by a registered architect or professional engineer licensed in the State of Texas or meet or exceed the following minimum criterion: have a minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding, with the top of all such openings no higher than one foot above grade or BFE, whichever is lower. Openings may be equipped with screens, louvers, valves, or other coverings or devices, provided they permit the automatic entry and exit of floodwaters.
(b) For a development site partially located in the Houston special flood hazard area, the applicant shall submit a site topographic map to establish the site boundary for the determination of the flood area.
(Ord. No. 2018-258, § 2(Exh. A), 4-4-2018)
