Sec. 146-314. - Permit for occupation of public right-of-way where vehicular or pedestrian traffic may be affected due to construction, demolition, etc.
(a) Where the construction, repair or demolition of any complex, structure, building or stand (Mardi Gras/parade) is authorized by a valid permit from the department of safety and permits, and if the construction, repair or demolition may obstruct or otherwise alter the pattern or flow of vehicular or pedestrian traffic a special permit from the department of public works shall also be required. The contractor for such work shall be required to obtain a special permit to be issued by the director of the department of public works, who is authorized to impose conditions upon the issuance thereof.
(b) The applicant shall file a written application with the director of public works on a form provided by the department of public works. A nonrefundable $40.00 permit application fee will be assessed. In addition to the application fee, a $90.00 inspection fee shall accompany the submission of the application to defray the cost of inspecting the work as well as costs for processing, reviewing each application, plot plan, construction plan and traffic plan.
(c) The director of the department of public works shall cause such application to be reviewed by the city's traffic engineer, who shall recommend approval or denial of the application. Such conditions for approval may include, but not be limited to, the requirement of a maintenance and/or repair bond, in accordance with schedule A as set forth in this section. Such bond shall be provided by the applicant upon demand by the director of the department of public works, and prior to the issuance of a permit. Upon approval of such permit, and prior to the issuance of a permit, the applicant shall submit to the director of the department of public works the appropriate roadway fee as set forth in schedule B of this section. Such fees shall be made payable to the city.
SCHEDULE A—MAINTENANCE
AND/OR REPAIR BOND
Sidewalk Bond | Per Square Yard
Brick or stone | $ 310.00
Concrete | 125.00
Roadway Bond | 310.00
SCHEDULE B—ROADWAY FEE
Completion Time (Days) | 8' × 22' to 8' × 100' | 8' × 101' to 8' × 200' | 8' × 201' and more
1—7 | $ 60.00 | $ 125.00 | $ 245.00
8—30 | 125.00 | 185.00 | 370.00
31—90 | 185.00 | 245.00 | 495.00
91—180 | 370.00 | 495.00 | 740.00
181—270 | 615.00 | 740.00 | 985.00
270 or more | 740.00 | 985.00 | 1,235.00
(Code 1956, § 61-50.19; Ord. No. 20,003, § 1, 1-18-01; M.C.S., Ord. No. 23818, § 6, 12-1-09)