For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 37-21 — Installation and inspection charges and fees for potable water and reclaimed water distribution systems and sewer system

Sarasota Code of Ordinances (Supplement33; through Ordinance26-5592, adopted April20,2026); partial · Sarasota Code § 37-21

Corpus is an independent public-information project, not the official City of Sarasota website. Stable reference: corpuslaw.us/code/63c8a342-2dbd-47b6-a1b4-10aa139eedf8

Sec. 37-21. - Installation and inspection charges and fees for potable water and reclaimed water distribution systems and sewer system.

(a)

Charges for the installation of service (connection) to the city's water distribution system (metered service for potable water and unmetered service to fire protection lines and hydrants), reclaimed water distribution system and charges for installing service to the city's sewer system shall be collected in the amount set forth hereafter. In the case of the city's potable water and reclaimed water distribution systems, installation charges represent the cost of providing a metered connection. In the case of the city's sewer system, the installation charge represents the cost incurred by the city to provide service to the point of the connection. These charges shall be in addition to the established monthly charges for service. All installation charges shall be paid in advance. The payment of the installation charge notwithstanding, the meters, pipes and other service connection hardware shall remain, at all times, the property of the city.

Schedule of Charges for Water Distribution System

Installation

| | | | --- | --- | | Meter Size (inches) | Installation Charge | | ⅝ | Actual cost of installation | | 1 | Actual cost of installation | | 1½ | Actual cost of installation | | 2 | Actual cost of installation | | 3 | Actual cost of installation | | 4 | Actual cost of installation | | 6 or more | Actual cost of installation |

Schedule of Charges for Reclaimed Water Distribution System Installation

| | | | --- | --- | | Meter Size (inches) | Installation Charge | | 2 or less | Actual cost of installation | | Greater than 2 | Actual cost of installation |

No installation charge shall be due for connection to the city's reclaimed water distribution system in the event the customer, at the time of connection to the city's reclaimed water distribution system, has an existing irrigation meter.

Schedule of Charges for Sewer System Installation

| | | | --- | --- | | Service Size (inches) | Installation Charge | | Up through 6 | Actual cost of installation | | 6 or more | Actual cost of installation |

(b)

In the case of all installations, whether relating to the potable water or reclaimed water distribution systems or sewer system, the city shall have the right to determine the meter size for the proposed service.

(c)

In addition to the installation charge set forth in this section, the following permit review and inspection fees shall be assessed for connection to the city's water distribution system:

(1)

Plan and Permit Review Fees:

Fee

Review and processing fee for FDEP water and wastewater permits, each .....$50.00

Review and processing fee for utilities construction permit, each .....100.00

(2)

Inspection of main line taps: .....

Tap size: Fee

⅝″—3″ .....$200.00

4″ .....350.00

6″ .....550.00

8″ .....750.00

10″ .....1,050.00

12″ .....1,250.00

(3)

Fire line and water line installation inspection fee:

Size Per Foot

1″—4″ .....$0.50

6″—8″ .....1.00

10″—12″ .....1.50

(4)

Fire hydrant installation inspection fee, each .....300.00

(5)

Sewer line installation inspection fee: .....

Size Per Foot

6″—8 .....$1.00

10″—12″ .....1.50

Add'tl. taps .....100.00

(6)

Sewer manhole installation inspection fee, each .....$200.00

(7)

Sanitary line TV inspection fee: .....

Size Per Foot

6″ .....$1.50

8″—10″ .....1.75

> 12″ .....2.00

(8)

Re-inspection fee, each .....$50.00

(9)

Installation charge to set a water meter into an existing meter box or vault:

Meter Size Fee

⅝ .....$100.00

1″ .....150.00

1.5″ .....425.00

2″ .....500.00

3″ .....2,400.00

4″ .....3,700.00

6″ .....5,200.00

> 6″ .....Cost

(d)

If the connection to the city's water distribution system, reclaimed water distribution system or sewer system requires public facilities to traverse or be placed upon privately owned property, the fee simple owner of said property shall provide the city a utility easement. In additional to the installation charge, permit review and inspection fees set forth in this section, there shall be a utility easement charge. The applicant seeking connection to the city's potable water, reclaimed water or sewer system shall submit to the city an application for utility easement. The applicant shall provide the city the following information:

(1)

The current parcel identification number(s) assigned by the Sarasota County property appraiser's office to the parent tract(s) within which the easement area is to be located.

(2)

A copy of a current title insurance policy which shows the fee simple owner(s) of the parent tract(s) within which the utility easement is to be granted.

(3)

If the title policy shows the fee simple owner of the parent tract(s) to be a corporation, partnership or any non-individual, the applicant shall also provide a current corporate resolution or other documentation which authorizes a named individual to execute the utility easement on behalf of the fee simple owner.

(4)

Signed and sealed legal descriptions and sketches of the easement area(s).

If the parent tract(s) within which the utility easement is to be located is in the condominium form of ownership, the applicant shall, in addition to items (1) through (4) above, provide the city the following information:

(5)

The instrument number at which the declaration of condominium has been recorded in the Official Records of Sarasota County.

(6)

The specific section and subsection within the declaration of condominium that grants authority to the condominium association (or other entity) to grant utility easements in, on, over and across common areas within the condominium project.

(7)

A current association resolution naming the current president of the association or other specifically identified individual authorized to execute the utility easement.

(8)

A notarized statement executed by the association president or other authorized individual described above establishing that the easement area is within common areas of the condominium project.

Upon submittal of the application for utility easement, the applicant shall pay the utility easement charge set forth herein. The utility easement charge shall be in the amount of five hundred dollars ($500.00) unless the easement area is located within a parent tract(s) held in the condominium form of ownership. In such event, the utility easement charge shall be in the amount of one thousand two hundred dollars ($1,200.00). No certificate of occupancy shall be issued for the project constructed upon the parent tract(s) unless and until the utility easement charge has been paid and the utility easement has been fully executed by the fee simple owner and the original thereof has been recorded in the Official Records of Sarasota County.

(e)

Permits allowing connection to the city's potable water or reclaimed water distribution systems and sewer system shall be valid for a period of twelve (12) months from the date of the permit. At the expiration of twelve (12) months, if the connection has not been made, the permit shall expire unless the applicant requests an extension, prior to expiration. If the potable water or reclaimed water system or sewer system, as applicable, have the capacity available to allow for the previously permitted connection, as determined at the time of the application for a permit extension, the permit holder may request a twelve-month extension. If the permit extension is granted, the installation charges applicable to the extension shall be computed on the basis of the charge schedule which is in effect as of the date the permit extension is applied for. When a permit expires, the applicant shall receive a refund of the installation charge paid.

(f)

Revenues received by the city for potable water, reclaimed water or sewer installations, pursuant to this section, shall be separately accounted for so there is no commingling of such revenue with any impact fees collected pursuant to section 37-22.

(Code 1971, § 42-6; Ord. No. 83-2691, § 2, 7-6-83; Ord. No. 87-3126, § 4, 9-9-87; Ord. No. 88-3251, § 1, 9-23-88; Ord. No. 97-4012, § 2, 9-15-97; Ord. No. 08-4831, § 3, 9-15-08; Ord. No. 23-5496, § 1, 9-18-23)

Ask a question about Sarasota law

Corpus searches the Sarasota sections it holds and shows the ones that match, with their citations. Free, no sign-in.