§ 18.75.050 — Fills

Long Beach Municipal Code (Supp. No. 53, Update 1: codified through Ordinance No. ORD-26-0027, enacted October 13, 2026) · Long Beach Municipal Code § 18.75.050

Corpus is an independent public-information project, not the official City of Long Beach website. Stable reference: corpuslaw.us/code/648a2209-ae0f-40a1-bf1a-469a56c607e2

18.75.050 - Fills.

A. General. Unless otherwise recommended in the geotechnical report, fills shall comply with the provisions of this section. B. Surface preparation. The ground surface shall be prepared to receive fill by removing vegetation, topsoil and other unsuitable materials, and scarifying the ground to provide a bond with the fill material. C. Benching. Where existing grade is at a slope steeper than five (5) units horizontal to one (1) unit vertical (20-percent slope) and the depth of the fill exceeds five feet (5') benching shall be provided in accordance with Figure 18.75.050. A key shall be provided which is at least ten feet (10') in width and two feet (2') in depth. [image omitted; see the official code] For SI: 1 foot = 304.8 mm. FIGURE 18.75.050 BENCHING DETAILS D. Fill material. Fill material shall not include organic, frozen or other deleterious materials. No rock or similar irreducible material greater than twelve inches (12") in any dimension shall be included in fills. E. Compaction. All fill material shall be compacted to ninety percent (90%) of maximum density as determined by ASTM D 1557, Modified Proctor, in lifts not exceeding twelve inches (12") in depth. Where cohesionless soil having less than fifteen percent (15%) finer than 0.005 millimeter is used for fill, it shall be compacted to a minimum of ninety-five percent (95%) relative compaction based on maximum dry density. Every fill shall be tested for relative compaction by a soil testing agency approved by the Building Official. A compaction report including a Certificate of Compliance setting forth densities so determined shall be submitted to the Building Official before approval of any fill is given. F. Maximum slope. The slope of fill surfaces shall be no steeper than is safe for the intended use. Fill slopes steeper than two (2) units horizontal to one (1) unit vertical (50 percent slope) shall be justified by a geotechnical report or engineering data.

(ORD-25-0019 § 1(Exh. A), 2025; ORD-22-0033 § 1(Exh. A), 2022; ORD-19-0031 § 1(Exh. A), 2019; ORD-16-0026 § 1(Exh. A), 2016)