§ 25-9-394 — INSPECTION OF RECLAIMED WATER CONSTRUCTION
Austin City Code (Supp. No. 174: codified through Ordinance No. 20260521-050, effective June 1, 2026) · Austin City Code § 25-9-394
Corpus is an independent public-information project, not the official City of Austin website. Stable reference: corpuslaw.us/code/64b24dff-bd41-4d39-a87d-b85ef237bf3e
§ 25-9-394 - INSPECTION OF RECLAIMED WATER CONSTRUCTION.
(A) The Utility may inspect, remove, or secure devices installed by the user to control reclaimed water. (B) Utility personnel may inspect during normal business hours without notice to the user. (1) The Utility and regulatory agencies may make periodic unannounced inspections of the onsite reclaimed water system. (2) The user and its operations personnel shall cooperate with inspectors and assist in performing operational tests. (C) An onsite reclaimed water system must pass an operational test before the Utility may approve the system. (D) The director of the Water and Wastewater Utility may grant user final approval for reclaimed water service if: (1) the director of the Water and Wastewater Utility approves the drawings; (2) the system passes an inspection and cross connection control test; and (3) the user makes corrections required by the Utility.
Source: Ord. 001214-70; Ord. 031211-11.
Ask a question about Austin law
Corpus searches the Austin sections it holds and shows the ones that match, with their citations. Free, no sign-in.
