15.12.520 - Required installation of measurement and sampling devices.

A. The director of water pollution control may, by written order, direct the owner of commercial, industrial or miscellaneous premises and each commercial, industrial or miscellaneous condominium premises to install and maintain measurement and sampling facilities as hereinafter specified for the purpose of computing sewer service and use charges for such premises. Such written order shall be mailed to the person or persons listed as the owners on the last equalized assessment roll of the County of Santa Clara at the address shown on such assessment roll, or to the successor in interest of such owner if the name and address of such successor in interest is known to the director of water pollution control. B. Within sixty days from and after the date of the mailing of the written order, the person or persons to whom such notice is mailed shall install or cause to be installed at his expense, and maintain in proper operating condition at all times, and make accessible to the director of water pollution control or his or her authorized representatives, whenever sanitary sewage and/or industrial wastes are being discharged into the sanitary sewer system, flow measurement and sampling facilities as are hereinafter provided. The flow measurement device can be a Parshall flume, weir, venturi nozzle, magnetic flow meter, or any other type of device providing accurate and continuous flow indication. Pump timers or other indirect measurement devices will not be acceptable. C. The flow measuring facilities shall be suitable for indicating and totalizing the flow in millions of gallons per day through the measuring facilities, with an error not exceeding plus or minus five percent. The instrument shall be equipped with a set of electrical contacts arranged to momentarily close a circuit to energize a process timer and sampler device for every fixed quantity of flow. This quantity should be selected so as to ensure a minimum of fifty samples per day. Other control variations will be acceptable if it can be demonstrated to the director of water pollution control that the sampling procedure will result in a sample of sanitary sewage and/or industrial wastes which is proportional to and representative of the sanitary sewage and/or industrial wastes flow. The length of operation of the sampling device shall be dependent on the type of sampling arrangement used, but in no case shall the daily composite sample be less than two quarts in volume. D. The method of sampling used can be by continuous pumping past a solenoid-operated valve, direct pumping into the sample container, continuous pumping past a sampler dipper calibrated to remove a constant sample, by a proportional dipper sampler operating directly in the sanitary sewage and/or waste flow, or by any other approved means. All samples must be continuously refrigerated at a temperature of thirty-nine degrees Fahrenheit, plus or minus five degrees. E. The flow measurement and sampling station shall be located and constructed in a manner acceptable to the director of water pollution control. Complete plans on all phases of the proposed installation, including all equipment proposed for use, shall be submitted to the director of water pollution control for approval prior to construction. F. The owner of the premises shall keep flow records as required by the director of water pollution control and shall make such records available to the director of water pollution control or his or her authorized representatives upon request, and shall provide qualified personnel to properly maintain and operate the facilities. Said records need not be kept for more than one year. G. If any person fails to install the required measuring and sampling facilities within sixty days from and after the date of the mailing of the written order, the director of water pollution control or his or her authorized representatives shall make such tests from time to time of sanitary sewage and/or industrial wastes being discharged from such premises into the sanitary sewer system as he or she deems necessary to make an estimate of the sewer service and use charge due and shall prepare a bill or invoice on the basis of such estimate and shall mail said bill or invoice in the same manner and within the time provided for in Section 15.12.540. Failure to install the required measuring and sampling facilities within sixty days from and after the date of the mailing of the written order shall be considered to be a violation of this section.

(Prior code § 5403.18; Ords. 20098, 21657, 22812.)