§ 33.662.310 — Review Procedures
Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.662.310
Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/65dc6032-7ff6-42d0-b95c-21f9c3356f5b
33.662.310 Review Procedures
Procedures for review of changes to an approved Preliminary Plan vary with the type of change proposed. A. Type Ix. Changes not listed in Subsections B or C, below, are processed through a Type Ix procedure. B. Same procedure as was used for Preliminary Plan. The following proposals are processed through the same procedure type as was used for the Preliminary Plan approval: 1. An increase in the site area of more than 5 percent; 2. A decrease in the area of any lot by more than 10 percent; 3. Changing a through street to a dead-end street; 4. Changing a dead-end street to a through street; 5. Deleting a street or pedestrian connection; 6. Deleting or changing a condition of the Preliminary Plan approval; 7. Deleting any of the following: a. Shared parking tracts; b. Environmental resource tracts; c. Stormwater tracts; d. Combined flood hazard area easements or tracts; e. Tree preservation tracts; or f. Landslide hazard easements or tracts; 8. Reducing the area or changing the location of any of the following: a. Environmental resource tract; b. Combined flood hazard area tract; or c. Landslide hazard area tract. 9. Any change that the Director of PP&D determines: a. Is a significant change from the Preliminary Plan; or b. Will have a significant impact on the surrounding area. C. Changes to tree preservation requirements. Changes to tree preservation requirements are processed as described in Chapter 33.853, Tree Review.
Ask a question about Portland law
Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.