§ 22.805.080 — Minimum requirements for flow control
Seattle Municipal Code (Supp. No. 44: codified through Ordinance No. 127459, passed June 30, 2026) · Seattle Mun. Code § 22.805.080
Corpus is an independent public-information project, not the official City of Seattle website. Stable reference: corpuslaw.us/code/661e45c6-f88d-48e6-85d1-3b487fb89adc
22.805.080 - Minimum requirements for flow control
A. Applicability. The requirements of this Section 22.805.080 apply to the extent required in Section 22.805.050 to Section 22.805.060. B. Requirements. Flow control facilities shall be installed to the extent allowed by law and maintained pursuant to rules promulgated by the Director to receive flows from that portion of the site being developed. Post-development discharge determination must include flows from dewatering activities. All projects shall use on-site BMPs identified in subsection 22.805.070.D or other infiltration BMPs authorized by rule to the maximum extent feasible to meet the minimum requirements. Flow control facilities that receive flows from less than that portion of the site being developed may be installed if the total new plus replaced impervious surface is less than 10,000 square feet, the project site uses only on-site BMPs to meet the requirement, and the on-site BMPs provide substantially equivalent environmental protection as facilities not using on-site BMPs that receive flows from all of the portion of the site being developed. C. Wetland protection standards 1. Protect the functions and values of wetlands and their buffers from all projects discharging stormwater directly or indirectly to them. The hydrologic conditions, vegetative community, and substrate characteristics of the wetlands shall be protected, and impacts caused by changes in water flows and pollutants shall be prevented. The introduction of sediment, heat, and other pollutants and contaminants into wetlands shall be minimized through the selection, design, installation, and maintenance of temporary and permanent controls. 2. Before authorizing new discharges to a wetland, alternative discharge locations shall be evaluated and infiltration options outside the wetland shall be maximized unless doing so will adversely impact the functions and values of the affected wetlands. 3. If the wetland protection standard cannot be met due to Sections 22.805.070 or 22.805.090, the wetland protection standard shall be met to the maximum extent feasible while fully meeting the on-site stormwater management and water quality treatment requirements, unless an analysis by a wetland professional per rules promulgated under subsection 25.09.330.C (Technical Reports) is conducted that demonstrates that the functions and values of the affected wetland are not protected. 4. If one or more of the flow control requirements contained in subsections 22.805.080.D through 22.805.080.F also applies to the project, the wetland standard must be met to ensure that the functions and values of the affected wetland are protected before implementing these flow control requirements to the full extent. 5. Notwithstanding any provision in this subtitle, no net loss of wetland functions or values shall result from actions regulated by this subtitle. 6. Refer to the Washington State Wetland Rating System for Western Washington: 2014 Update, Version 2.0 (Hruby, 2023) to determine the category, characteristics, and habitat score of the wetland. Wetland classification shall be determined by a wetland professional per rules promulgated under subsection 25.09.330.C (Technical reports). 7. Projects triggering Method 1 or Method 2 in this subsection 22.805.080.C shall refer to I-C.4, Wetland Hydroperiod Protection and I-C-5, Wetland Hydroperiod Data Collection, Evaluation Procedures, and Strategies presented in Appendix I-C of Ecology's Stormwater Management Manual for Western Washington (Ecology 2024) for additional guidance. 8. Comply with subsection 22.805.080.C.10 (Wetland Protection Standard—Method 1: Monitoring and Wetland Stage Modeling) if the following applies: a. The project discharges to a Category I or II depressional or riverine impounding wetland; and b. The project owner has legal access to the entire wetland for purposes of conducting monitoring in the wetland. 9. Comply with subsection 22.805.080.C.11 (Wetland Protection Standard—Method 2: Site Discharge Modeling) if the criteria in subsection 22.805.080.C.8 do not apply and one or more of the following applies (or applicability is unknown): a. The wetland is Class I or II and does not meet the requirements of subsection 22.805.080.C.8. b. The wetland is Class III or IV and: 1) Has a habitat score greater than 5; 2) Is interdunal and has special characteristics; 3) Provides habitat for rare, threatened, endangered, or sensitive species; or 4) Contains breeding population of any native amphibian. Per Ecology's guidance, wetlands with permanent or seasonal ponding or inundation are assumed to have breeding population of native amphibian. 10. Wetland Protection Standard—Method 1: Monitoring and Wetland Stage Modeling. Comply with I-C.4, Wetland Hydroperiod Protection, presented in Appendix I-C of Ecology's Stormwater Management Manual for Western Washington (Ecology 2024). 11. Wetland Protection Standard—Method 2: Site Discharge Modeling. The total volume of stormwater discharging from the project site into a wetland shall not be more than: a. On a daily basis, 20 percent higher or lower than the pre-project volume, and b. On a monthly basis, 1) 20 percent higher or lower than the pre-project volumes for the months of October, November, and December, and 2) 15 percent higher or lower than the pre-project volumes for all other months (January through September). D. Pre-developed forested standard. The post-development discharge durations from the project site shall match the discharge durations of a pre-developed forested condition for the range of pre-developed discharge rates from 50 percent of the 2-year peak flow to the 50-year peak flow. E. Pre-developed pasture standard. The post-development discharge durations from the project site shall match the discharge durations of a pre-developed pasture condition for the range of pre-developed discharge rates from 50 percent of the 2-year peak flow to the 2-year peak flow. F. Existing condition standard. The post-development discharge durations from the project site shall be limited as follows: 1. Match the discharge durations of the existing land cover condition for the range of discharge rates from 50 percent of the 2-year peak flow to the 25-year peak flow; and 2. For discharges to a creek or a creek drainage basin or to a small lake or a small lake basin, also match the discharge durations of the existing land cover condition for the range of discharge rates from 50 percent of the 2-year peak flow to the 50-year peak flow. G. Peak control standard. The post-development release rates from the project site shall be limited as follows: 1. The peak flow with a 50 percent annual probability (2-year recurrence flow) shall not exceed 0.07 cubic feet per second per acre; 2. The peak flow with a 20 percent annual probability (5-year recurrence flow) shall not exceed 0.10 cubic feet per second per acre; and 3. The peak flow with a 4 percent annual probability (25-year recurrence flow) shall not exceed 0.40 cubic feet per second per acre. H. Inspection and maintenance schedule. Temporary and permanent flow control facilities shall be inspected and maintained according to rules promulgated by the Director to keep these facilities in continuous working order.
(Ord. 127444, § 5, 2026; Ord. 126336, § 4, 2021; Ord. 124872, § 41, 2015; Ord. 123105, § 3, 2009.)
Ask a question about Seattle law
Corpus searches the Seattle sections it holds and shows the ones that match, with their citations. Free, no sign-in.