21.24.040 - Special connection charge—Computation.
A. The special connection charge imposed by Section 21.24.030 shall be paid into the Drainage and Wastewater Fund and, in order that property owners bear their equitable share of the cost of the sewer system, shall be computed as follows:
1. For Lateral Sewers. The number of units of property frontage to be served by the sewer, determined in the manner prescribed in RCW 35.44.030 and 35.44.040 for determining "assessable units of frontage" or by such other method or combination of methods of computing assessments which may be deemed to more fairly reflect the special benefits to the property being assessed as authorized by RCW 35.44.047, shall be multiplied by the average local improvement assessment per unit of frontage for lateral sewers in Seattle for the year in which the sewer to which the property is to be connected was constructed and accepted as completed, provided that, for all sewers that are connected more than one year after the City sewer was constructed, interest shall be added thereto at a rate commensurate with the annual one year rate for U.S. Treasury notes and bonds, adjusted for constant maturities, as published in the Federal Reserve Bulletin or otherwise available from the Federal Reserve Bank, for the year the City sewer was or is completed and available for connection until the connection is made, but excluding both the year of completion of construction and the year connection is made; except that for connection to sewers constructed prior to 1953, interest shall be added thereto at the one year rate for U.S. Treasury notes and bonds, adjusted for constant maturities, for the year 1953. Interest charged pursuant to this paragraph shall not exceed 10 percent per year and shall not exceed ten years.
2. For Trunk Sewers. The number of square feet of property area to be served by the sewer shall be multiplied by the average local improvement assessment per square foot for trunk sewers in Seattle for the year in which the trunk sewer to which the lateral sewers serving the property are connected was constructed and accepted, provided that, for all sewers that are connected more than one year after the City sewer was constructed, interest shall be added thereto at a rate commensurate with the annual one year rate for U.S. Treasury notes and bonds, adjusted for constant maturities, as published in the Federal Reserve Bulletin or otherwise available from the Federal Reserve Bank, for the year the City sewer was or is completed and available for connection until the connection is made, but excluding both the year of completion of construction and the year connection is made, except that, for connection to sewers constructed prior to 1953, interest shall be added thereto at the one year rate for U.S. Treasury notes and bonds, adjusted for constant maturities, for the year 1953. Interest charged pursuant to this paragraph shall not exceed 10 percent per year and shall not exceed ten years.
B. The Director of Seattle Public Utilities is authorized to annually compute and establish the average local improvement assessment paid by property owners for lateral and trunk sewers completed and accepted by the City during the previous calendar year which average assessment shall be used by him or her in computing the special connection charge imposed in Section 21.24.030 as to sewer improvements completed in 1965 and thereafter. A copy of such computation shall be delivered to the City Clerk not later than February 1st of each such year to be filed by him in C.F. 253991.
C. The Director shall file with the City Clerk in C.F. 253991 the annual one year rate for U.S. Treasury notes and bonds, adjusted for constant maturities, as published in the Federal Reserve Bulletin, or otherwise available from the Federal Reserve Bank for each calendar year commencing with 1953. Such information shall be delivered to the City Clerk not later than April 1st for each preceding year.
D. The collection of the special connection charge to serve a residence may be deferred at the request of a person responsible for its payment who is economically disadvantaged, as defined in Section 20.12.020.B of the Seattle Municipal Code and both owns and occupies the residence which will be connected to the City system. Interest on deferred charges shall be computed at the same rate as provided in subsection A of Section 21.24.030 as if payment were being made in a timely manner under an installment contract. A request for deferral must be made 30 days prior to levy of the special connection charge. All charges, including interest, so deferred, shall become due and payable in full at the time of sale or transfer of the property.
E. Such special connection charge for property abutting on a street in which a sewer can be constructed or extended to serve such property, shall be computed as if the sewer were so constructed or extended; and the special connection charge for property located back from the margin of the street in which the sewer exists and outside of the assessment district created therefor shall be made giving consideration to the distance of the property from the street margin. In no case shall credit be allowed for the cost of extra length of side sewer required for connection to the City's sewerage system; provided, that in cases where application of the foregoing formula to a particular property results in a charge which because of unusual conditions is in excess of charges to similar properties, the Director of Seattle Public Utilities is authorized to reduce the special connection charge to the amount charged to properties similarly situated.
F. For connection to side sewers constructed by the City, the property owner for whose benefit connection is made shall pay the cost of the side sewer. The cost shall be computed as follows: The actual cost to the City of the side sewer, plus 15 percent for City design and administrative costs, plus interest at a rate commensurate with the annual one year rate for U.S. Treasury notes and bonds, adjusted for constant maturities, as published in the Federal Reserve Bulletin or otherwise available from the Federal Reserve Bank, for the year the City sewer was or is completed and available for connection and applied until the connection is made, but excluding both the year of completion of construction and the year connection is made.
(Ord. 123494, § 52, 2010; Ord. 118396 § 120, 1996; Ord. 114158 § 2, 1988: Ord. 111793 § 1, 1984: Ord. 111443 § 1, 1983; Ord. 110212, § 1, 1981; Ord. 106546, § 1, 1977; Ord. 99444 § 2, 1970; Ord. 94880, § 1, 1966; Ord. 94213, § 2, 1965; Ord. 93836, § 1, 1965; Ord. 90233, § 2, 1961; Ord. 89902 § 1, 1960; Ord. 82583, § 2-B, 1953.)