Sec. 26-90. - Distribution mains.

(a) Before any distribution mains will be laid by the department for the purpose of supplying water to a tract or parcel of land which either is platted of record or which is proposed to be platted of record and to be developed or redeveloped for any purposes, the owner of the tract or parcel of land to be served shall make application for the installation of the necessary distribution mains to be laid to and inside the tract or parcel of land to be served, setting forth the information as required in this chapter. (b) Such application will be checked by the department which will make or require the customer to provide a layout of the project showing the exact location and size of mains. The department will make an estimate of the cost of materials and labor, including overhead for installing such main, and will make a determination of the physical and financial feasibility of the project. If found physically and financially feasible, the department will issue a commitment for water service, and the applicant shall pay to the department the appropriate fees based on the peak flow rates required for standard service and fire flow rate requirements for fire protection service to be connected to the system. (c) If, in its determination of the physical and financial feasibility of the city to serve a tract or parcel of land, the department determines the water distribution main improvements required to serve the project that is the subject of an application will have excess capacity available to serve the water distribution main requirements of other undeveloped or redeveloped property beyond the boundaries of the project that is the subject of the application, the department shall prepare and provide a written aid-in-construction contribution policy governing the physical and financial feasibility of financing the required water distribution mains and the prorata contribution requirement of present and future applications requesting water commitments or service to be served by the required water distribution mains. Such aid-in-construction contribution policy shall describe the water distribution mains required to be constructed and identify the geographic service area to be served by such mains; provide an estimate of the cost of materials and labor, including overhead, for installing such mains; may incorporate an annual cost escalator to be annually applied in the adjustment of the initial cost estimate; determine the physical and financial feasibility of the construction of the mains; and calculate an equivalent residential unit cost for the mains to be constructed based upon the number of equivalent residential units ("ERUs") contained in the application and the projected number of ERUs to be created by the development of the remaining unconnected parcels of property within the service area. Based upon the determinations, descriptions and calculations and the physical and financial feasibility determination of the required water mains contained in the aid-in-construction contribution policy, an applicant requesting water commitment, connection or service within the defined service area, shall pay to the department a water main contribution fee based upon the number of ERUs contained in the project and the ERU contribution rate calculated in the aid-in-construction contribution policy in addition to the appropriate fees described in subsection (b) of this section. The provisions of subsection (d) of this section shall be fully applicable to an applicant whose main distribution requirement is governed by the aid-in-construction contribution policy established in this subsection and the application shall be submitted under and pursuant to the conditions established and procedure provided for the receipt and approval of an application requesting a water commitment, connection or service provided in section 26-74. (d) If the department approves the application, issues the commitment and collects the fees, it will, within a reasonable time thereafter, commence work on the project, either with city forces or by contract. Such mains and appurtenance thereto shall be the sole property of the city and shall constitute a part of the water distribution system of the city. Under certain circumstances the department may determine that the water main contribution fee or connection fees are not adequate to justify the construction needed to provide service. In these cases, the applicant will be advised of the additional contribution in aid of construction that will be necessary to be paid before construction can begin. The applicant shall then advise the department whether or not he proposes to proceed with the connection. (e) The water main contribution fee calculated pursuant to subsection (c) of this section and all other appropriate fees described in subsection (b) of this section shall be paid as follows: fifty (50) percent shall be paid within thirty (30) days from the date of conditional letter of commitment for service; and the remainder at the time of the water connection to the city water system.

(Ord. No. 89-253, § 2(58-85), 9-28-89; Ord. No. 90-148, § 14, 5-24-90; Ord. No. 2007-106, § 1, 5-4-06; Ord. No. 2013-39, § 2, 4-4-2013)

Ask a question about Tampa law

Corpus searches the Tampa sections it holds and shows the ones that match, with their citations. Free, no sign-in.