Completion of work.
Salem Revised Code § 82.045
in effectSec. 82.045. - Completion of work.
(a) Upon completion of work, the owner shall notify the Director that the site is ready for final inspection. The Director shall not give final approval until all work has been completed in accordance with the final approved grading plan and all required reports have been submitted.
(b) For projects identified as requiring a certified professional per SRC 82.030(c)(7):
(1) Upon completion of the work, a final site plan shall be prepared by the certified professional and submitted to the Director that includes original ground surface elevations, finished graded ground surface elevations, lot drainage patterns, and locations and elevations of all surface and subsurface drainage facilities.
(2) Prior to final approval by the Director, the certified professional shall provide documentation that the work has been done in accordance with the final approved grading plan.
(Ord. No. 6-16, § 1(82.045), 5-23-2016)
Source: City of Salem, Oregon, Salem Revised Code and City Charter (Municode Library, library.municode.com)URL: https://library.municode.com/or/salem/codes/code_of_ordinances?nodeId=PTIICOOR_TITVIIPESTPUWA_CH82CLGRLA_S82.045COWOFetched: 11/7/2026
