For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 37-167 — Publication of industrial users

Code of Ordinances of the City of Pasadena, Texas (Supp. No. 33, Update 2: codified through Ordinance No. 2026-143, enacted September 1, 2026) · Pasadena City Code § 37-167

Corpus is an independent public-information project, not the official City of Pasadena website. Stable reference: corpuslaw.us/code/67f4de01-8377-4159-89fc-4c0b417ee57d

Sec. 37-167. - Publication of industrial users.

The city shall publish annually, in the largest daily newspaper published in the municipality where the POTW is located, a list of industrial users which, during the previous twelve (12) months, were in significant noncompliance with applicable pretreatment standards and requirements. The term significant noncompliance shall mean: (1) Chronic violations of wastewater discharge limits, defined here as those in which sixty-six (66) per cent or more of all of the measurements taken during a six-month period exceed (by any magnitude) the daily maximum limit or the average limit for the same pollutant parameter, including instantaneous limits; (2) Technical review criteria (TRC) violation, defined here as those in which thirty-three (33) per cent or more of the measurements for each pollutant parameter taken during a six month period equal or exceed the product of the daily maximum limit or the average limit multiplied by the applicable TRC (TRC = 1.4 for BOD, TSS, fats, oil and grease, and 1.2 for all other pollutants except pH), including instantaneous limits; (3) Any other violation of a pretreatment effluent limit (daily maximum or long term average) that the director determines has caused, alone or in combination with other discharges, interference or pass through (including endangering the health of POTW personnel or the general public); (4) Any discharge of a pollutant that has caused imminent endangerment to human health, welfare or to the environment or has resulted in the POTWs exercise of its emergency authority under 40 CFR 403.8(f)(1)(vi)(B) to halt or prevent such a discharge; (5) Failure to meet within ninety (90) days after the schedule date, a compliance schedule milestone contained in a local control mechanism or enforcement order for starting construction, completing construction, or attaining final compliance; (6) Failure to provide, within forty-five (45) days after the due date, required reports such as baseline monitoring reports, ninety-day compliance reports, periodic self- monitoring reports and reports on compliance with compliance schedules; (7) Failure to accurately report noncompliance; (8) Any other violation or group of violations which the director determines will adversely affect the operation or implementation of the local pretreatment program. The control authority will evaluate whether each significant industrial user needs a plan or other action to control slug discharges. In accordance with 40 CFR.8(f)(2)(vi) the control authority is required to also keep records of the activities associated with slug control evaluation and results of such activities are required to be available to the approval authority upon request.

(Ord. No. 09-277, § 2, 12-29-09; Ord. No. 11-129, § 2, 8-9-11; Ord. No. 20-044, § 2, 4-21-20)

Ask a question about Pasadena law

Corpus searches the Pasadena sections it holds and shows the ones that match, with their citations. Free, no sign-in.