For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 33.430.250 — Approval Criteria

Portland City Code (non-zoning titles; Title 33 separately); partial · Portland Zoning Code § 33.430.250

Corpus is an independent public-information project, not the official City of Portland website. Stable reference: corpuslaw.us/code/68127c85-4c6b-416a-ad03-bc0ee859f02e

33.430.250 Approval Criteria

An environmental review application will be approved if the review body finds that the applicant has shown that all of the applicable approval criteria are met. When environmental review is required because a proposal does not meet one or more of the development standards of Section 33.430.140 through .190, then the approval criteria will only be applied to the aspect of the proposal that does not meet the development standard or standards. A. Public safety facilities, rights-of-way, driveways, walkways, outfalls, utilities, pump stations, flood control structures, septic systems, land divisions, Property Line Adjustments, Replats, Planned Developments, and Planned Unit Developments. Within the resource areas of environmental zones, the applicant's impact evaluation must demonstrate that all of the general criteria in Paragraph A.1 and the applicable specific criteria of Paragraphs A.2, 3, or 4, below, have been met: 1. General criteria for public safety facilities, rights-of-way, driveways, walkways, outfalls, utilities, pump stations, flood control structures, septic systems, land divisions, Property Line Adjustments, replats, Planned Developments, and Planned Unit Developments: a. Proposed development locations, designs, and construction methods have the least significant detrimental impact to identified resources and functional values of other practicable and significantly different alternatives including alternatives outside the resource area of the environmental zone; b. There will be no significant detrimental impact on resources and functional values in areas designated to be left undisturbed; c. The mitigation plan demonstrates that all significant detrimental impacts on resources and functional values will be compensated for; d. Mitigation will occur within the same watershed as the proposed use or development and within the Portland city limits except when the purpose of the mitigation could be better provided elsewhere; and e. The applicant owns the mitigation site; possesses a legal instrument that is approved by the City (such as an easement or deed restriction) sufficient to carry out and ensure the success of the mitigation program; or can demonstrate legal authority to acquire property through eminent domain. 2. Public safety facilities. The public benefits of the proposal outweigh all significant detrimental impacts; 3. Rights-of-way, driveways, walkways, outfalls, utilities, and septic systems; a. The location, design, and construction method of any outfall or utility proposed within the resource area of an environmental protection zone has the least significant detrimental impact to the identified resources and functional values of other practicable alternatives including alternatives outside the resource area of the environmental protection zone; b. There will be no significant detrimental impact on water bodies for the migration, rearing, feeding, or spawning of fish; and c. Water bodies are crossed only when there are no practicable alternatives with fewer significant detrimental impacts. 4. Land divisions, Property Line Adjustments, replats, Planned Developments, and Planned Unit Developments: a. Proposed uses and development must be outside the resource area of the Environmental Protection zone except as provided under Paragraph A.3 above. Other resource areas of Environmental Protection zones must be in environmental resource tracts; b. There are no practicable arrangements for the proposed lots, tracts, roads, or parcels within the same site, that would allow for the provision of significantly more of the building sites, vehicular access, utility service areas, and other development on lands outside resource areas of a conservation zone; and c. Development, including building sites, vehicular access and utilities, within the resource area of a conservation zone must have the least amount of detrimental impact on identified resources and functional values as is practicable. Significantly different but practicable development alternatives, including alternative housing types or a reduction in the number of proposed or required units or lots, may be required if the alternative will have less impact on the identified resources and functional values than the proposed development. B. Resource enhancement projects. In resource areas of environmental zones, resource enhancement projects will be approved if the applicant's impact evaluation demonstrates that all of the following are met: 1. There will be no loss of total resource area; 2. There will be no significant detrimental impact on any resources and functional values; and 3. There will be a significant improvement of at least one functional value. C. Public recreational facilities. In resource areas of environmental zones, public trails, rest points, public viewing areas, and interpretative facilities will be approved if the applicant's impact evaluation demonstrates that all of the following are met: 1. Proposed development locations, designs, and construction methods are less detrimental to identified resources and functional values than other practicable and significantly different alternatives; 2. The public benefits of the proposal outweigh all significant detrimental impacts; 3. Areas disturbed during construction, that do not contain permanent development, will be restored with native vegetation that is similar to the vegetation existing on the site and found on the Portland Plant List; and 4. There will be no significant detrimental impact on resources and functional values in areas designated to be left undisturbed. D. Modification of zone boundaries. Modifications of environmental zone boundaries that reflect permitted changes in the location or quality of resource areas will be approved upon finding that the applicant's statement demonstrates that either Paragraph D.1 or D.2 below are met. For the minor modification of environmental zone boundaries based on a more detailed site specific environmental study, the applicant's impact evaluation must demonstrate that Paragraph D.3 below is met: 1. Successful mitigation. An approved mitigation plan has been successful and a new, restored, or enhanced resource exists which, depending on its degree of significance, should be included in either the resource area of an Environmental Conservation zone or the resource area of an Environmental Protection zone; or 2. Approved loss of resource area. All of the following must be met: a. All approved development in a resource area has been completed; b. All mitigation required of this development has been successful; and c. The identified resources and functional values at the developed site no longer exist, or have been subject to a significant detrimental impact. 3. The proposed environmental zone line location accurately reflects the location of the significant or highly significant resources and functional values on the site, plus 25 feet of transition area. The significant or highly significant resources are identified in the Resource Site Inventory of the relevant Environmental Study Report, see 33.430.020. E. Other development in the Environmental Conservation zone or within the Transition Area only. In Environmental Conservation zones or for development within the Transition Area only, the applicant's impact evaluation must demonstrate that all of the following are met: 1. Proposed development minimizes the loss of resources and functional values, consistent with allowing those uses generally permitted or allowed in the base zone without a land use review; 2. Proposed development locations, designs, and construction methods are less detrimental to identified resources and functional values than other practicable and significantly different alternatives; 3. There will be no significant detrimental impact on resources and functional values in areas designated to be left undisturbed; 4. The mitigation plan demonstrates that all significant detrimental impacts on resources and functional values will be compensated for; 5. Mitigation will occur within the same watershed as the proposed use or development and within the Portland city limits except when the purpose of the mitigation could be better provided elsewhere; and 6. The applicant owns the mitigation site; possesses a legal instrument that is approved by the City (such as an easement or deed restriction) sufficient to carry out and ensure the success of the mitigation program; or can demonstrate legal authority to acquire property through eminent domain. F. Other development in the Environmental Protection zone. In Environmental Protection zones the applicant's impact evaluation must demonstrate that all of the following are met: 1. All sites within the Portland city limits, in which the proposed use or development is possible, are also in the resource areas of Environmental Protection zones; 2. Of these sites, development on the proposed site would have the least significant detrimental environmental impact; 3. There is a public need for the proposed use or development; 4. The public benefits of the proposed use or development outweigh all significant detrimental impacts; 5. There will be no significant detrimental impact on resources and functional values in areas designated to be left undisturbed; 6. The mitigation plan demonstrates that all significant detrimental impacts on resources and functional values will be compensated for; 7. Mitigation will occur within the same watershed as the proposed use or development and within the Portland city limits except when the purpose of the mitigation could be better provided elsewhere; and 8. The applicant owns the mitigation site; possesses a legal instrument that is approved by the City (such as an easement or deed restriction) sufficient to carry out and ensure the success of the mitigation program; or can demonstrate legal authority to acquire property through eminent domain. G. Corrections to violations. For corrections to violations of this Chapter the application must meet all applicable approval criteria stated in subsections A through F above, and paragraphs 1, 2.b and 2.c, below. If these criteria cannot be met, then the applicant’s remediation plan must demonstrate that all of the following are met: 1. The remediation is done in the same area as the violation; and 2. The remediation plan demonstrates that after its implementation there will be: a. No permanent loss of any type of resource or functional value; b. A significant improvement of a least one functional value; and c. There will be minimal loss of resources and functional values during remediation until the full remediation program is established.

Ask a question about Portland law

Corpus searches the Portland sections it holds and shows the ones that match, with their citations. Free, no sign-in.