SEC. 31.23. 1. COMMUNITY PLAN FEES.
(a) The Planning Department shall charge Community Plan Fees for environmental
applications filed in adopted Plan Areas effective after July 1, 2005. The fee amounts shall be
as stated in Section 4 of Ordinance No. 149-16, mailable in BoaFdafSupervisoFs File l'lo.
160632, as amended by Ordinance No. 220-25, in Board o(Supervisors File No. 250888, and on the
website oft1w Bocwd ofSupavisors, as stated in Section 31.22(b) of this Code, and adjusted
annually in accordance with the procedure established under Section 31.22(c).
* * * *
Section 5. This section is uncodified. It amends Section 4 of Ordinance No. 149-16, in
Board File No. 160632, which was subsequently amended by Ordinance No. 221-18, in Board
File No. 180584, Ordinance No. 189-23, in Board File No. 230559, and Ordinance
No. 127-24, in Board File 240456, as follows-:'. The same fonts used to signify additions and
deletions as specified in the "Note" that appears under the otficial title ofthis ordinance are used here.
Mayor Lurie; Supervisor Dorsey
BOARD OF SUPERVISORS
Page 8
PERMIT APPLICATIONS.
(a)
BuildingperN1it Fees for Development A_t1-pplications for a change in use or
alteration of an existing building~ or to construct a new building, and that do not require an
entitlement from the Planning Commission or Zoning Administrator, shall t-e be collected l3y at the
time the Development Application is submitted Central Permit Bureau; provided, however, that the
fees charged for Planning Department approval over-the-counter for the replacement of
windows, roofs, siding, and doors shall be reduced to one-half the fee set forth below. The
Planning Department initial fee amount shall not exceed 50% of the construction cost,
notwithstanding the foregoing, and provided further that the fees set forth in the table below
shall apply to construction with an estimated cost of $0 to $9,999, notwithstanding that such
fees may exceed 50% of the construction cost. Applications for permit revisions are excluded
from this limitation. All fee amounts shown in this section are shown in the values originally set forth
in Ordinance No. 149-16. in Board File No. 160632, unless noted otherwise. The Planning
Department maintains the Planning Department Fee Schedule showing the current fee amounts,
inclusive o[any annual adiustments.
Estimated Construction Cost
$0 to $9,999
Mayor Lurie; Supervisor Dorsey
BOARD OF SUPERVISORS
Initial Fee for Development
Application for Changes in Use
or Alteration of An Existing
Building
$359
Initial Fee for
Development Applications
for New Buildings
$2,079, plus $98
Discretionary Review
Surcharge and $321
Categorical Exemption
Stamp Fee
Page 9
$10,000 to $49,999
$50,000 to $99,999
$100,000 to $499,999
$500,000 to $999,999
$1,000,000 to $4,999,999
Mayor Lurie; Supervisor Dorsey
BOARD OF SUPERVISORS
$368 plus 3. 762% of cost over
$10,000
$2,320 plus 2.513% of cost
over $50,000 plus $98
Discretionary Review
Surcharge and $321
Categorical Exemption Stamp
Fee
$3,603 plus 2.752% of cost
over $100,000 plus $98
Discretionary Review
Surcharge and $321
Categorical Exemption Stamp
Fee
$14,819 plus 0.696% of cost
over $500,000 plus $98
Discretionary Review
Surcharge and $321
Categorical Exemption Stamp
Fee
$18,366 plus 0.274% of cost
over $1,000,000 plus $98
$2,079, plus $98
DiscretionarJ!.. Review
Surcharge and $321
Categorical Exemption
Stam{2_ Fee
$2,079, elus $98
DiscretionarJ!.. Review
Surcharge and $321
Categorical Exemption
Stam{2_ Fee
$2,080 plus 2. 752% of cost
over $100,000, plus $98
DiscretionarJ!.. Review
Surcharge and $321
Categorical Exemption
Stamp Fee
$13,298 elus 0.878% of
cost over $500,000, plus
$98 DiscretionarJ!.. Review
Surcharge and $321
Categorical Exemption
Stamt2. Fee
$17,775 plus 0.338%0{
cost over
Page 10
Discretionary Review
$1,000,000, plus $98
Surcharge and $321
Discretionary Review
Categorical Exemption Stamp
Surcharge and $321
Fee
Categorical Exemption
Stamp Fee
$5,000,000 to $99,999,999
$29,502 plus .004% of cost
$31,550 plus 0.005% of
over $5,000,000 plus $98
cost of$5,000,000,
Discretionary Review
plus $98 Discretionary
Surcharge and $321
Review Surcharge
Categorical Exemption Stamp
and $321 Categorical
Fee
Exemption Stamp Fee
$100,000,000 or more
$34,062 plus $98
$37,251, plus $98
Discretionary Review
Discretionary Review
Surcharge and $321
Surcharge and $321
Categorical Exemption Stamp
Categorical Exemption
Fee
Stam12.Fee
(1)
Application with Verified Violations of the Planning Code: The
Planning Department shall charge $1,271 as an inspection fee for monitoring code violation
abatements, plus time and materials as set forth in Planning Code Section 350(e).
(2)
Back-Check Fee for Permit Revisions: $229 for the initial fee, plus time
and materials as set forth in Planning Code Section 350(e), to be collected at time of permit
issuance. A $-JJ surcharge of$44 as ofthe effective date of Ordinance No. 127-24, in Board File No.
240456, and as may be increased over time pursuant to that ordinance, shall be added to the fees to
compensate the City for the costs of appeals to the Board of Appeals.
Mayor Lurie; Supervisor Dorsey
BOARD OF SUPERVISORS
Page 11
(3)
Shadow Impact Fee for New Construction or Alteration Exceeding
40 Feet in Height (Planning Code Section 295): Additional $526 plus time and materials as
set forth in Planning Code Section 350(e). Am surcharge o{$44 as of the e{fective date of
Ordinance No. 127-24, in Board File No. 240456, and as may be increased over time pursuant to that
ordinance, shall be added to the fees to compensate the City for the costs of appeals to the
Board of Appeals.
(4)
Public Notification Fee for Projects Requiring Public Notice
Pursuant to Planning Code Section 311: $54, plus $3.26 per envelope (subject to increase
based on envelope and postage costs). Am surcharge of$44 as of the e{fective date of
Ordinance No. 127-24, in Board File No. 240456, and as may be increased over time pursuant to that
ordinance, shall be added to the fees to compensate the City for the costs of appeals to the
Board of Appeals. The City's reprographics department will print and mail public notices.
(5)
Public ,V-otificflti0n Fee for Projects Requiring Public ,V-otice Pursuflnt to
,Plmming Code Section 312: $54, plus $1.13 per eHvelope (subject to increase based on envelope and
postage costs). A $25 surcharge shall be added to the fees to compeHsate the City.for the costs <>J
appeals to the Board <>}Appeals. The City's reprographics department will print aHd mail public
notices.
(6)
For projects with a construction cost of $100,000, 000 or more, the applicant
shall be charged the per."l'iit fee for a project with a $100, 000, 000 coHstructio,"I cost.
(I+)
Permits for solar panels and over-the-counter permits for solar equipment
installation shall be $154 per permit. Am surcharge 0($44 as ofthe efjective date of Ordinance
No. 127-24, in Board File No. 240456, and as may be increased over time pursuant to that ordinance,
shall be added to the fees to compensate the City for the costs of appeals to the Board of
Appeals.
Mayor Lurie; Supervisor Dorsey
BOARD OF SUPERVISORS
Page 12
(e)
Building Permit Applications for a New Building: The Planning De-partrnent initial fee
amount is not to exceed 50% of the construction cost providedfurther that the fees set forth in the table
below shall apply to constrttction with an esti,"lwted cost of$0 to $9,999, notwithstanding that such fees
mt1y exceed 50% of the construction cost; notwithstanding the .foregoing, applications fi:Jr permit
re,1isions are excludec{from this limitation.
Estimated GJ,'ititFuction Gost
$0 to $99,999
$100, 000 to $ 499, 999
$5 00, 000 to $999,999
$1, 000, 000 to $4,999, 999
$5,000, 000 to $99,999,999
$100,000,000 or more
Mayor Lurie; Supervisor Dorsey
BOARD OF SUPERVISORS
l-nitial ... ~e
$2, 0 79, plus $98 Discretionary Re'.>1iew
Surchat<ge and $321 Categorical Exernption
Stamp 1~e
$2, 080plus 2. 752% of cost mer $100, OOOplus
$98 Discretionary Review Surcharge and $321
Gategorical ExemptioH Stamp i~e
$13,298plus 0.878% ofcost over $500,000phis
$98 Discretionary Review Surcharge ar,d $321
Categorical Exemptio,9 Stamp Fee
$17, 775plus 0.338% ofcost over $1,000,000
plus $98 Discretionery Review Surcharge tmd
$321 Getegorical Exem·ption Sta,wp Fee
$31,550plus 0.005% ofcost of$5,000,000plus
$98 Disaetior,ary Review Surchaf'ge er,d $321
Gategoricel ExernptioH Stmnp Fee
$3 7, 251plus $98 Discretio;wry Re·,.iew
Surcht1rge and $321 Getegorirnl Exemptior,
St-eHtp Fee
Page 13
(I)
Applications with Verified Violatio1'ls &jthe Planning Code: $1,271 as an
inspection fee for Hwnitoring Code .,,,iolation abateHwnts.
(f2..e)
Demolition Applications, t0 he collected by Central Permit Bureau: $1,621. A $-8-
surcharge 0($44 as ofthe effective date of Ordinance No. 127-24, in Board File No. 240456, and as
may be increased over time pursuant to that ordinance, shall be added to the fees to compensate
the City for the costs of appeals to the Board of Appeals.
(fd)
Fire, Police, Entertainment Commission, State Alcohol & Beverages
Control,. and Health Department Permit Applications Referral Review: $137 initial fee
collected by the other departments in conjunction with current fee collections, plus time and
materials as set forth in Planning Code Section 350(e).
(d_e)
Sign Permit Applications, t0 he collected by Central:Per-mit Bureau: $143. A $-8-
surcharge 0($44 as o(the effective date of Ordinance No. 127-24, in Board File No. 240456, and as
may be increased over time pursuant to that ordinance, shall be added to the fees to compensate
the City for the costs of appeals to the Board of Appeals.
Small Bu.'iiness ,~lonth Fee Waiver: l'lo Planning Depart:-nent fees shall apply for
pennits issued to Small Business Enterprises in the month ofAfay for awning replacement and for signs
on awnings. For purposes &/this Subsection(!), tt Small Business Enterprise shall be a business that
has I 00 or fewer employees. The Pla1ming DepartHwnt and the Dept:rhnent of Building !11spection
shall establish ti process by which those two dept1rt:nents 1,vill cert[/ji that en applicant is a SHwll
Business Enterprise for the purpose of this Subsection (f) and Section 1 I OA, Tab!:es 1A A and IA E of
the Building Code.
* * * *
ENVIRONMENTAL REVIEW.
(a)
The Planning Department shall charge the following fees to applicants for
projects located outside of recently adopted Plan Areas (adopted after July 1, 2005) that do
Mayor Lurie; Supervisor Dorsey
BOARD OF SUPERVISORS
Page 14
not require one or more of the following, which will be initiated through the adoption of an Area
Plan: Code amendments for the height or bulk district and General Plan amendments, as
specified in Administrative Code Section 31.21:
( 1)
For an initial study of a project excluding use of special expertise or
technical assistance, as described in Administrative Section 31.23, the initial fee shall be:
Where the total estimated construction cost as defined by the San Francisco
Building Code is between $0 and $9,999: $1,203;
Where said total estimated construction cost is $10,000 or more, but less than
$200,000: $4,682 PLUS 2.276% of the cost over $10,000;
Where said total estimated construction cost is $200,000 or more, but less than
$1,000,000: $9,092 PLUS 1.721 % of the cost over $200,000;
Where said total estimated construction cost is $1,000,000 or more, but less
than $10,000,000: $23,127 PLUS 1.445% of the cost over $1,000,000;
Where said total estimated construction cost is $10,000,000 or more, but less
than $30,000,000: $155,622 PLUS 0.445% of the cost over $10,000,000;
Where said total estimated construction cost is $30,000,000 or more, but less
than $50,000,000: $246,327 PLUS 0.167% of the cost over $30,000,000;
Where said total estimated construction cost is $50,000,000 or more, but less
than $100,000,000: $280,403 PLUS 0.041 % of the cost over $50,000,000;
Where said total estimated construction cost is $100,000,000 or more: $300,903
PLUS 0.016% ofthe cost over $100,000,000.
An applicant proposing major revisions to a project application that has been
inactive for more than six months and is assigned shall submit a new application. An applicant
proposing significant revisions to a project which has not been assigned and for which an
application is on file with the Planning Department shall be charged time and materials to
Mayor Lurie; Supervisor Dorsey
BOARD OF SUPERVISORS
Page 15
cover the full costs in excess of the initial fee paid. A $120 surcharge shall be added to this
fee to compensate the City for the costs of appeals to the Board of Supervisors.
(2)
For preparation of an environmental impact report excluding use of
special expertise or technical assistance, as described in Administrative Code Section 31.23,
the initial fee shall be:
Where the total estimated construction cost as defined in the San Francisco
Building Code is between $0 to $199,999: $26,729;
Where said total estimated construction cost is $200,000 or more, but less than
$1,000,000: $26,729 PLUS 0.657% of the cost over $200,000;
Where said total estimated construction cost is $1,000,000 or more, but less
than $10,000,000: $32,231 PLUS 0.445% of the cost over $1,000,000;
Where said total estimated construction cost is $10,000,000 or more, but less
than $30,000,000: $73,049 PLUS 0.182% of the cost over $10,000,000;
Where said total estimated construction cost is $30,000,000 or more, but less
than $50,000,000: $110,243 PLUS 0.049% of the cost over $30,000,000;
Where said total construction cost is $50,000,000 or more, but less than
$100,000,000: $120,381 PLUS 0.049% of the cost over $50,000,000;
Where said total estimated construction cost is $100,000,000 or more: $145,939
PL[lS 0.016% <>/the cost o;.,1er $100,000,000.
An applicant proposing major revisions to a project application that has been
inactive for more than six months and is assigned shall submit a new application. An applicant
proposing significant revisions to a project which has not been assigned and for which an
application is on file with the Planning Department shall be charged time and materials to
cover the full costs in excess of the initial fee paid.
Mayor Lurie; Supervisor Dorsey
BOARD OF SUPERVISORS
Page 16
(3)
For an appeal to the Planning Commission: The fee shall be $562 to the
appellant; provided, however, that the fee shall be waived if the appeal is filed by a
neighborhood organization that: (A) has been in existence for 24 months prior to the appeal
filing date, (B) is on the Planning Department's neighborhood organization notification list, and
(C) can demonstrate to the Planning Director or the Director's his/her designee that the
organization is affected by the proposed project. An exemption from paying this appeal fee
may be granted when the requestor's income is not enough to pay for the fee without affecting
his or herrequestor 's ability abilities to pay for the necessities of life, provided that the person
seeking the exemption demonstrates to the Planning Director or the Director's his/her designee
that he-e-r-shethe person is substantially affected by the proposed project.
(4)
For an appeal to the Board of Supervisors of environmental
determinations, including the certification of an EIR, a negative declaration, or determination
of a categorical exemption, the fee shall be $562 to the appellant; provided, however, that the
fee shall be waived if the appeal is filed by a neighborhood organization that: (A) has been in
existence for 24 months prior to the appeal filing date, (B) is on the Planning Department's
neighborhood organization notification list, and (C) can demonstrate to the Planning Director
or the Director's his/her designee that the organization is affected by the proposed project.
Fees shall be used to defray the cost of appeal for the Planning Department. Such fee shall
be refunded to the appellant in the event the Planning Department rescinds its determination
or the Board of Supervisors remands or rejects the environmental impact report, negative
declaration, or determination of a categorical exemption to the Planning Commission for
revisions based on issues related to the adequacy and accuracy of the environmental
determination. An exemption from paying this appeal fee may be granted when the
requestor's income is not enough to pay for the fee without affecting his or herthe requestor 's
ability to pay for the necessities of life, provided that the person seeking the exemption
Mayor Lurie; Supervisor Dorsey
BOARD OF SUPERVISORS
Page 17
demonstrates to the Clerk of the Board of Supervisors or the Clerk's his/her designee that he-&
,s-hethe person is substantially affected by the proposed project.
(5)
For preparation of an addendum to an environmental impact report that
has previously been certified, pursuant to Section 15164 of the State CEQA GuidelinesL:=- or
reevaluation of a modified project for which a negative declaration has been prepared:
$25,174 plus time and materials as set forth in Administrative Code Section 31.22(e).
(6)
For preparation of a supplement to a draft or certified final environmental
impact report: One-half of the fee that would be required for a full environmental impact report
on the same project, as set forth in Paragraphsubsection (a)(2) above, plus time and materials
as set forth in S~ubsection (b)(2). A $120 surcharge shall be added to this fee to compensate
the City for the costs of appeals to the Board of Supervisors.
(7)
(A)
For preparation of a Certificate of Exemption from Environmental
Review determining that a project is categorically exempt, statutorily exempt,
ministerial/nonphysical, an emergency, or a planning and feasibility study: $321 for
applications that require only a stamp, $6,278 as an initial fee for applications that require an
Certificate o(Exemption Certificate, plus time and materials as set forth in S~ubsection (b)(2). A
$120 surcharge shall be added to this fee to compensate the City for the costs of appeals to
the Board of Supervisors.
(BJ
For preparation o.f a Ciass 32 Certificate ofExeNiptionfrom
Environmental Rm,1iew determining that a pmject is categorically exonpt, the initial fee shall be:
Where the total estimated construction cost as defined by the San Francisco Building
Code is between $0 and $9,999: $11,544;
Where said total estimated construction cost is $10,000 or n9ore, but less than $200,000:
$11,544 PLUS 0.201% ofthe cost over $10,000;
Mayor Lurie; Supervisor Dorsey
BOARD OF SUPERVISORS
Page 18
Where said total estimated construction cost is $200,000 or more, but less them
$1,000,000: $11,926 PLrJS 0.190% of the cost over $200,000;
Where said total estimated coHstructioN cost is $1,000,000 or more, but less than
$10,000, 000: $13, 116 PL US 0. 05 7% of the cost over $1, 000, 000;
Where said total estimated construction cost is $10,000,000 or more: $18,709 PLUS
0. 426% of the cost o·e1er $10,000,000.
A $120 surcharge shall be added to this fee to cmnpensate the City for the costs of appeals to
the Board of Supervisors.
(8)
For preparation of an exemption that requires review of historical
resource issues only, the following fees apply. For a determination of whether a property is an
historical resource under CEQA, the fee is $2,630. For a determination of whether a project
would result in a substantial adverse change in the significance of an historical resource, the
fee is $3,648. A $120 surcharge shall be added to this fee to compensate the City for the
costs of appeals to the Board of Supervisors.
(9)
For preparation of a letter of exemption from environmental review: $321,
plus time and materials as set forth in Administrative Code Section 31.22(e).
(10)
For review of a categorical or statutory exemption prepared by another
City Agency, such as the Municipal Transportation Agency or the Public Utilities Commission:
$270, plus time and materials as set forth in Administrative Code Section 31.22(e).
(11)
For reactivating an application that the Environmental Review Officer has
deemed withdrawn due to inactivity and the passage of time, subject to the approval of the
Environmental Review Officer and within six months of the date the application was deemed
withdrawn: $237 plus time and materials to cover any additional staff costs.
(12)
Monitoring Conditions of Approval and Mitigation Monitoring: Upon
adoption of conditions of approval and/or mitigation measures which the Environmental
Mayor Lurie; Supervisor Dorsey
BOARD OF SUPERVISORS
Page 19
Review Officer determines require active monitoring, the fee shall be $1,271, as an initial fee,
plus time and materials as set forth in Administrative Code Section 31.22(e).
(b)
The Planning Department shall charge the following Community Plan Fees for
environmental applications filed in adopted Plan Areas effective after July 1, 2005:
( 1)
For Class 1 and 3 Exemptions: same as basic fees outlined in Section
(a)(8) and (10) above.
(2)
For determination of the appropriate environmental document: $14,017
and any fee pursuant to Administrative Code Section 31.23.1 (a)-(c). In addition, the applicant
shall pay the following fees as applicable €lppropriate:
(A)
If the determination is that the project qualifies for a Community
exemption or exclusion or General Plan exemption, the applicant shall pay a fee of $7,659. A
$120 surcharge shall be added to this fee to compensate the City for the costs of appeals to
the Board of Supervisors.
(B)
If the determination is that the project does not qualify for a
Community exemption or exclusion, the applicant shall pay fees as set forth in S~ubsection (c)
below.
(c)
The fees for projects determined not to qualify for a Community exemption or
exclusion are as follows. A $120 surcharge shall be added to these fees to compensate the
City for the costs of appeals to the Board of Supervisors:
( 1)
For an initial study excluding use of special expertise or technical
assistance the initial fee shall be:
Where the total estimated construction cost as defined by the San Francisco
Building Code is between $0 and $9,999: $1,499;
Where said total estimated construction cost is $10,000 or more, but less than
$200,000: $6,227 PLUS 2.833% of the cost over $10,000;
Mayor Lurie; Supervisor Dorsey
BOARD OF SUPERVISORS
Page 20
Where said total estimated construction cost is $200,000 or more, but less than
$1,000,000: $11,715 PLUS 2.141 % of the cost over $200,000;
Where said total estimated construction cost is $1,000,000 or more, but less
than $10,000,000: $29,178 PLUS 1.796% of the cost over $1,000,000;
Where said total estimated construction cost is $10,000,000 or more, but less
than $30,000,000: $194,017 PLUS 0.553% of the cost over $10,000,000;
Where said total estimated construction cost is $30,000,000 or more, but less
than $50,000,000: $306,896 PLUS 0.208% of the cost over $30,000,000;
Where said total estimated construction cost is $50,000,000 or more, but less
than $100,000,000: $349,413 PLUS 0.049% of the cost over $50,000,000;
Where said total estimated construction cost is $100,000,000 or more: $374,723
PL[JS 0.019% ofthe cest ever $100,000,000.
An applicant proposing major revisions to a project application that has been
inactive for more than six months and is assigned shall submit a new application. An applicant
proposing significant revisions to a project which has not been assigned and for which an
application is on file with the Planning Department shall be charged time and materials to
cover the full costs in excess of the initial fee paid.
(2)
For preparation of an environmental impact report excluding use of
special expertise or technical assistance, the initial fee shall be:
Where the total estimated construction cost as defined in the San Francisco
Building Code is between $0 to $199,999: $33,263;
Where said total estimated construction cost is $200,000 or more, but less than
$1,000,000: $33,263 PLUS 0.818% of the cost over $200,000;
Where said total estimated construction cost is $1,000,000 or more, but less
than $10,000,000: $40,113 PLUS 0.553% of the cost over $1,000,000;
Mayor Lurie; Supervisor Dorsey
BOARD OF SUPERVISORS
Page 21
Where said total estimated construction cost is $10,000,000 or more, but less
than $30,000,000: $90,908 PLUS 0.227% of the cost over $10,000,000;
Where said total estimated construction cost is $30,000,000 or more, but less
than $50,000,000: $137,223 PLUS 0.061 % of the cost over $30,000,000;
Where said total construction cost is $50,000,000 or more, but less than
$100,000,000: $149,941 PLUS 0.061 % of the cost over $50,000,000;
Where said total estimated construction cost is $100,000,000 or more: $181,737
PLUS 0.019% &fthe cost mer $100,000,000.
An applicant proposing major revisions to a project application that has been
inactive for more than six months and is assigned shall submit a new application. An applicant
proposing significant revisions to a project which has not been assigned and for which an
application is on file with the Planning Department shall be charged time and materials to
cover the full costs in excess of the initial fee paid.
(3)
For the preparation of a focused Environmental Impact Report: one-half
the fee that would be required for a full environmental impact report, as set forth in
Paragraphsubsection (c)(2) above, plus time and materials.
(4)
The fees listed listed in subsection (c) above will sunset 20 years after the
effective date of Plan Adoption.
Section 6. Effective Date. This ordinance shall become effective 30 days after
enactment. Enactment occurs when the Mayor signs the ordinance, the Mayor returns the
ordinance unsigned or does not sign the ordinance within ten days of receiving it, or the Board
of Supervisors overrides the Mayor's veto of the ordinance.
Mayor Lurie; Supervisor Dorsey
BOARD OF SUPERVISORS
Page 22
Section 7. Scope of Ordinance. In enacting this ordinance, the Board of Supervisors
intends to amend only those words, phrases, paragraphs, subsections, sections, articles,
numbers, punctuation marks, charts, diagrams, or any other constituent parts of the Municipal
Code that are explicitly shown in this ordinance as additions, deletions, Board amendment
additions, and Board amendment deletions in accordance with the "Note" that appears under
the official title of the ordinance.
Section 8. Effect of Ordinance on Ordinance No. 149-16; Directions to Clerk of the
Board of Supervisors.
As it pertains to Planning fees, this ordinance has the effect of amending and
superseding certain of those provisions in Section 4 of Ordinance No. 149-16 setting the fees.
Accordingly, to maximize public notice of these changes, upon the effective date of this
ordinance, the Clerk of the Board of Supervisors shall place a copy of this ordinance in Board
File No. 160632, the file for Ordinance No. 149-16, and shall indicate on the Board's website
chart for ordinances enacted in 2016 that Ordinance No. 149-16 has been superseded in part
by this ordinance.
Section 9. Retroactivity.
As noted in Section 5, the fee reductions in Section 5 of this ordinance shall apply to
any project that submits a Development Application on or after September 2, 2025.
APPROVED AS TO FORM:
DAVID CHIU, City Attorney
By:
/s/
AUSTIN M. YANG
Deputy City Attorney
n:\legana\as202512500381 \01865767.docx
Mayor Lurie; Supervisor Dorsey
BOARD OF SUPERVISORS
Page 23
City and County of San Francisco
Tails
Ordinance
City Hall
I Dr. Carlton B. Goodlett Place
San Francisco, CA 94102-4689
File Number:
250888
Date Passed:
November 18, 2025
Ordinance amending the Planning Code to require certain Planning Department fees to be paid to the
Department at the time the Development Application is submitted, modify the environmental review fees
for large projects, and remove the separate fee schedule for "Class 32" categorical exemptions under
the California Environmental Quality Act; affirming the Planning Department's determination under the
California Environmental Quality Act; making findings of consistency with the General Plan, and the
eight priority policies of Planning Code, Section 101.1; and making findings of public necessity,
convenience, and welfare pursuant to Planning Code, Section 302.
November 03, 2025 Land Use and Transportation Committee - RECOMMENDED AS
COMMITTEE REPORT
November 03, 2025 Land Use and Transportation Committee - RECOMMENDED AS
COMMITTEE REPORT
November 04, 2025 Board of Supervisors - PASSED, ON FIRST READING
Ayes: 10 - Chan, Chen, Dorsey, Fielder, Mahmood, Mandelman, Melgar, Sauter,
Sherrill and Walton
November 18, 2025 Board of Supervisors - Fl NALLY PASSED
City mu[ Co1111ty of Sau Fra11cisco
Ayes: 10 - Chan, Chen, Dorsey, Fielder, Mahmood, Mandelman, Melgar, Sauter,
Sherrill and Walton
Page 1
Pri11ted at 9:32 am 011 11/19/25
File No. 250888
City all(/ County of San Francisco
Daniel Lurie
Mayor
I hereby certify that the foregoing
Ordinance was Fl NALLY PASSED on
11/18/2025 by the Board of Supervisors of
the City and County of San Francisco.
tJO'V l J
Date Approved
Printed at 9:32 am 011 11/19/25