Corpus Christi Code of Ordinances § 35-100 Blowout prevention—Land and bay areas.
Sec. 35-100. - Blowout prevention—Land and bay areas.
The bore hole of any well while being drilled or reworked shall at all times contain drilling fluid of a weight and viscosity which a reasonably prudent operator would use to keep the well under control.
In areas where pressure conditions are unknown, or are known to be high, a pressure control system consisting of sufficient conductor pipe and a diverter mechanism shall be installed. The operator shall file the plan, for approval by the petroleum superintendent, with the drilling permit application. For land wells drilled to depths less than nine thousand (9,000) feet, the length of surface casing shall in no case be less than eleven-hundredths (0.11) of the length of the next string of pipe proposed to be set and two (2) dual controlled, fluid operated blowout preventers shall be used for all drilling or completion operations involving the use of drill pipe or tubing after the surface casing has been set. For all land wells drilled to depths below nine thousand (9,000) feet and all wells located in marine areas except the Gulf of Mexico, the length of surface causing shall in no case be less than fifteen-hundredths (0.15) of the length of the next string of pipe proposed to be set and the minimum blowout preventer stacks to be installed on the surface casing before drilling out or working over shall consist of one set equipped with blanks, one set equipped with rams, one hydrill type and a choke manifold. Any exception to Railroad Commission of Texas Statewide Rule 13A as amended January 1, 1983, shall be approved by the petroleum superintendent.
(Ord. No. 18177, § 1, 4-11-1984)