§ 27-48 — Refilling excavation
Code of Ordinances, City of Burlington, Vermont (Current through Ord. 8-3-26, passed August 3, 2026) · Burlington Code of Ordinances § 27-48
Corpus is an independent public-information project, not the official City of Burlington website. Stable reference: corpuslaw.us/code/6a46f810-5287-4c30-9056-ba16d1239943
27-48 Refilling excavation.
(a) Where a permit has been issued, the permittee(s) shall notify the superintendent of streets or his designee of the time and date when it will commence the backfilling of the excavations pursuant to the permit. Where no permit has been issued pursuant to subsection 27-29(d) because of an emergency situation, the excavator shall nonetheless likewise notify the superintendent or his designee of the time and date of backfilling. Unless otherwise waived by the superintendent, the superintendent of streets or his designee will be present to monitor the backfilling for the purposes of ascertaining whether the backfill material is proper and adequately compacted. In the event the inspecting official determines that the permittee is not using acceptable backfill materials or acceptable backfilling procedures, he may order the suspension of all work at the site. The superintendent of streets or his designee may require the permittee(s) to furnish a soil test by a recognized soil testing laboratory or registered professional engineer specializing in soil mechanics in order to determine whether the backfill for the excavation was adequately compacted. All expense of such tests shall be borne by the permittee. (b) In order for resurfacing to commence, such test must demonstrate that the backfill material meets the requirements for composition and compaction as prescribed by the board of street commissioners. (c) All backfilling shall be done in a manner that will permit the restoration of the surface to a density condition not less than that existing prior to excavation. (d) The permittee(s) shall establish grass by sodding or seeding at the discretion of the superintendent of streets. Where existing topsoil is deemed of insufficient quality the superintendent of streets may require that new topsoil be used to replace the top six (6) inches. The superintendent shall require that either seeding or sodding be used to establish turf in accordance with specifications approved by the parks and recreation commission.
(Ord. of 1-18-82)
Ask a question about Burlington law
Corpus searches the Burlington sections it holds and shows the ones that match, with their citations. Free, no sign-in.