For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 23-83 — Pretreatment compliance

Charlotte City Code (Supp. No. 57: codified through Ordinance No. 10171, enacted June 22, 2026) · Charlotte City Code § 23-83

Corpus is an independent public-information project, not the official City of Charlotte website. Stable reference: corpuslaw.us/code/6ab97741-f97a-4f96-8123-52df8d64a1a8

Sec. 23-83. - Pretreatment compliance.

(a) Pretreatment facilities. IUs shall provide wastewater treatment as necessary to comply with this article and wastewater permits issued under section 23-87 and shall achieve compliance with applicable standards and requirements within the time limitations as specified by the Environmental Protection Agency, the state or CMUD, whichever is most stringent. Any facilities necessary for compliance shall be provided, operated and maintained at the IU's expense. Detailed plans for the pretreatment facilities signed and sealed by a professional engineer of this state shall be delivered to and received by CMUD for review, and an authorization to construct shall be issued by CMUD prior to construction of the pretreatment facilities. The IU shall be solely responsible for the design, construction and operation of such pretreatment facilities as may be necessary to comply with this article. The review of such plans and operating procedures and the issuance of the authorization to construct will in no way relieve the IU from the responsibility of modifying the facilities as necessary to produce an effluent which complies with this article. Any subsequent changes in the pretreatment facilities or method of operation shall be reported to and be approved by CMUD prior to the IU's initiation of the changes. (b) Additional pretreatment measures. Additional pretreatment measures are as follows: (1) Whenever deemed necessary, CMUD may require an industrial user to restrict its discharge during peak flow periods, designate that certain wastewater be discharged only into specific sewers, relocate and/or consolidate points of discharge, separate domestic sewage waste streams from industrial waste streams, and comply with such other conditions as may be necessary to protect the POTW and determine the user's compliance with the requirements of this article. Suspension of wastewater treatment service shall be subject to subsection 23-95(f). (2) CMUD may require any IU discharging into the POTW to install and maintain, on the IU's property and at the IU's expense, an authorized storage and flow-control facility to ensure equalization of flow. A wastewater discharge permit may be issued solely for flow equalization. (3) Grease, oil and/or sand interceptors shall be installed by the IU, at the IU's expense and on the IU's property, when necessary to comply with this article. All interceptor units shall be located to be easily accessible for cleaning and inspection. Such interceptors shall be inspected, cleaned, and repaired regularly, as needed, by the IU at the IU's expense. (4) CMUD may require an IU, who has the potential to discharge flammable substances to the POTW, to install, maintain, and operate, at the IU's expense, an authorized combustible gas detection meter. (5) CMUD may require an IU, who has the potential to discharge wastewater in violation of pretreatment standards, to install, maintain, and operate, at the IU's expense, an authorized pH controller and meter related to pH.

(Ord. No. 5230, § 1(Exh. A), 10-28-2013)

Ask a question about Charlotte law

Corpus searches the Charlotte sections it holds and shows the ones that match, with their citations. Free, no sign-in.