Sec. 21-92. - General requirements and regulations concerning street excavation.
(a) Original condition. Permittee shall return the right-of-way to its original condition or better in all areas affected by said street cut.
(b) Street specifications.
(1) Crushed stone screened to a maximum size of one-inch diameter or crusher run (blended crushed stone) shall be the only material allowed for back fill purposes in the roadway portion of the right-of-way or under sidewalks, curbs, curb and gutter, or any associated structure. Crushed stone back fill shall extend a minimum of twelve (12) inches beyond the edge of the roadway or other structures.
(2) All excavations within the roadway portion of a right-of-way shall be saw cut or cut with a pavement breaker attached to a jackhammer. Roadways with a concrete running surface must be saw cut to a depth that will assure a straight, smooth joint when repaired. Permittee shall where applicable enlarge the excavation to an adjacent expansion joint or enlarge the excavation to remove prior cracks or damaged areas that may prevent the satisfactory repair of the roadway.
(3) Prior to the placement of concrete or asphalt, the excavation must be cut square with a support shoulder provided. (See diagram [7]).
(4) Roadways having a concrete surface must be repaired with a ready-mix (3000 psi) class A concrete.
(5) Roadways having an asphalt surface must be repaired with Alabama Highway Department specification 424A hot mix asphalt or latest edition.
(6) Roadways having asphalt over concrete shall be repaired with the appropriate corresponding depth of concrete and asphalt.
(7) Asphalt patches must be compacted using a mechanical vibrator tamp or steel wheel roller designed for the purpose of compacting asphalt. Asphalt patches shall be a minimum of five and one-half (5½) inches thick or match the existing thickness of overlaying asphalt, whichever is greater.
(c) Sidewalk specifications.
(1) Any sidewalk or curb and gutter affected by a street excavation shall be saw cut to a depth that will assure a straight, smooth joint when repaired. Permittee shall where applicable remove existing sidewalks and/or curb and gutter to an adjacent expansion joint or enlarge the excavation to remove prior cracks or damaged areas that may prevent the satisfactory repair of the sidewalk or curb and gutter. When completed, expansion joints shall be consistent with joints in the adjacent sidewalks.
(2) Permittee may tunnel under a sidewalk, curb or curb and gutter provided that it is possible to adequately place crushed stone under such structures. In the event of settling or breakage during excavation or warranty period, the affected structure must be removed to the nearest appropriate expansion joint or joints. Sidewalks, curb or curb and gutter must be saw cut when removed. Concrete used for repair must be Alabama State Highway Department specifications, class A 3000 psi ready-mix.
(d) General specifications.
(1) Permittee shall repair all disturbed area. These areas shall be returned to its original or better condition and shall include temporary or permanent erosion control measures as needed and such areas shall be included in the one-year warranty period. Photos shall be provided to OCE of the disturbed area prior to excavation and after repair is completed and is ready for final inspection.
(2) Permittee during performance of work over, upon or under the streets, shall provide, place and maintain work zone traffic control devices in compliance with the provisions of the latest edition of the Alabama Manual on Uniform Traffic Control Devices or as the director of the department of transportation or his designated representative may direct. Traffic control plans for all work to be performed over, upon, or under any public street within the corporate limits shall, prior to work commencing be submitted to the director of transportation. This includes a required 48-hour notice if a roadway will be closed.
(3) Permittee shall remove from work area all spoil material before work is completed. Roadway, sidewalk or curb and gutter shall be clean of mud, loose material or debris.
(4) Upon completion of all construction activity, the city shall conduct a final on-site inspection to determine the condition of the repaired area. Said inspection may be coordinated with the final inspections on adjacent lots or prior to the cessation of all construction activity. For purposes of this section, the issuance of a certificate of occupancy or the final inspection, whichever event occurs later, shall be deemed the date of the completion of all construction activity. Upon final inspection, if deficiencies are found, the permittee or their designee will be notified of any deficiencies to be remedied within the ten (10) business days of the date of final inspection. If all deficiencies are remedied and the roadway, sidewalk or curb is found in satisfactory condition upon inspection from the city engineer, a release of the bond for the one-time ten-thousand-dollar ($10,000.00) street cut bond shall be issued six (6) months after the issuance of a certificate of occupancy or the final inspection, whichever occurs later. A release of the bond for the annual fifty-thousand-dollar ($50,000.00) street cut blanket bond shall be issued eighteen (18) months after the issuance of a certificate of occupancy or the final inspection, whichever occurs later. If deficiencies are found during the six (6) months between the cessation of construction activity and the release of bond, the permittee shall be given notice to repair and if the repair is not made within ten (10) days the city may make a claim against the bond as provided in subsection (e).
(e) Bonds. Prior to the issuance of any street cut permit, a permittee shall provide to OCE a street cut bond on forms provided by the city in the amount of ten thousand dollars ($10,000.00) as a one-time bond or a fifty-thousand-dollar ($50,000.00) annual street cut blanket bond. The surety thereon must be approved by the city attorney and shall be one of the following: a cash deposit, an irrevocable letter of credit, or an insurance company doing business by an agent in the state through an attorney-in-fact. The city shall hold all bonds until it issues a release of bond; or the city may make a claim against such bonds after ten (10) days of notice of deficiencies if repairs are not completed and use the proceeds thereof for the repair or replacement of damaged public improvements in accordance with the standards found in section 21-92. The permittee shall be liable for any deficiencies or damages not covered by the bonds. In the event the city makes a claim against the bonds, the principal thereon may tender to the city the total amount of damages and thereafter receive a release of bond.
(Ord. No. 9502, 4-23-2024)