For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 23-88 — Wastewater discharge permit issuance process conditions

Charlotte City Code (Supp. No. 57: codified through Ordinance No. 10171, enacted June 22, 2026) · Charlotte City Code § 23-88

Corpus is an independent public-information project, not the official City of Charlotte website. Stable reference: corpuslaw.us/code/6c5663a6-c2e5-4b14-bfaf-47154b98e6af

Sec. 23-88. - Wastewater discharge permit issuance process conditions.

(a) Duties of CMUD. Prior to issuance of a wastewater discharge permit, CMUD shall perform the following: (1) Conduct an on-site inspection of the facility including any pretreatment facilities. (2) Determine the following: a. Discharge limitations for those pollutants proposed to be limited; b. Monitoring requirements for pollutants which are suspected to be present but which are not proposed to be limited at the time the permit is issued. After issuance, the permit may be modified pursuant to subsection 23-90(b) to impose limits on one or more of such pollutants; c. Where applicable, a proposed schedule of compliance, including interim dates and requirements, for meeting the proposed limitations to include, but not be limited to, installation of a new monitoring point and/or of flow measuring equipment; and d. Other proposed special conditions which will have an impact on the discharge described in the application. (3) Organize information from the permit application and inspection report into a permit synopsis to include, but not be limited to, the following: a. A sketch and detailed description of the industrial facilities and pretreatment facilities, if any, including the location of all points of discharge to the POTW and all established compliance monitoring points; and b. A quantitative description of the discharge described in the application which includes at least the following: 1. The rate or frequency of the proposed discharge; if the discharge is continuous, the average daily flow; 2. The actual average daily discharge in pounds per day of any limited pollutant and any pollutant identified in the application as known or suspected present; 3. The basis or rationale, for the pretreatment limitations, including the documentation of any calculations used in applying categorical pretreatment standards; and documentation of the rationale of any parameter for which monitoring has been waived under 40 CFR Part 403.12(e)(2). c. An allocation table (AT) listing permit information for all SIU's, including but not limited to permit limits, permit effective and expiration dates, and a comparison of total permitted flows and loads with division approved maximum allowable loadings of the POTW, including flow, on forms or in a format approved by the division. The AT shall be updated as permits are issued or renewed, and as permits are modified where the permitted limits or other AT information is revised. The synopsis shall be submitted to the state as well as made available to the public and the user, upon request, where in compliance with section 23-94 of this article. (b) Final action on SIU permit applications. Procedures for final action on SIU permit applications are as follows: (1) CMUD shall take final action on all applications within a reasonable timeframe following receipt of a complete application. (2) CMUD is authorized to: a. Issue an SIU permit containing such conditions as are necessary to effectuate the purposes of this article and G.S. 143-215.1. b. Issue an SIU permit containing time schedules for achieving compliance with applicable pretreatment standards and requirements. c. Deny a permit application when in the opinion of CMUD such discharge may cause or contribute to pass through or interference of the POTW wastewater treatment plant or where necessary to achieve the purposes of G.S. 143-215.1. d. Determine, based on the application, that the applicant is not an SIU. (c) Permit conditions. Conditions may be placed on the permit as follows: (1) CMUD shall have the authority to grant a permit with such conditions attached as are necessary to achieve the purpose of this article and G.S. 143-215.1. Wastewater discharge permits shall contain, but are not limited to, the following: a. A statement of duration (in no case more than five years); b. A statement of non-transferability; c. Applicable effluent limits based on categorical standards or local limits, or both; d. Applicable monitoring, sampling, reporting, notification, and recordkeeping requirements. These requirements shall include an identification of pollutants to be monitored, sampling location, sampling frequency, and sample type based on federal, state and local law; e. Requirements for notifying the POTW in the event of an accidental discharge or slug load as defined in section 23-77; f. Requirements to implement a plan or other controls for prevention of accidental discharges and/or slug loads as defined in section 23-77 if determined by CMUD to be necessary for the user; g. Requirements for immediately notifying the POTW of any changes at its facility affecting the potential for spills and other accidental discharges, or slug load as defined in section 23-77. Also see subsections 23-91(e) and (f); and h. A statement that the permittee is subject to applicable civil and/or criminal penalties for violation of pretreatment standards and requirements and any applicable compliance schedule. (2) In addition, permits may contain, but are not limited to, the following: a. Limits on the average and/or daily maximum wastewater flows, based on water used, as defined by CMUD. b. Limits on average and/or daily maximum rates and/or times of discharge and/or requirements for flow regulations and equalization. c. The unit charge or schedule of user charges and fees for the management of the wastewater discharged to the system. d. Requirements for installation and maintenance of inspection and sampling facilities. e. Specifications for monitoring programs, which may include sampling locations, frequency of sampling, number, types and standards for tests and reporting schedules. f. Compliance schedules for meeting pretreatment standards and requirements; g. Requirements for submission of periodic self-monitoring or special notification reports. h. Requirements for maintaining and retaining plans and records relating to wastewater discharges as specified in subsection 23-91(o) and affording CMUD access thereto. i. Requirements for prior notification and approval by CMUD of any new introduction of wastewater pollutants or of any significant change in the volume or character of the wastewater prior to introduction in the POTW. j. Limits on the instantaneous, daily and/or monthly average and/or maximum concentration, mass, or other measure of identified wastewater pollutants or properties. k. Requirements for the installation of pretreatment technology or construction of appropriate containment devices, etc., designed to reduce, eliminate, or prevent the introduction of pollutants into the treatment works. l. Development and implementation of waste minimization plans to reduce the amount of pollutants discharged to the municipal wastewater system. m. Requirements for immediate reporting of any instance of noncompliance and for automatic resampling and reporting within 30 days where self-monitoring indicates a violation. n. Requirements for the prior notification to and approval by CMUD of any change or expansion in the manufacturing/production and/or pretreatment process used by the permittee, which has potential to impact the characteristics or volume of the discharge or the manner in which the discharge is regulated. o. A statement that compliance with the permit does not relieve the permittee of responsibility for compliance with all applicable federal and state pretreatment standards, including those which become effective during the term of the permit. p. Other conditions as deemed appropriate by CMUD to ensure compliance with this article and state and federal laws, rules and regulations. (d) General and limited conditions. The permit may contain general and limited conditions as follows: (1) The director is authorized to establish one or more general conditions for inclusion in all wastewater discharge permits. In addition, the director is authorized to designate one or more classes of users and may establish one or more limited conditions for inclusion in all wastewater discharge permits issued to users in a designated class. (2) In designating a class, the director shall identify one or more common factors characterizing the members of such class and determine that at least five permitted users satisfy all of such factors. Before a condition established or class designated pursuant to this subsection may take effect, written notice of such condition or class shall be given to all users holding a permit at the time that such condition or class is proposed, and such users shall be allowed at least 30 days within which to submit written comments to the director. Thereafter, the director may make such condition or class effective without modification or may modify such condition or class without further notice to any person. (3) For each condition established pursuant to this subsection, the director shall determine the effective date thereof. Thereafter, such general condition shall be included in every wastewater discharge permit, and such limited condition shall be included in every wastewater discharge permit of any user in the designated class associated with such limited condition.

(Ord. No. 5230, § 1(Exh. A), 10-28-2013)

Ask a question about Charlotte law

Corpus searches the Charlotte sections it holds and shows the ones that match, with their citations. Free, no sign-in.