§ 25-88 — Wastewater; minimum requirements for connection to sewer system
Peoria, Arizona, City Code (2026 S-10: Local legislation current through Ord. 2026-20, passed 10-6-26) · Peoria, Ariz., City Code § 25-88
Corpus is an independent public-information project, not the official City of Peoria website. Stable reference: corpuslaw.us/code/6c896a06-fff4-4445-9490-2b6e95e5d6ad
Sec. 25-88. Wastewater; minimum requirements for connection to sewer system.
All development within the City's sewer service area and within a quarter of a mile (1,320 feet) from a City sewer line is required to connect to the City's sewer system. The extension of a City sewer line and the connection to the City's sewer system will be constructed in accordance with City standards and City approved plans. Any such extension and connection shall be the sole financial responsibility of the developer and/or customer. The connection to the City's sewer system and the extension of the sewer line are a condition of issuance of a building permit. The Water Services Director will have discretion to allow variances to this requirement for single lot developments, if either such development is on a major arterial road or the connection is determined not to be feasible. (Code 1977, § 12-3-2; Ord. No. 92-03, 2/11/92, Amended; Ord. No. 02-41, 6/7/02, Amended (SUPP 2002-2); Ord. No. 08-35, 12/02/08, Repealed Sec. 25-88. Wastewater; construction and ownership of public sewer lines and related facilities maintained by the engineering department., Enacted Sec. 25-88. Wastewater; minimum requirements for connection to sewer system. (SUPP 2008-4); Ord. No. 2017-36, § 37, 6-13-17; Ord. No. 2026-01, § 33, 1-13-26)
Ask a question about Peoria law
Corpus searches the Peoria sections it holds and shows the ones that match, with their citations. Free, no sign-in.
