Technical report.
Salem Revised Code § 82.035
in effectSec. 82.035. - Technical report.
(a) The technical report, if required, shall include:
(1) A comprehensive description of the site topography and geology;
(2) An opinion as to the adequacy of the proposed activity;
(3) An opinion as to the extent that instability on adjacent properties may adversely affect the project;
(4) A description of the field investigation and findings;
(5) Conclusions regarding the effect of geologic conditions on the proposed development;
(6) Specific requirements for grading plan modification, corrective grading, and special techniques and systems to facilitate a safe and stable development; and
(7) Other recommendations, as necessary, commensurate with the project grading and development.
(b) The technical report shall bear the signature and stamp of a certified professional.
(c) Any recommendations made in the technical report that are more stringent than the requirements of this chapter shall be made part of any permit issued pursuant to this chapter. Any recommendations made in the technical report that are less stringent than the requirements of this chapter may be made part of any permit issued pursuant to this chapter, if approved by the Director. The Director may require a geotechnical report prepared and stamped by a geotechnical engineer or equally qualified person approved by the Director in order to approve less stringent standards or methods.
(Ord. No. 6-16, § 1(82.035), 5-23-2016)