§ 536-402 — Notice of availability for inspection as a condition to the accomplishment of further work

Revised Code of the Consolidated City and County of Indianapolis-Marion County (Supp. No. 47, Update 2: codified through Ordinance No. 42, 2026, passed June 1, 2026) · Indianapolis-Marion County Revised Code § 536-402

Corpus is an independent public-information project, not the official City of Indianapolis website. Stable reference: corpuslaw.us/code/6d24cd3c-d2cd-41c9-a5c9-e654ee685388

Sec. 536-402. - Notice of availability for inspection as a condition to the accomplishment of further work.

(a) Whenever a stage of construction is reached that is designated below, the person, partnership or corporation that obtained the permit shall be under a duty to give appropriate notice to the administrator as assigned by the deputy director of the division of construction and business services that the construction is available for inspection. (b) Relative to the construction of, remodeling of or addition to a structure, notice of availability is required, as applicable, for: (1) A "foundation inspection" after poles or piers are set, trenches or basement areas excavated, any required reinforcing steel is in place, but prior to the placing of concrete; and (2) A "frame and masonry inspection" after the roof, masonry, all framing, firestopping and bracings are in place and all electrical wiring, pipes, chimneys and vents are complete, but prior to the interior covering of walls. (c) Relative to the installation, modernization or replacement of building equipment (including but not limited to plumbing work for which licensure is required by the Indiana Plumbing Commission, or work on electrical power distribution systems, heating systems, space heating equipment, cooling systems or space cooling equipment), notice of availability for a separate "rough inspection" is required, as applicable, for each of the three (3) crafts after installation, but prior to the covering or concealment thereof and before fixtures are set. (d) Relative to demolition or removal of a structure, notice of availability for a "fill inspection" is required (in the instance when a basement or subgrade chamber exists) after demolition or removal and prior to placing fill. (e) The administrator or the administrator's authorized representative may, relative to any construction, add a reasonable number of other construction stages by communicating the additional stage requirements to the person obtaining the building permit for that construction. (f) Notice of availability shall be given by the scheduling systems utilized by the division for such a purpose. (g) If a private provider is being utilized to perform inspection services of a Class 2 structure in accordance with IC 36-7-2.5, the division of construction and business services does not require notice of availability for inspection. In lieu of compliance with 536-402(a), (b) and (c), upon the completion of construction, the private provider permit holder shall submit documentation demonstrating that the applicable inspections were performed in a form prescribed by the division of construction and business services. The documentation shall be submitted to the division of construction and business services as part of the private provider's complete inspection report in accordance with 536-304 and IC 36-7-2.5.

(G.O. 63, 2009, § 28; G.O. 41, 2016, § 2; G.O. 40, 2025, § 14)