§ 803.040 — Boundary streets

Salem Revised Code, City of Salem, Oregon (Supp. No. 26: codified through Ordinance No. 10-26, adopted August 10, 2026) · Salem Revised Code § 803.040

Corpus is an independent public-information project, not the official City of Salem website. Stable reference: corpuslaw.us/code/6f11e5f0-c1ca-4433-92a5-a324fa90eb63

Sec. 803.040. - Boundary streets.

(a) General. Except as otherwise provided in this section, dedication of right-of-way for, and construction or improvement of, boundary streets of up to one-half of the right-of-way and improvement width specified in SRC 803.025 shall be required as a condition of approval for the following: (1) Subdivisions; (2) Partitions; (3) Planned unit developments; (4) Manufactured dwelling parks; and (5) The construction or enlargement of any building or structure located on property abutting a boundary street and that requires a building permit under SRC chapter 56. (b) Three-quarter street improvement. If construction of a half-street improvement is insufficient to provide for a minimum of one 12-foot-wide travel lane in each direction or proper street grade, dedication of right-of-way for, and construction or improvement of, a three-quarter street improvement may be required. (c) Additional right-of-way and improvements. Dedication and improvement of streets to greater widths than those provided in SRC 803.025 may be required when: (1) An area within a subdivision is set aside for commercial or industrial uses, or where probable future conditions warrant. (2) Topographical requirements necessitate either cuts or fills for the proper grading of the streets, additional right-of-way width or slope easements may be required to allow for all cut and fill slopes. (3) Additional area is required for stormwater facilities located within the right-of-way. (d) Exceptions. Notwithstanding subsections (a) and (b) of this section, the dedication of right-of-way for, and construction or improvement of, boundary streets is not required in the following circumstances: (1) Improvement of the boundary street abutting the property is a funded project in the Five Year Capital Improvement Program; (2) The construction of a new building or structure in a complex, if the new building or structure is less than 2,000 square feet. This exception shall be based on the extent of development existing on December 31, 1995; (3) The enlargement of any building or structure, if the enlargement results in less than a 50 percent increase in gross building area. This exception shall be based on the extent of development existing on December 31, 1995; (4) The construction or enlargement of any building or structure to be used entirely for agriculture, the keeping of livestock and other animals, or animal services, as defined in SRC chapter 400, and which involve no retail sales; (5) The conversion of, or addition to, an existing single-family detached dwelling to create a duplex, triplex, or quadplex; or (6) The construction or enlargement of any building or structure that will generate less than 20 new vehicle trips per day according to the Institute of Transportation Engineers' Trip Generation Manual. (e) Improvement. (1) All boundary street improvements shall conform to this chapter and the Public Works Design Standards. (2) The maximum amount of street widening shall not exceed 17 feet on the development side, plus curb, gutters, sidewalks, bike lanes, stormwater facilities, street lights, and signing where appropriate. The minimum requirement for the opposite side of the centerline is a 12-foot-wide paved travel lane. The boundary street improvement shall be provided along the full length of the boundary. (3) If development is proposed for only a portion of a development site or complex, the boundary street improvement shall be provided as follows: (A) Where the area of development exceeds 25 percent of the total development site or complex area, the street improvements shall be the greater of either the actual street frontage of the phase being developed, or the percentage of street frontage equal to the percentage of area being developed. (B) Where the area of development is equal to or less than 25 percent of the total development site or complex area, the street improvement shall be provided in accordance with the following formula: (i) Frontage of Required Street Improvement = Proposed Area of Development ÷ Area of Undeveloped Site x Total Street Frontage of Entire Development Site or Complex. (C) As used in this subsection, the term "area of development" means that area required for structures, setbacks, off-street parking, landscaping, and any special setbacks.

(Prior Code, § 803.040; Ord. No. 31-13; Ord. No. 13-21, § 1(Exh. A), 2-14-2022)