§ 74-513 — Stormwater management standards

Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta City Code § 74-513

Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/6f1d5cc4-6b3b-48b3-86b6-984d05f1d71b

Sec. 74-513. - Stormwater management standards.

For new development, the following standards shall be applied to the area of the site impacted by the proposed work. For redevelopment, the following standards shall be applied to the area of the site impacted by the proposed work, provided that the impacted area does not exceed 35 percent of the previously developed area. If the impacted area exceeds 35 percent of the previously developed area, the following standards shall be applied to the entire site, including the previously developed area: (a) Runoff reduction. The runoff volume generated by the first 1.0" of rainfall shall be retained on-site in order to help maintain pre-development site hydrology and help protect the local watershed from several indirect impacts of the development process, including decreased groundwater recharge, decreased baseflow and degraded water quality. A stormwater management system is presumed to comply with this criterion if: (1) It includes green infrastructure practices that provide for the interception and evapotranspiration, infiltration, or capture and reuse of runoff, that have been selected, designed, constructed and maintained in accordance with the Georgia Stormwater Management Manual; or constitutes an alternative practice responsibly designed and documented by a professional engineer to reproduce the intent of the Georgia Stormwater Management Manual; and (2) It is designed to provide the amount of runoff reduction from the runoff generated by the first 1.0" of rainfall as specified in the latest edition of the Georgia Stormwater Management Manual. (3) The applicant shall prioritize stormwater management measures used to meet the runoff reduction standard in the following order: a. Vegetated infiltration BMPs: bioretention, stormwater planters, etc. b. Permeable pavements. c. Green roofs, rainwater harvesting and reuse, and lined bioretention or lined stormwater planters. d. Infiltration practices installed underground, specifically dry wells, modified french drains, and similar practices. (b) Water quality protection. All runoff generated from a site shall be adequately treated before discharge using stormwater management measures that remove at least 80 percent of the calculated average annual post-development total suspended solids (TSS) load as defined in the Georgia Stormwater Management Manual for Runoff from a 1.2 inch rainfall event. it will be presumed that a stormwater management system complies with this requirement if it satisfies the runoff reduction criteria in section 74-513(a). All water quality protection measures shall be designed and constructed in accordance with the following criteria: (1) The measure shall be sized to treat the prescribed water quality treatment volume from the site, as defined in the Georgia Stormwater Management Manual; (2) Appropriate stormwater management measures are selected, designed, constructed or preserved, and maintained according to the specific criteria in the Georgia Stormwater Management Manual; or constitutes an alternative practice responsibly designed and documented by a professional engineer to reproduce the intent of the Georgia Stormwater Management Manual; and (3) Runoff from a high risk operation or hotspot is adequately treated and addressed through the use of appropriate stormwater management measures and pollution prevention practices. (c) Stream channel protection. Protection of stream channels from bank and bed erosion and degradation shall be provided by using all the following approaches: (1) Preservation, restoration, or reforestation with native vegetation of the applicable stream buffer pursuant to chapter 74 article VII of the Code. (2) Twenty-four-hour extended detention of the one-year, 24-hour return frequency storm event. (3) Erosion prevention measures such as energy dissipation and velocity control. This stormwater management standard shall not be waived, however for development that creates, adds, or demolishes and replaces less than 5,000 square feet of impervious surface and meets the performance criteria of section 74-513(a) and (b), stream channel protection is not required. (d) Overbank flood protection. For new development, overbank flood protection and property protection shall be provided by attenuating the post-development peak discharge rate to the pre-development rate up to the 25-year, 24-hour return frequency storm event. For redevelopment, overbank flood protection and property protection shall be provided by reducing the peak discharge rate up to the 25-year, 24-hour storm event in accordance with the following formula: [image omitted; see the official code] PIS = Pre-Development Impervious Surface PDRR = Peak Discharge Rate Reduction For sites where previous demolition has removed impervious surfaces, pre-development peak discharge rate calculations and percentage of impervious surface shall be calculated based on pre-demolition conditions. For sites that have been demolished and have remained fallow and stabilized with vegetation for a minimum of five years, they shall be considered as having pre-development conditions of 20% impervious surface for purposes of calculating peak discharge rate reduction. For development permitted post-2004 and served by appropriate stormwater management facilities, subsequent redevelopment of the same area is not required to further reduce the peak discharge rate, provided that the site continues to meet the reduction previously achieved. For redevelopment that creates, adds, or demolishes and replaces less than 5,000 square feet of impervious surface and meets the stormwater management standards in section 74-513(a) and (b), overbank flood protection is not required. (e) Extreme flood protection. Extreme flood protection and public safety protection shall be provided by attenuating and safely conveying the 100-year, 24-hour return frequency storm event without any increase in peak discharge rate, such that flooding is not exacerbated. For redevelopment that creates, adds, or demolishes and replaces less than 5,000 square feet of impervious surface and meets the stormwater management standards in section 74-513(a) and (b), extreme flood protection is not required. (f) Structural stormwater controls. (1) All structural stormwater controls shall be selected and designed using the appropriate criteria from the Georgia Stormwater Management Manual. (2) All structural stormwater controls must be designed appropriately to meet their intended function. (3) For other structural stormwater controls not included in the Georgia Stormwater Management Manual, or for which pollutant removal rates have not been provided, the effectiveness and pollutant removal of the structural control must be documented through prior studies, literature reviews, or other means and receive approval from the city before being included in the design of a stormwater management system. (4) In addition, if hydrologic or topographic conditions, or land use activities warrant greater control than that provided by the minimum control requirements, the city may impose additional requirements deemed necessary to protect upstream and downstream properties and aquatic resources from damage due to increased volume, frequency, and rate of runoff or increased nonpoint source pollution loads created on the site. (5) Applicant or owner shall consult the Georgia Stormwater Management Manual for guidance on the factors that determine site design feasibility when selecting and locating a structural stormwater control. (g) Credits for stormwater better site design. The applicant or owner may take credit for stormwater better site design and reduce the water quality volume and runoff reduction requirements. The site design practices that qualify for this credit and the criteria and procedures for applying and calculating the credits are included in the Georgia Stormwater Management Manual. (h) Drainage system guidelines. Stormwater conveyance facilities, which may include but are not limited to culverts, stormwater drainage pipes, catch basins, drop inlets, junction boxes, headwalls, gutters, swales, channels, ditches, and energy dissipaters shall be provided when necessary for the protection of public right-of-way and private properties adjoining sites and/or public rights-of-way. Stormwater conveyance facilities that are designed to carry runoff from more than one parcel, existing or proposed, shall meet the following requirements: (1) Methods to calculate stormwater flows shall be in accordance with the Georgia Stormwater Management Manual. (2) All culverts, pipe systems and open channel flow systems shall be sized in accordance with the stormwater management plan, using the methods in the Georgia Stormwater Management Manual. (3) Design and construction of stormwater conveyance facilities shall be in accordance with the criteria and specifications found in the Georgia Stormwater Management Manual. (4) Stormwater management facilities shall be designed and installed according to an approved application for sewer service capacity. (5) Stormwater management facilities, including conveyance facilities shall not discharge to the surface of public rights-of-way. (i) Rules for dam safety and any other applicable federal, state, or local requirement. Any development that proposes a dam shall comply with the Georgia Safe Dams Act and Rules for Dam Safety as applicable. (j) All development, including development exempted from this article under section 74-504(d), shall comply with the following minimum requirements: (1) Lots and buildings shall be developed in a manner to ensure that stormwater exiting individual parcels or lots under post-development conditions does not adversely impact the adjacent parcels or lots as a result of concentrated flows, flooding, erosion, or deposits of silt or sediment. (2) The stormwater discharge from a downspout, cistern, or any water collection device shall be located a distance of no less than ten feet from common property line and oriented so the direction of flow is not toward the adjacent property line. (3) Discharge from any downspout must be dissipated, infiltrated, or diverted such that flows are not concentrated. (4) No person shall erect, construct, or otherwise permit any obstruction that prevents the natural or contained flow of water to any component of the stormwater system of the city, unless such obstruction is allowed as part of a permit approved after compliance with this article. (5) An approved, installed stormwater management measure shall not be removed or demolished, without written permission from the city, nor shall the measure be prevented from proper operation by action, inaction, or omission by the owner or any successors in title. (6) Stormwater management plans under sections 74-511 and 74-515 that propose removing healthy, non-invasive trees solely for the construction of stormwater management systems may not be approved unless the applicant can show that no other method is feasible, including but not limited to pervious paving, green roofs, bioretention, rainwater harvesting and reuse, or a treatment train of BMPs.

(Ord. No. 2020-66(20-O-1498), § 1, 11-25-20; Ord. No. 2026-30 (26-O-1369), § 1, 7-15-26)