§ 13.28.32 — Compliance and enforcement
Code of Ordinances, City of North Las Vegas, Nevada (Supp. No. 146: codified through legislation passed and adopted on or before August 5, 2026) · North Las Vegas Municipal Code § 13.28.32
Corpus is an independent public-information project, not the official City of North Las Vegas website. Stable reference: corpuslaw.us/code/6f5d2684-232b-42df-99ad-6d1807fad939
13.28.32 - Compliance and enforcement.
A. Enforcement Response Plan. The city may adopt enforcement policies and procedures as set forth in the city's pretreatment enforcement response plan for carrying out the provisions of this chapter. The enforcement response plan is hereby incorporated by this reference. B. Publication of Industrial Users in Significant Noncompliance. The city shall publish annually, in a newspaper of general circulation that provides meaningful public notice, a list of the significant industrial users which, at any time during the previous twelve (12) months, were in significant noncompliance with applicable pretreatment standards and requirements. In addition, any industrial user found to be in significant noncompliance with paragraphs 3., 4. or 8. below shall also be published in the newspaper. The following criteria shall be used to define significant noncompliance: 1. Chronic violations of wastewater discharge limits, defined here as those in which sixty-six percent (66%) or more of all of the measurements taken for the same pollutant parameter during a six-month period exceed (by any magnitude) a numeric pretreatment standard or requirement, including instantaneous limits. 2. Technical review criteria (TRC) violations, defined here as those in which thirty-three percent (33%) or more of all of the measurements taken for the same pollutant parameter taken during a six-month period equal or exceed the product of the numeric pretreatment standard or requirement including instantaneous limits multiplied by the applicable TRC (TRC = 1.4 for BOD, TSS, fats, oil, and grease, and 1.2 for all other pollutants except pH). 3. Any other violation of a pretreatment standard or requirement (daily maximum, long-term average, instantaneous limit, or narrative standard) that the POTW determines has caused, alone or in combination with other discharges, interference or pass through (including endangering the health of POTW personnel or the general public). 4. Any discharge of a pollutant that has caused imminent endangerment to human health, welfare, or the environment or has resulted in the POTW's exercise of its emergency authority to halt or prevent such a discharge. 5. Failure to meet, within ninety (90) days after the scheduled date a compliance schedule milestone contained in a local control mechanism or enforcement order for starting construction, completing construction, or attaining final compliance. 6. Failure to provide, within forty-five (45) days after the due date, required reports such as baseline monitoring reports, compliance reports, periodic self-monitoring reports, and reports on compliance with compliance schedules; 7. Failure to accurately report noncompliance. 8. Any other violation or group of violations, which may include a violation of best management practices, which the POTW determines may adversely affect the operation or implementation of the local pretreatment program. C. Administrative Enforcement Actions. 1. Notice of Violation (NOV). Whenever the director finds that an industrial user has violated or continues to violate, any provision of this chapter, an industrial wastewater discharge permit, authorization or order issued hereunder, or any other pretreatment standard or requirement, the director may serve upon such industrial user a written notice of violation. Within five working days of the receipt of such notice, an explanation of the violation and a plan for satisfactory correction and prevention of further violations shall be submitted to the director. Submission of such a plan in no way relieves the industrial user of liability for any violations occurring before or after receipt of the notice of violation. Nothing in this section shall limit the authority of the city to take any action, including emergency actions or any other enforcement action, without first issuing a notice of violation. 2. Administrative Order. When the city finds that an industrial user has violated, or continues to violate, any provision of this chapter, an industrial wastewater discharge permit, authorization or order issued hereunder, or any other pretreatment standard or requirement, the city may issue an administrative order to the industrial user responsible for the discharge directing that the industrial user come into compliance within a specific time. If the industrial user does not come into compliance within the time provided, sewer service may be discontinued unless adequate treatment facilities, devices, or other related appurtenances are installed and properly operated. Compliance orders also may contain other requirements to address the noncompliance, including additional self-monitoring and management practices designed to minimize the amount of pollutants discharged to the POTW. An administrative order may not extend the deadline for compliance established for a pretreatment standard or requirement, nor does a compliance order relieve the industrial user of liability for any violation, including any continuing violation. Issuance of a compliance order shall not be a bar against, or a prerequisite for, taking any other action against the industrial user. 3. Consent Order. The city may enter into a consent order, assurances of voluntary compliance, or other similar documents establishing an agreement with any industrial user responsible for noncompliance. Such documents shall include specific actions to be taken by the industrial user to correct the noncompliance within a time period specified by the document. A consent order may include penalties, supplemental environmental projects, or other conditions and requirements as agreed to by the city and the industrial user. A consent order shall have the same force and effect as a compliance order and shall be judicially enforceable. 4. Show Cause Hearing. a. The director may order an industrial user which has violated, or continues to violate, any provision of this chapter, an industrial wastewater discharge permit, authorization or order issued hereunder, or any other pretreatment standard or requirement, to appear before the director and show cause why the proposed enforcement action should not be taken. Notice shall be served on the user specifying the time and place for the meeting, the proposed enforcement action, the reasons for such action, and a request that the user show cause why the proposed enforcement action should not be taken. The notice of the meeting shall be served personally or by registered or certified mail (return receipt requested) at least ten (10) days prior to the hearing. Such notice may be served on any authorized representative of the industrial user. A show cause hearing shall not be a bar against, or prerequisite for, taking any other action against the user. b. After the director has reviewed the evidence, the director may issue an order to the industrial user responsible for the discharge directing that, following a specified time period, the sewer service be discontinued unless adequate treatment facilities, devices or other related appurtenances shall have been installed or existing treatment facilities, devices or other related appurtenances are properly operated. Further orders and directives as are necessary and appropriate to correct the violation may be issued. c. The director may use the same show cause hearing process to hear an appeal of an administrative fine from an industrial user. 5. Cease and Desist Order. a. When the director finds that an industrial user has violated, or continues to violate, any provision of this chapter, an industrial wastewater discharge permit, authorization or order issued hereunder, or any other pretreatment standard or requirement, or that the industrial user's past violations are likely to recur, the director may issue a cease and desist order to the industrial user directing it to cease and desist all such violations and directing the industrial user to: i. Immediately comply with all requirements; and ii. Take such appropriate remedial or preventive action as may be needed to properly address a continuing or threatened violation, including halting operations and/or terminating the discharge. b. Issuance of a cease and desist order shall not be a bar against, or a prerequisite for, taking any other action against the industrial user. 6. Administrative Fines. a. When the director finds that an industrial user has violated, or continues to violate, any provision of this chapter, an industrial wastewater discharge permit, authorization or order issued hereunder, or any other pretreatment standard or requirement, the director may fine such industrial user in an amount not to exceed ten thousand dollars ($10,000.00). Such fines shall be assessed on a per-violation, per day basis. In the case of monthly or other long-term average discharge limits, fines shall be assessed for each day during the period of violation. b. Industrial users desiring to appeal such fines must file a written request for a show cause hearing consistent with the requirements of 13.28.32.C.4. c. Issuance of an administrative fine shall not be a bar against, or a prerequisite for, taking any other action against the industrial user. 7. Suspension of Service. a. Endangerment to Health or Welfare of the Community. The city, through other than a formal notice to the affected industrial user, may immediately and effectively halt or prevent any discharge of pollutants into any natural waterway, surface drainage within the city, any area under jurisdiction of the city, the POTW of the city or any wastewater system tributary thereto, by any means available to them, including physical disconnection from the wastewater system, whenever it reasonably appears that such discharge presents an imminent endangerment to the health or welfare of the community. b. Endangerment to Environment or Treatment Works. The city, after written notice to the discharger may halt or prevent any discharge of pollutants into any natural waterway, surface drainage within the city, any area under jurisdiction of the city, the POTW, wastewater system tributary thereto, by any means available to them, including physical disconnection from the wastewater system, whenever such discharge presents or may present an endangerment to the environment or threatens to interfere with the operation of the POTW. c. Any person notified of a suspension of the wastewater treatment service and/or the industrial wastewater discharge permit shall immediately stop or eliminate the contribution. In the event of a failure of the person to comply voluntarily with the suspension order, the city shall take such steps as deemed necessary including immediate severance of the sewer connection, to prevent or minimize damage to the POTW system or endangerment to individuals or the environment. The city may reinstate the industrial wastewater discharge permit and/or the wastewater treatment service upon proof of the elimination of the non-complying discharge. d. A detailed written statement submitted by the industrial user describing the causes of the harmful contribution and the measures taken to prevent any future occurrence shall be provided to the city within five days of the date of occurrence. Suspension of service shall not be a bar against, or a prerequisite for, taking any other action against the industrial user. 8. Revocation of Industrial Wastewater Discharge Permit or Authorization to Discharge. a. A violation of the conditions of an industrial wastewater discharge permit, authorization, or order under this chapter or of applicable state or federal regulations shall be reason for revocation of such permit or authorization to discharge by the city as provided for in Section 13.28.16. Upon revocation of the permit, any wastewater discharge from the affected industrial user shall be considered prohibited and discharge of such wastewater in violation of this chapter. b. Any industrial user whose industrial wastewater discharge permit or authorization to discharge is revoked or who is served with a notice of an intended order for the revocation of the industrial user's authorization to discharge may file with the director a request for a hearing with respect thereto; provided, however, that the filing of such a request shall not stay the existing or proposed suspension. c. If a hearing is requested with respect to an existing or proposed suspension or revocation, other than the suspension of service because of an action taken by the city under 13.28.32.C.7, the director shall hold a hearing with respect to such suspension within fourteen (14) days after receipt of such request. The director shall provide notice of the hearing to the industrial user by hand delivery or certified mail at least five days before the hearing. The director shall conduct the hearing and the industrial user shall be allowed to present evidence in support of its request. After considering the evidence that is presented at such hearing, the director shall issue his order with respect to the suspension or revocation of the permit and/or authorization to discharge. The decision by the director shall be provided to the industrial user in writing. D. Judicial Enforcement Remedies. 1. Injunctive Relief. When the city finds that an industrial user has violated, or continues to violate, any provision of this chapter, an industrial wastewater discharge permit, or order issued hereunder, or any other pretreatment standard or requirement, the city may petition a court of competent jurisdiction for the issuance of a temporary or permanent injunction, as appropriate, which restrains or compels the specific performance of the industrial wastewater discharge permit, order, or other requirement imposed by this chapter on activities of an industrial user. the city may also seek such other action as is appropriate for legal and/or equitable relief, including a requirement for the industrial user to conduct environmental remediation. A petition for injunctive relief shall not be a bar against, or a prerequisite for, taking any other action against an industrial user. 2. Civil Penalties. a. An industrial user who has violated, or continues to violate, any provision of this chapter, an industrial wastewater discharge permit, or order issued hereunder, or any other pretreatment standard or requirement shall be liable to the city for a maximum civil penalty not to exceed twenty five thousand dollars ($25,000.00) per day per violation. In the case of a monthly or other long-term average discharge limit, penalties shall accrue for each day during the period of violation. b. The city may recover reasonable attorneys' fees, court costs, and other expenses associated with enforcement activities, including sampling and monitoring expenses, and the cost of any actual damages incurred by the city. c. Filing a suit for civil penalties shall not be a bar against, or a prerequisite for, taking any other action against an industrial user. 3. Civil/Administrative Fine Pass Through. In the event that an industrial user discharges such pollutants which cause the city to violate any condition of its NPDES permit and the city is fined by the EPA or the state for such violation, then such industrial user shall be fully liable for the total amount of the fine assessed against the city by the EPA and/or the state. 4. Criminal Penalties. a. An industrial user that willfully, recklessly or negligently violates any provision of this chapter, including making false statements, shall, upon conviction, be guilty of a misdemeanor, punishable by a fine not to exceed one thousand dollars ($1,000.00) for each violation and/or by imprisonment up to six months. Each day any violation of this chapter occurs shall constitute a separate offense. b. The city may refer violations that may warrant criminal prosecution to the U.S. Attorney General's Office, state attorney general, EPA criminal investigation division or other appropriate agency. This referral shall not preclude the city from taking a parallel administrative or civil enforcement action.
(Ord. No. 2771, § 1, 10-5-2016)
Ask a question about North Las Vegas law
Corpus searches the North Las Vegas sections it holds and shows the ones that match, with their citations. Free, no sign-in.