§ 17F.030.060 — Installation Clearance – Front, Back and Sides
Spokane Municipal Code; partial · SMC 17F.030.060 · Effective
Corpus is an independent public-information project, not the official City of Spokane website. Stable reference: corpuslaw.us/code/706f8738-c5e3-4c5b-9b90-7501121d957c
Section 17F.030.060 Installation Clearance – Front, Back and Sides
When boilers are replaced or new boilers installed in either existing or new buildings, sufficient access must be provided for inspection, maintenance, operation and repair. As a minimum clearances at sides, front and back wall shall be the manufacturer’s recommendations, but in no case less than eighteen inches. Boilers having manholes shall have five feet clearance from the manhole opening and any wall, ceiling or piping that will prevent a person from entering the boiler (Reference WAC 296-104-256).
Date Passed: Monday, August 14, 2006 Effective Date: Wednesday, September 27, 2006 ORD C33901 Section 14
Ask a question about Spokane law
Corpus searches the Spokane sections it holds and shows the ones that match, with their citations. Free, no sign-in.